← Back
Predominantly retail with other uses
600 8 AVENUE
MANHATTAN · BIN 1014493
💬 Discuss this project
1927Year Built
12Stories
K4Building Class
M1-9A/R12Zoning
39,925 sfGross Floor Area
14Units
LL97 Covered9 Open Violations ▸FISP: SWARMP
Predominantly retail with other uses · Owner of record: BRITEX ASSOCIATES · 2,943 sf lot · 13.57 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof2p · 3 filings · 19 docs
1 job · most recent 11/07/2025
Generators
FiledStatusContractorScopeMake / Model / Capacity
11/07/2025——Generators
Generators
Generac SG050NA 50 kW · Generator ×1
1 job · most recent 11/07/2025
Gas
FiledStatusContractorScope
11/07/2025——Gas
1 job · most recent 11/13/2018
FiledStatusContractorScope
11/13/2018Permit IssuedRICHARD NEU—
Building Lifecycle
All (123)Filed (14)Permit Issued (14)Signed Off (8)Facade (FISP) (15)Violation (49)Inspection (6)Objection (4)Special Inspection (13)
01/11/2026
Objection resolved — Addressed
01/05/2026
Objection resolved — Addressed
01/02/2026
Objection raised — Scope
01/02/2026
Objection raised — Cost
11/07/2025
Filed — Alteration
Disconnecting and reconnecting existing gas piping to new non-emergency gas generator on the roof. No change in use, egress or occupancy.
M00752599-I1
11/07/2025
Filed — Alteration
Replacement of existing non-emergency gas generator with new non-emergency gas generator on the roof. No change in use, egress or occupancy.
M00752592-I1
11/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Fahey
05/02/2025
Cycle 10 facade report signed — SAFE
03/07/2025
Cycle 10 facade report submitted
02/21/2025
Cycle 10 facade inspection completed
02/07/2025
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00925287-I1
01/29/2025
Signed off — Alteration
Application filed for facade, roof and chimney repairs as per drawings filed herewith. No change to use, egress or occupancy as a part of this application.
M00866655-I1
01/29/2025
Signed off — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00925344-I1
01/27/2025
Special inspection requirement — Post-installed Anchors
Leo Lee
01/27/2025
Special inspection requirement — Chimneys and vents
Leo Lee
01/27/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Leo Lee
01/27/2025
Special inspection requirement — Final
Michael Notaro
01/27/2025
Special inspection requirement — Preliminary
Michael Notaro
01/27/2025
Special inspection requirement — Masonry
Leo Lee
01/21/2025
Filed — Alteration
Application filed for facade, roof and chimney repairs as per drawings filed herewith. No change to use, egress or occupancy as a part of this application.
M00866655-P1
10/23/2024
Filed — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00925344-P1
10/08/2024
Permit issued — Sidewalk Shed
M00925287-I1-SH
10/08/2024
Permit issued — Supported Scaffold
M00925344-I1-SF
10/08/2024
Permit issued — General Construction
M00866655-I1-GC
05/13/2024
Violation issued (ECB, closed)
Construction
05/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/28/2024
Permit issued — General Construction
M00866655-I1-GC
01/04/2024
Permit issued — Supported Scaffold
M00925344-I1-SF
01/03/2024
Filed — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00925344-I1
09/19/2023
Permit issued — Sidewalk Shed
M00925287-I1-SH
09/06/2023
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00925287-I1
05/15/2023
Filed — Alteration
Application filed for facade, roof and chimney repairs as per drawings filed herewith. No change to use, egress or occupancy as a part of this application.
M00866655-I1
06/07/2022
Special inspection requirement — Mechanical Systems
James Fahey
06/07/2022
Special inspection requirement — Final
James Fahey
05/18/2022
Signed off — Alteration
Filing for Plumbing work for the proposed deli cafe) AT 1ST FLOOR CORNER in conjunction with application # M00601411, NON-RESEIDNTIAL COOKING EQUIPMENTS AND SINKS WITH RELATED PIPING
M00601412-I1
05/11/2022
Signed off — Alteration
FILING FOR INTERIOR RENOVATION OF THE EXISTING CORNER COMMERCIAL STORE FOR CAFE ( USE GROUP 6 ) DELI FLOORING, CEILING , NON-BEARING PARTITIONS, CARPENTRY AND FINISHES, NO CHANGE IN USE EGRESS OR OCCUPANCY.
