← Back
BuildNYC
Multi-story retail building (2+)
6001 11TH AVENUE
BROOKLYN · Borough Park · BIN 3141233
💬 Discuss this project
1931Year Built
2Stories
K2Building Class
M1-1Zoning
9,400 sfGross Floor Area
2Units
6 Active Violations 8 old, status unconfirmed ▸FDNY Report ↗
Multi-story retail building (2+) · Owner of record: 6015 Realty · 6,000 sf lot · 1.57 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofAsia Entertainment NY Group6p · 3 filings · 20 docs
Floor 2Asia Entertainment NY Group6p · 2 filings · 14 docs
Floor 1Asia Entertainment NY Group12p · 6 filings · 20 docs
CellarAsia Entertainment NY Group10p · 4 filings · 20 docs
Site & exteriorAsia Entertainment NY Group4p · 3 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Asia Entertainment NY Group1003/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Chun Feng, Architect907/02/2026
J&R Design and Inspection210/19/2022
CL Engineering101/13/2021
Alberto Roman108/31/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Highquality Construction VNW603/21/2026
High Quality 3381603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
High Quality ConstructionGeneral Contractor607/08/2026
City SignsSign hanger307/08/2026
American Standard P&H CororpPlumbing207/08/2026
So Plumbing & HeatingPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM Engineering6244812/03/2025
CL Engineering6781110/19/2022
J&R Design and Inspection6637201/14/2021
AR-Tech Engineering6659108/31/2020
Building Lifecycle
All (104)Filed (13)Permit Issued (11)Signed Off (6)Violation (41)Inspection (3)Special Inspection (30)
07/02/2026
Filed — No Work
B01425899-I1
07/02/2026
Special inspection requirement — Public Assembly Emergency Lighting
Chun Feng
12/03/2025
Filed — Alteration
INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACES ON 1ST FLOOR & CELLAR WITH PARTITIONING, CEILING AND FLOOR TILES WORK. EXTEND RANGEHOOD IN THE EXISTING COMMERCIAL KITCHEN ON 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01231742-P1
12/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
NARESH MAHANGU
12/03/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
12/03/2025
Special inspection requirement — Final
Chun Feng
12/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
NARESH MAHANGU
12/03/2025
Special inspection requirement — Insulation placement and R values
NARESH MAHANGU
12/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
NARESH MAHANGU
12/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
NARESH MAHANGU
12/03/2025
Special inspection requirement — Mechanical Systems
NARESH MAHANGU
12/03/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
12/03/2025
Special inspection requirement — Final
Chun Feng
12/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
NARESH MAHANGU
12/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
NARESH MAHANGU
12/03/2025
Special inspection requirement — Insulation placement and R values
NARESH MAHANGU
12/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
NARESH MAHANGU
12/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
NARESH MAHANGU
12/03/2025
Special inspection requirement — Mechanical Systems
NARESH MAHANGU
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
08/25/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
08/22/2025
Filed — Alteration
FILE PLUMBING WORK TO MODIFY GAS AND PLUMBING APPLIANCES FOR THE EXISTING COMMERCIAL KITCHEN AND SPACE IN CONJUNCTION WITH GC JOB#B01231742. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01237568-P2
08/21/2025
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
08/21/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
08/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
08/13/2025
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
08/12/2025
Signed off — Alteration
INSTALLATION OF A SIGN FOR THE 1ST FLOOR COMMERCIAL SPACE FACING 11TH AVENUE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01261103-S1
08/12/2025
Signed off — Alteration
INSTALLATION OF A SIGN FOR THE 1ST FLOOR COMMERCIAL SPACE FACING 60TH STREET AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01261303-I1
08/12/2025
Signed off — Alteration
INSTALLATION OF A SIGN FOR THE 1ST FLOOR COMMERCIAL SPACE FACING 11TH AVENUE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01261103-I1
08/01/2025
Filed — Alteration
FILE PLUMBING WORK TO MODIFY GAS AND PLUMBING APPLIANCES FOR THE EXISTING COMMERCIAL KITCHEN AND SPACE IN CONJUNCTION WITH GC JOB#B01231742. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01237568-P1
08/01/2025
Permit issued — Sign
B01261103-I1-SG
07/31/2025
Permit issued — Sign
B01261303-I1-SG
07/30/2025
Permit issued — Sign
B01261103-S1-SG
07/25/2025
Filed — Alteration
INSTALLATION OF A SIGN FOR THE 1ST FLOOR COMMERCIAL SPACE FACING 11TH AVENUE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01261103-S1
07/25/2025
Filed — Alteration
INSTALLATION OF A SIGN FOR THE 1ST FLOOR COMMERCIAL SPACE FACING 60TH STREET AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01261303-I1
07/25/2025
Filed — Alteration
INSTALLATION OF A SIGN FOR THE 1ST FLOOR COMMERCIAL SPACE FACING 11TH AVENUE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01261103-I1
07/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
07/24/2025
Special inspection requirement — Final
Chun Feng
07/08/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
07/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
06/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/11/2025
Permit issued — Plumbing
B01237568-I1-PL
06/09/2025
Filed — Alteration
FILE PLUMBING WORK TO MODIFY GAS AND PLUMBING APPLIANCES FOR THE EXISTING COMMERCIAL KITCHEN AND SPACE IN CONJUNCTION WITH GC JOB#B01231742. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01237568-I1
06/03/2025
Permit issued — Mechanical Systems
B01231742-I1-GC
06/03/2025
Permit issued — Mechanical Systems
B01231742-I1-MS
05/30/2025
Filed — Alteration
INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACES ON 1ST FLOOR & CELLAR WITH PARTITIONING, CEILING AND FLOOR TILES WORK. EXTEND RANGEHOOD IN THE EXISTING COMMERCIAL KITCHEN ON 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01231742-I1
05/28/2025
Violation issued (ECB, open)
Boilers
05/28/2025
