← Back
Elevator apt, fireproof with stores
601 AMSTERDAM AVENUE
MANHATTAN · BIN 1085485
💬 Discuss this project
1997Year Built
18Stories
D6Building Class
C2-8Zoning
237,045 sfGross Floor Area
271Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: SWARMP
Elevator apt, fireproof with stores · Owner of record: LPF SAGAMORE, INC. · 21,620 sf lot · 10.96 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 3 filings · 8 docs
Floor 1Under Construction14p · 5 filings · 20 docs
Cellar3p · 1 filing · 9 docs
2 jobs · most recent 06/25/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/25/2025Permit IssuedDONNELLY MECHANICAL CORPAir Conditioning Systems
Cooling
Sigma SDSH060D2 60,000 BTU · Condensing Unit ×2
09/14/2023Permit IssuedDONNELLY MECHANICAL CORPAir Conditioning Systems
Cooling
Fujitsu FH48 1,600 CFM · Fan Coil Indoor ×1
FO4814 48,000 BTU · Condensing Unit ×1
4 jobs · most recent 09/18/2026
General Wiring
FiledStatusContractorScope
09/18/2026Permit IssuedNEE ELECTRICAL, LLC—
07/29/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
06/05/2024CompleteKINGS ELECTRIC CO., INC.General Wiring
12/12/2018Complete5 J'S ELECTL CONTS CORPGeneral Wiring
1 job · most recent 07/30/2026
FiledStatusContractorScope
07/30/2026Permit IssuedAKM CONSTRUCTION NY CORP1 scope_items
1 job · most recent 07/30/2026
Sidewalk Shed
FiledStatusContractorScope
07/30/2026Permit IssuedAKM CONSTRUCTION NY CORPSidewalk Shed
1 job · most recent 08/11/2026
FiledStatusContractorScope
08/11/2026Permit IssuedSTRUCTUAL PRESV SYSTEM—
Building Lifecycle
All (157)Filed (17)Permit Issued (15)Signed Off (8)Facade (FISP) (21)Violation (60)Inspection (6)Special Inspection (30)
08/19/2026
Permit issued — Suspended Scaffold
M01432640-I1-SC
08/11/2026
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
M01432640-I1
07/31/2026
Permit issued — Sidewalk Shed
M01438603-I1-SH
07/30/2026
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING FACADE REPAIRS FILED UNDER APPLICATION # M01401409, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01438603-I1
07/29/2026
Permit issued — General Construction
M01401409-I1-GC
06/22/2026
Permit issued — Suspended Scaffold
M01410890-I1-SC
06/09/2026
Filed — Alteration
Suspended Scaffolding for Facade Restoration & Inspection as Shown on Plans
M01410890-I1
06/04/2026
Special inspection requirement — Post-installed Anchors
Michael Walsh
06/04/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Walsh
05/20/2026
Filed — Alteration
FACADE REPAIRS AS PER DRAWINGS . THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01401409-I1
05/20/2026
Special inspection requirement — Concrete - Cast-In-Place
Jennifer Sze
05/20/2026
Special inspection requirement — Masonry
Jennifer Sze
05/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
Jennifer Sze
05/13/2026
Special inspection requirement — Final
Jennifer Sze
01/21/2026
Signed off — Alteration
EXISTING COMMERCIAL SPACE, PLUMBING SYSTEM IN CONJUNCTION WITH JOB #M01275456, OBTAIN PLUMBING PERMIT FOR THE INSTALL PLUMBING FIXTURES WORKS AND ONE ELECTRIC HOT WATER HEATER AT THE FIRST FLOOR.
M01275456-I1
01/20/2026
Signed off — Alteration
EXISTING COMMERCIAL SPACE, PLUMBING SYSTEM IN CONJUNCTION WITH JOB #M01275456, OBTAIN PLUMBING PERMIT FOR THE INSTALL PLUMBING FIXTURES WORKS AND ONE ELECTRIC HOT WATER HEATER AT THE FIRST FLOOR.
M01275456-S2
01/20/2026
Signed off — Alteration
EXISTING COMMERCIAL SPACE, PLUMBING SYSTEM IN CONJUNCTION WITH JOB #M01275456, OBTAIN PLUMBING PERMIT FOR THE INSTALL PLUMBING FIXTURES WORKS AND ONE ELECTRIC HOT WATER HEATER AT THE FIRST FLOOR.
M01275456-S1
12/30/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/26/2025
Violation issued (HPD, closed)
A
11/17/2025
Violation issued (HPD, closed)
I
10/28/2025
Permit issued — Mechanical Systems
M01275456-S2-MS
10/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/22/2025
Permit issued — General Construction
M01275456-I1-GC
09/18/2025
Filed — Alteration
EXISTING COMMERCIAL SPACE, PLUMBING SYSTEM IN CONJUNCTION WITH JOB #M01275456, OBTAIN PLUMBING PERMIT FOR THE INSTALL PLUMBING FIXTURES WORKS AND ONE ELECTRIC HOT WATER HEATER AT THE FIRST FLOOR.