M00601411-I1
05/09/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/03/2022
Filed — Alteration
FILING FOR INTERIOR RENOVATION OF THE EXISTING CORNER COMMERCIAL STORE FOR CAFE ( USE GROUP 6 ) DELI FLOORING, CEILING , NON-BEARING PARTITIONS, CARPENTRY AND FINISHES, NO CHANGE IN USE EGRESS OR OCCUPANCY.
M00601411-P1
04/19/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/09/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/29/2022
Filed — Alteration
Filing for Plumbing work for the proposed deli cafe) AT 1ST FLOOR CORNER in conjunction with application # M00601411, NON-RESEIDNTIAL COOKING EQUIPMENTS AND SINKS WITH RELATED PIPING
M00601412-P1
03/22/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
AKM HOQUE
03/22/2022
Special inspection requirement — Mechanical Systems
AKM HOQUE
03/22/2022
Special inspection requirement — Final
IBRAHIM A ANSE
02/17/2022
Cycle 9 facade report submitted
01/12/2022
Cycle 9 facade report signed — SWARMP
01/11/2022
Cycle 9 facade inspection completed
11/12/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/12/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/19/2021
Permit issued — Plumbing
M00601412-I1-PL
10/15/2021
Permit issued — Mechanical Systems
M00601411-I1-GC-CX
10/12/2021
Filed — Alteration
Filing for Plumbing work for the proposed deli cafe) AT 1ST FLOOR CORNER in conjunction with application # M00601411, NON-RESEIDNTIAL COOKING EQUIPMENTS AND SINKS WITH RELATED PIPING
M00601412-I1
10/07/2021
Filed — Alteration
FILING FOR INTERIOR RENOVATION OF THE EXISTING CORNER COMMERCIAL STORE FOR CAFE ( USE GROUP 6 ) DELI FLOORING, CEILING , NON-BEARING PARTITIONS, CARPENTRY AND FINISHES, NO CHANGE IN USE EGRESS OR OCCUPANCY.
M00601411-I1
04/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/14/2020
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00103553-I1
12/11/2020
Signed off — Alteration
Modification to existing Verizon telecommunications site. Replace 3 antennas on roof. All in conformance with TPPN 5/98. No change in use, egress, or occupancy.
M00075060-I1
12/09/2019
Signed off — Alteration
M00097994-I1
09/26/2019
Permit issued — Construction Fence
M00103553-I1-FN
05/20/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 123 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BILLY ENTERPRISES1307/08/2026
KAUFMAN ORGANIZATION1307/08/2026
BRITEX ASSOCIATES3703/22/2026
KAUFMAN MANAGEMENT CO103/21/2026
KAUFMAN ADLER REALTY203/21/2026
KAUFMAN REALTY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE603/21/2026
SOMMA DESIGN CONSULTING403/21/2026
CONSTRUCTION PERMIT SERVICES403/21/2026
TASHEED BUILDING CONSULTANTS403/21/2026
HAIDER ENGINEERING, P.E.203/21/2026
HAIDER ENGINEERING P E203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NATIONAL RESTORATION.GROGeneral Contractor1207/08/2026
BILLY ENTERPRISES INCGeneral Contractor1107/08/2026
AL SAEED CONSTRUCTIONGeneral Contractor303/21/2026
U.S.A. GENERAL CONTRACTORElectrical203/21/2026
SOTO, ALEXISElectrical203/21/2026
SKARULIS, JOSEPHElectrical203/21/2026
PETER CAMPISIElectrical103/21/2026
STEVEN KRATCHMAN ARCHIT*Electrical103/21/2026
COMCELL CONSTRUCTION CORP.General Contractor107/08/2026
ABE HIMELFARBElectrical103/21/2026
CROSSFIELD PLBG.&HTGPlumbing107/08/2026
A.MIRANDA CONTRACTING CORElectrical103/21/2026
BAYER, JElectrical103/21/2026
CAMPISI PETERElectrical103/21/2026
FORD, GUYElectrical103/21/2026
GUY FORDElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STRUCTURAL CONSULTING SER1919211/07/2025
LEO Y LEE ASSOCIATES2481201/21/2025
ASHRAF CORPORATION1973205/03/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offNATIONAL RESTORATION.GRO10/08/2024
DOB NOWSupported ScaffoldSigned-offNATIONAL RESTORATION.GRO10/08/2024
