← Back
Cemetery
600 WEST 155 STREET
MANHATTAN · Hamilton Heights-Sugar Hill · BIN 1810513
💬 Discuss this project
1980Year Built
1Stories
Z8Building Class
R8Zoning
12,600 sfGross Floor Area
1Units
0 Open Violations
Cemetery · Owner of record: TRINITY CHURCH CORP · 410,018 sf lot · 0.03 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingGeneral
Filed — no permit issued38p · 4 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRINITY WALL STREET403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MURPHY BURNHAM & BUTTRICK ARCHITECT207/13/2021
DERIVE ENGINEERS207/13/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV ARCHITECT803/21/2026
Building Lifecycle
All (27)Filed (4)Objection (10)Special Inspection (13)
07/27/2021
Objection raised — Other
07/27/2021
Objection resolved — Addressed
07/13/2021
Filed — Alteration
Installation of electric domestic hot water heater and sump pump with associated pipings.
M00555129-I1
07/13/2021
Filed — Alteration
M00554535-I1
07/13/2021
Filed — Alteration
THE PROJECT CONSISTS OF MECHANICAL WORK IN CONJUNCTION WITH THE RENOVATION OF A MAUSOLEUM. INSTALLATION OF VARIABLE REFRIGERANT FLOW SYSTEMS. INSTALLATION OF TOILET EXHAUST SYSTEMS AS DESIGNED.
M00554828-I1
07/13/2021
Special inspection requirement — Maintenance information
07/09/2021
Special inspection requirement — Energy Code Compliance Inspections
07/09/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
07/09/2021
Special inspection requirement — Shutoff dampers
07/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/09/2021
Special inspection requirement — Heating Systems
07/09/2021
Special inspection requirement — Mechanical Systems
07/09/2021
Special inspection requirement — Final
07/09/2021
Special inspection requirement — HVAC-R and service water heating system controls
07/09/2021
Special inspection requirement — HVAC-R and service water heating equipment
06/30/2021
Objection raised — Fire_Protection
06/30/2021
Objection resolved — Addressed
06/30/2021
Objection raised — Other
06/30/2021
Objection resolved — Addressed
06/30/2021
Objection raised — Other
06/30/2021
Objection resolved — Addressed
06/30/2021
Objection raised — Fire_Protection
06/30/2021
Objection resolved — Addressed
06/22/2021
Filed — Alteration CO
Proposed change of use from crematory to mausoleum, in an existing cemetery. All as per plans filed herewith.
M00515193-I1
06/02/2021
Special inspection requirement — Sprayed fire-resistant materials
05/04/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BIS—ISSUEDMULLEN CONSTRUCTION CO IN02/11/1998
1 project · most recent 07/13/2021
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/13/2021——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Lg ARNU363NJA4 990 CFM · Vrf Indoor ×1
ARNU763B8A4 2,260 CFM · Vrf Indoor ×1
ARUM121BTE5 135,000 BTU · Vrf Outdoor ×1
Heating
Lg ARNU363NJA4 40,000 BTU · Vrf Indoor ×1
ARNU763B8A4 86,000 BTU · Vrf Indoor ×1
Ventilation
Greenheck SQ-99-VG 400 CFM · Exhaust Fan ×1
1 project · most recent 07/13/2021
Water/Sanitary
FiledStatusContractorScope
07/13/2021——Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
07/13/2021Maintenance information—energy_progress
07/09/2021Energy Code Compliance Inspections—progress
07/09/2021HVAC-R and service water piping design and insulation—energy_progress
07/09/2021Shutoff dampers—energy_progress
07/09/2021Fire-Resistant Penetrations and Joints—special
07/09/2021Fire-Resistant Penetrations and Joints—special
07/09/2021Heating Systems—special
07/09/2021Mechanical Systems—special
07/09/2021Final—progress
07/09/2021HVAC-R and service water heating system controls—energy_progress
07/09/2021HVAC-R and service water heating equipment—energy_progress
06/02/2021Sprayed fire-resistant materials—special
05/04/2021Fire-Resistant Penetrations and Joints—special
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/03/2026M00555129-I1Request digital key ↗
09/03/2026M00554828-I1Request digital key ↗
09/03/2026M00554535-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/03/2026M00554535-I1Open ↗
08/13/2026M00515193-I1Open ↗
08/13/2026M00554828-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026M00515193-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
09/03/2026M00554535-I1Open ↗
08/13/2026M00555129-I1Open ↗
08/13/2026M00554828-I1Open ↗
Showing 3 of 4 on file for this type