Violation issued (ECB, open)
Boilers
12/18/2024
Violation issued (FDNY_NOV, closed)
10/31/2024
Violation issued (FDNY_ORDER, closed)
10/31/2024
Violation issued (FDNY_ORDER, closed)
10/31/2024
Violation issued (FDNY_ORDER, closed)
10/31/2024
Violation issued (FDNY_ORDER, closed)
10/11/2024
Violation issued (FDNY_ORDER, closed)
10/11/2024
Violation issued (FDNY_ORDER, closed)
10/11/2024
Violation issued (FDNY_NOV, closed)
10/11/2024
Violation issued (FDNY_NOV, closed)
10/11/2024
Violation issued (FDNY_ORDER, closed)
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offElmer Dawson08/01/2025
DOB NOWSignSigned-offElmer Dawson07/31/2025
DOB NOWSignSigned-offElmer Dawson07/30/2025
DOB NOWPlumbingPermit IssuedAmerican Standard P&H Cororp06/11/2025
DOB NOWMechanical SystemsPermit IssuedHigh Quality Construction06/03/2025
DOB NOWMechanical SystemsPermit IssuedHigh Quality Construction06/03/2025
DOB NOWGeneral ConstructionSigned-offHigh Quality Construction11/03/2022
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp11/29/2021
DOB NOWGeneral ConstructionSigned-offHigh Quality Construction01/26/2021
DOB NOWPlumbingSigned-offNicholas Suida01/15/2021
DOB NOWPlumbingSigned-offNicholas Suida09/02/2020
BISOTISSUEDHigh Quality Construction09/03/2020
1 project · most recent 12/03/2025
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/03/2025Permit IssuedHigh Quality ConstructionAir Conditioning Systems, Ventilation Systems
Cooling
Gree LIV36HP230V1R32AO 34,000 BTU · Heat Pump Outdoor ×6
1 project · most recent 08/22/2025
Gas Water/Sanitary
FiledStatusContractorScope
08/22/2025Permit IssuedAmerican Standard P&HGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/21/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
08/13/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
06/23/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
07/02/2026Public Assembly Emergency LightingChun Fengprogress
12/03/2025Fire-Resistance Rated ConstructionNARESH MAHANGUprogress
12/03/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
12/03/2025FinalChun Fengprogress
12/03/2025HVAC-R and service water heating system controlsNARESH MAHANGUenergy_progress
12/03/2025Insulation placement and R valuesNARESH MAHANGUenergy_progress
12/03/2025HVAC-R and service water piping design and insulationNARESH MAHANGUenergy_progress
12/03/2025HVAC-R and service water heating equipmentNARESH MAHANGUenergy_progress
12/03/2025Mechanical SystemsNARESH MAHANGUspecial
12/03/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
12/03/2025FinalChun Fengprogress
12/03/2025Fire-Resistance Rated ConstructionNARESH MAHANGUprogress
12/03/2025HVAC-R and service water heating system controlsNARESH MAHANGUenergy_progress
12/03/2025Insulation placement and R valuesNARESH MAHANGUenergy_progress
12/03/2025HVAC-R and service water heating equipmentNARESH MAHANGUenergy_progress
12/03/2025HVAC-R and service water piping design and insulationNARESH MAHANGUenergy_progress
12/03/2025Mechanical SystemsNARESH MAHANGUspecial
08/25/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
08/25/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
08/21/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
08/21/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
07/25/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
07/24/2025FinalChun Fengprogress
07/08/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
07/08/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
Latest 25 of 31.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Asia Entertainment NY GroupArts / Culture / EntertainmentCellar, Floors 1, 2
Project B00439986 Alteration · LOC Issued · 01/14/2021
Project B00450781 Alteration · LOC Issued · 01/13/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 83 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch8
08/21/2026B01261303-I1Request digital key ↗
08/21/2026B01261103-I1Request digital key ↗
08/21/2026B01261103-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/02/2026B00391948-I1Request digital key ↗
09/01/2026B00439986-I1Request digital key ↗
09/01/2026B00439986-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/16/2026B01425899-I1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION4
12/29/2020340780202Open ↗
12/23/2020340780202Open ↗
10/28/2020340780202Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION1
09/03/2020340760830Open ↗
▸Seals & Professional Certifications40
▸DOB NOWProgress Inspector Seal & Signature16
09/18/2026B01237568-P2Open ↗
09/01/2026B01231742-I1Open ↗
09/01/2026B01231742-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/01/2026B00439986-I1Open ↗
09/01/2026B00439986-P1Open ↗
08/21/2026B01261303-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/18/2026B01237568-P2Open ↗
09/01/2026B01231742-I1Open ↗
09/01/2026B01237568-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
10/28/2020340780202Open ↗
08/28/2020340760830Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/28/2020340760830Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/28/2020340760830Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/28/2020340780202Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
10/28/2020340780202Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/01/2026B00439986-I1Open ↗
09/01/2026B00439986-P1Open ↗
08/20/2026B01237568-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/28/2020340780202Open ↗
08/28/2020340760830Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
10/28/2020340780202Open ↗
08/28/2020340760830Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
10/28/2020340780202Open ↗
09/03/2020340760830Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00439986-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
10/28/2020340780202Open ↗
09/03/2020340760830Open ↗
▸Approvals, Objections & Sign-offs3
▸BISSCHEDULE A - OCCUPANCY / USE3
12/29/2020340780202Open ↗
12/23/2020340780202Open ↗
10/28/2020340780202Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
10/28/2020340780202Open ↗
08/28/2020340760830Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET2
10/28/2020340780202Open ↗
08/28/2020340760830Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
10/28/2020340780202Open ↗