DOB NOWGeneral ConstructionSigned-offNATIONAL RESTORATION.GRO10/08/2024
DOB NOWGeneral ConstructionSigned-offNATIONAL RESTORATION.GRO02/28/2024
DOB NOWSupported ScaffoldSigned-offNATIONAL RESTORATION.GRO01/04/2024
DOB NOWSidewalk ShedSigned-offNATIONAL RESTORATION.GRO09/19/2023
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG10/19/2021
DOB NOWMechanical SystemsSigned-offAL SAEED CONSTRUCTION10/15/2021
DOB NOWConstruction FenceSigned-offBILLY ENTERPRISES INC09/26/2019
DOB NOWSidewalk ShedSigned-offBILLY ENTERPRISES INC02/25/2019
DOB NOWConstruction FenceSigned-offBILLY ENTERPRISES INC01/11/2019
DOB NOWConstruction FenceSigned-offBILLY ENTERPRISES INC11/27/2018
DOB NOWSidewalk ShedSigned-offBILLY ENTERPRISES INC11/14/2018
DOB NOWAntennaSigned-offCOMCELL CONSTRUCTION CORP09/20/2018
BISOTISSUEDWKR CONSTRUCTION, INC04/16/2019
BISOTISSUEDGALCON ENTERPRISES INC12/01/2017
BISOTISSUEDJANBAR INC07/20/2017
BISOTISSUEDNATIONAL RESTORATION.GRO04/17/2017
BISOTISSUEDNATIONAL RESTORATION.GRO11/23/2016
BISEQISSUEDRENNON CONSTRUCTION CORP11/09/2016
BISOTISSUEDJANBAR INC10/31/2016
BISOTISSUEDCEL TECH ELECTRIC INC06/22/2016
BISOTISSUEDJANBAR INC11/04/2015
BISOTISSUEDJANBAR INC03/11/2015
BISOTISSUEDJANBAR INC08/13/2014
BISOTISSUEDTELCOM ENGINEERING GP INC08/08/2013
BISOTISSUEDAACHEN WINDOW CORP,11/13/2009
BISOTISSUEDA P A RESTORATION CORP04/01/2009
BISOTISSUEDBEST MAINTENANCE SERVICE INC06/20/2008
BISOTISSUEDAPA RESTORATION CORP05/29/2008
BISEQISSUEDROCKLEDGE SCAFFOLD CORP01/10/2008
BISOTISSUEDACC CONSTRUCTION CORP06/22/2006
BISOTISSUEDWONDER WORKS CONSTR CORP04/19/2006
BISEQRE-ISSUEDCOLGATE SCAFFOLDING EQUIP CORP06/29/2005
BISPLISSUEDL&J PLG & HTG CO OF NY IN06/22/2005
BISOTISSUEDTECH-NEL ELECTRIC, INC06/16/2005
BISOTISSUEDTECH-NEL ELECTRIC, INC05/26/2005
BISOTRE-ISSUEDAPA REST.04/13/2004
BISEQISSUEDSTEEL SCAFFOLDING09/25/2003
BISOTISSUEDAPA REST.09/17/2003
+ 16 more permits on file
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/09/2022Pass-Final General Construction Non-Directive 14PassView ↗
04/19/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/22/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/12/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/12/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
11/05/2025Fire-Resistant Penetrations and JointsJames Faheyspecial
01/27/2025Post-installed AnchorsLeo Leespecial
01/27/2025Chimneys and ventsLeo Leespecial
01/27/2025Structural Stability – Alterations of existing buildingsLeo Leespecial
01/27/2025FinalMichael Notaroprogress
01/27/2025PreliminaryMichael Notaroprogress
01/27/2025MasonryLeo Leespecial
06/07/2022Mechanical SystemsJames Faheyspecial
06/07/2022FinalJames Faheyprogress
03/22/2022Fire-Resistant Penetrations and JointsAKM HOQUEspecial
03/22/2022Mechanical SystemsAKM HOQUEspecial
03/22/2022FinalIBRAHIM A ANSEprogress
11/27/2018FinalBRIAN T. O'CONNORprogress
▾Documents — 197 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
09/06/2026M00075060-I1Request digital key ↗
09/06/2026M00097994-I1Request digital key ↗
09/06/2026M00103553-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits35
▸BISPLAN / WORK APPROVAL APPLICATION18
03/25/2019123850760Open ↗
02/27/2019123850760Open ↗
05/15/2018140752521Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION15
04/16/2019140752521Open ↗
12/03/2018140752521Open ↗
12/04/2017123170718Open ↗
Showing 3 of 15 on file for this type
▸BISAFTER-HOUR WORK PERMIT APPLICATION1
08/21/2014121540608Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
12/03/2018140752521Open ↗
▸Seals & Professional Certifications51
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION18