M01275456-S2
09/18/2025
Permit issued — Plumbing
M01275456-S1-PL
09/10/2025
Filed — Alteration
EXISTING COMMERCIAL SPACE, PLUMBING SYSTEM IN CONJUNCTION WITH JOB #M01275456, OBTAIN PLUMBING PERMIT FOR THE INSTALL PLUMBING FIXTURES WORKS AND ONE ELECTRIC HOT WATER HEATER AT THE FIRST FLOOR.
M01275456-S1
09/05/2025
Filed — Alteration
EXISTING COMMERCIAL SPACE, PLUMBING SYSTEM IN CONJUNCTION WITH JOB #M01275456, OBTAIN PLUMBING PERMIT FOR THE INSTALL PLUMBING FIXTURES WORKS AND ONE ELECTRIC HOT WATER HEATER AT THE FIRST FLOOR.
M01275456-I1
09/01/2025
Special inspection requirement — Mechanical Systems
KY FU
09/01/2025
Special inspection requirement — Energy Code Compliance Inspections
KY FU
09/01/2025
Special inspection requirement — Final
KY FU
09/01/2025
Special inspection requirement — Shutoff dampers
KY FU
09/01/2025
Special inspection requirement — HVAC-R and service water heating equipment
KY FU
09/01/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
KY FU
09/01/2025
Special inspection requirement — HVAC-R and service water heating system controls
KY FU
09/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
KY FU
08/27/2025
Special inspection requirement — Lighting controls
KY FU
08/27/2025
Special inspection requirement — Interior lighting power
KY FU
08/27/2025
Special inspection requirement — Energy Code Compliance Inspections
KY FU
08/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
08/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
KY FU
08/21/2025
Special inspection requirement — Final
KY FU
08/12/2025
Signed off — Alteration
Replace existing Heating and air conditioning system. No change in use, egress, or occupancy.
M01041572-I1
08/08/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/02/2025
Permit issued — Mechanical Systems
M01237789-I1-MS
06/25/2025
Filed — Alteration
Replacement of air conditioning unit for the Lobby area. No change in use egress and occupancy.
M01237789-I1
06/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
Obaid Mian
06/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Obaid Mian
06/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
Obaid Mian
06/25/2025
Special inspection requirement — Maintenance information
Obaid Mian
06/20/2025
Special inspection requirement — Interior lighting power
TREVOR O. FLOWERS
06/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TREVOR O. FLOWERS
06/06/2025
Special inspection requirement — Mechanical Systems
Obaid Mian
06/06/2025
Special inspection requirement — Final
Obaid Mian
06/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
Obaid Mian
06/04/2025
Violation issued (HPD, closed)
A
06/02/2025
Filed — Alteration
Replace existing Heating and air conditioning system. No change in use, egress, or occupancy.
M01041572-P1
04/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TREVOR O. FLOWERS
04/07/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/01/2025
Signed off — Alteration
M00727211-I1
03/18/2025
Signed off — Alteration
Replace existing Heating and air conditioning system. No change in use, egress, or occupancy.
M01041572-S1
Latest 60 of 157 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AS AGENT FOR OWNER509/13/2026
SAGAMORE807/08/2026
RELATED MANAGEMENT203/22/2026
PARAMOUNT PLUMBING CO.103/22/2026
LPF SAGANORE INC.103/22/2026
RELATED COMPANIES503/21/2026
C O RELATED MANAGEMENT L P303/21/2026
BOZZUTO MANAGEMENT COMPANY103/21/2026
LA SALLE INVESTMENT MANAGEMENT203/21/2026
KBF RELATED PARTNERS603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOEL PHAGOO P.E. PLLC107/30/2026
SOCOTEC, INC.105/20/2026
FLUSHING ENGINEERING SERVICE PC309/18/2025
NEWTEC ENGINEERING206/25/2025
ECOPLUSDESIGN306/02/2025
SANFORD BERGER208/07/2024
WJY ELECTRIC INC.105/29/2024
RAND ENGINEERING & ARCHITECTURE DPC107/15/2022
PIRO STUDIO LLC102/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.403/21/2026
DI DIO ARCHITECTURE, PC203/21/2026
SCO ENGINEERING PLLC103/21/2026
JULIAN A. GOMEZ203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
US LEVIN GRP CORPGeneral Contractor407/08/2026
ZHONGSHUN JIANZHU INCGeneral Contractor404/09/2026
DONNELLY MECHANICAL CORPGeneral Contractor207/08/2026