02/27/2019123850760Open ↗
11/02/2017123170718Open ↗
11/02/2017123170718Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/06/2026M00075060-I1Open ↗
09/06/2026M00097994-I1Open ↗
09/03/2026M00601412-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
02/27/2019123850760Open ↗
06/20/2017123101339Open ↗
11/16/2016122901388Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/27/2026M00601411-P1Open ↗
09/27/2026M00601411-P1Open ↗
08/24/2026M00752592-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
02/27/2019123850760Open ↗
06/20/2017123101339Open ↗
11/16/2016122901388Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/27/2026M00601411-P1Open ↗
08/23/2026M00866655-I1Open ↗
08/22/2026M00103553-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
10/21/2009120181711Open ↗
06/19/2008110206811Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
03/30/2018140752521Open ↗
08/16/2016140535749Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
02/27/2019123850760Open ↗
06/20/2017123101339Open ↗
▸Safety & Tenant Protection8
▸DOB NOWHPD-1: Anti-Harassment Area Checklist6
09/03/2026M00601412-P1Open ↗
09/03/2026M00601412-I1Open ↗
09/02/2026M00601411-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTenant Protection Plan and Notes2
11/02/2017123170718Open ↗
11/16/2016122901388Open ↗
▸Environmental & Asbestos21
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
02/27/2019123850760Open ↗
03/30/2018140752521Open ↗
11/02/2017123170718Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/06/2026M00075060-I1Open ↗
09/03/2026M00601412-P1Open ↗
09/03/2026M00601412-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
11/02/2009120179421Open ↗
11/02/2009120179421Open ↗
06/19/2008110206811Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
10/21/2009120181711Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
12/01/2016140535749Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/25/2026M00866655-I1Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
02/27/2019123850760Open ↗
11/02/2017123170718Open ↗
05/17/2017122794636Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
05/15/2018140752521Open ↗
05/15/2018140752521Open ↗
08/16/2016140535749Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
05/17/2017122794636Open ↗
10/10/2013121695077Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
05/15/2018140752521Open ↗
03/30/2018140752521Open ↗
08/16/2016140535749Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs12
▸BISADMINISTRATIVE OBJECTIONS6
07/12/2013121695077Open ↗
02/27/2013121540608Open ↗
11/02/2009120179421Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
08/22/2017122901388Open ↗
05/17/2017122794636Open ↗
10/10/2013121695077Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP Variance (V5) letter1
08/13/2026M00866655-I1Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT14
02/27/2019123850760Open ↗
04/12/2018123391793Open ↗
03/30/2018140752521Open ↗
Showing 3 of 14 on file for this type
▸Filing & Intake Forms18
▸BISEFILING COVER SHEET10
02/27/2019123850760Open ↗
04/12/2018123391793Open ↗
11/02/2017123170718Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION3
05/15/2018140752521Open ↗
12/08/2016122794636Open ↗
06/25/2015121540608Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
03/30/2018140752521Open ↗
08/16/2016140535749Open ↗
06/19/2008110206811Open ↗
▸BISBOROUGH INTAKE FORM2
03/25/2019123850760Open ↗
08/22/2017122901388Open ↗
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
07/31/2017122901388Open ↗
07/02/2010120181711Open ↗
▸DOB NOWProof of Historic Building2
08/13/2026M00866655-I1Open ↗
08/13/2026M00866655-P1Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026M00097994-I1Open ↗