TWO-TONE CONTRACTING CORP.General Contractor203/21/2026
BP MECHANICAL CORPGeneral Contractor107/08/2026
LAWRENCE EXTERIOR RESTORATIONGeneral Contractor107/30/2026
SHANNON CONTRACTING LLCGeneral Contractor103/21/2026
LG ELITE PLUMBING INCPlumbing107/08/2026
5 J'S ELECTL CONTS CORPElectrical103/22/2026
SMART PLBG & HTG CORPPlumbing107/08/2026
PERRY, BENJAMINElectrical103/21/2026
SCHUMAN, SElectrical103/21/2026
AKM CONSTRUCTION NY CORPGeneral Contractor108/01/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PCS ENGINEERING3745106/09/2026
SOCOTEC, INC.301105/20/2026
FLUSHING ENGINEERING SERV4373309/18/2025
OBAID MIAN849206/25/2025
MCHENERY TESTING LAB9181306/02/2025
FENAGH, INC6942208/07/2024
ECOPLUSDESIGN2887105/21/2024
RAND ENGINEERING & ARCHIT266107/15/2022
PIRO STUDIO LLC7503102/08/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTUAL PRESV SYSTEM08/19/2026
DOB NOWSidewalk ShedPermit IssuedAKM CONSTRUCTION NY CORP07/31/2026
DOB NOWGeneral ConstructionPermit IssuedLAWRENCE EXTERIOR RESTORATION07/29/2026
DOB NOWSuspended ScaffoldPermit IssuedLAWRENCE EXTERIOR REST CO06/22/2026
DOB NOWMechanical SystemsSigned-offZHONGSHUN JIANZHU INC10/28/2025
DOB NOWGeneral ConstructionSigned-offZHONGSHUN JIANZHU INC09/22/2025
DOB NOWPlumbingSigned-offLG ELITE PLUMBING INC09/18/2025
DOB NOWMechanical SystemsPermit IssuedDONNELLY MECHANICAL CORP07/02/2025
DOB NOWGeneral ConstructionSigned-offUS LEVIN GRP CORP06/12/2024
DOB NOWMechanical SystemsSigned-offUS LEVIN GRP CORP06/12/2024
DOB NOWPlumbingSigned-offSMART PLBG & HTG CORP06/06/2024
DOB NOWGeneral ConstructionPermit IssuedSHANNON CONTRACTING LLC05/24/2024
DOB NOWMechanical SystemsPermit IssuedDONNELLY MECHANICAL CORP09/21/2023
DOB NOWGeneral ConstructionSigned-offTWO-TONE CONTRACTING CORP09/27/2022
DOB NOWMechanical SystemsSigned-offBP MECHANICAL CORP03/01/2022
BISOTISSUEDKAY WATERPROOFING CORP02/05/2018
BISOTISSUEDKAY WATERPROOFING CORP09/08/2017
BISOTISSUEDKAY WATERPROOFING CORP10/14/2016
BISEQISSUEDSPRING SCAFFOLDING LLC08/29/2016
BISOTISSUEDKAY WATERPROOFING CORP02/01/2016
BISOTISSUEDKAY WATERPROOFING CORP12/07/2015
BISOTISSUEDKAY WATERPROOFING CORP10/01/2015
BISEQISSUEDSPRING SCAFFOLDING LLC08/25/2015
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.07/01/2015
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.07/01/2014
BISEQISSUEDCS BRIDGE CORP05/13/2011
BISEQISSUEDCS BRIDGE CORP02/02/2011
BISMHISSUEDDAVID DESIGN BUILDER CORP12/31/2009
BISSPISSUEDPETER PLUMBING ASSOC. INC.06/22/2009
BISEQISSUEDROCKLEDGE SCAFFOLD CORP04/09/2007
BISOTISSUEDJDA CONSTRUCTION04/06/2007
BISOTISSUEDJDA CONSTRUCTION11/16/2006
BISEQISSUEDROCKLEDGE SCAFFOLD CORP09/14/2006
BIS—ISSUEDSERVICE SIGN ERECTORS03/17/1999
BIS—ISSUEDSVC. SIGN ERECTORS02/04/1999
BIS—ISSUEDSC. SIGN ERECTORS02/04/1999
BIS—ISSUEDSVC. SIGN EREECTORS, INC01/26/1999
BIS—ISSUEDSVC. SIGN EREECTORS, INC01/26/1999
BIS—ISSUEDSVC. SIGN EREECTORS, INC01/26/1999
BIS—ISSUEDSVC. SIGN EREECTORS, INC01/26/1999
+ 21 more permits on file
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/08/2025Pass-Final General Construction Non-Directive 14PassView ↗
04/07/2025Fail-Final General Construction Non-Directive 14FailView ↗
01/14/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
06/04/2026Post-installed AnchorsMichael Walshspecial
06/04/2026Alternative Materials - OTCR Buildings Bulletin NumberMichael Walshspecial
05/20/2026Concrete - Cast-In-PlaceJennifer Szespecial
05/20/2026MasonryJennifer Szespecial
05/13/2026Tenant Protection Plan ComplianceJennifer Szespecial
05/13/2026FinalJennifer Szeprogress
09/01/2025Mechanical SystemsKY FUspecial
09/01/2025Energy Code Compliance InspectionsKY FUprogress
09/01/2025FinalKY FUprogress
09/01/2025Shutoff dampersKY FUenergy_progress
09/01/2025HVAC-R and service water heating equipmentKY FUenergy_progress
09/01/2025HVAC-R and service water piping design and insulationKY FUenergy_progress
09/01/2025HVAC-R and service water heating system controlsKY FUenergy_progress
09/01/2025Tenant Protection Plan ComplianceKY FUspecial
08/27/2025Lighting controlsKY FUenergy_progress
08/27/2025Interior lighting powerKY FUenergy_progress
08/27/2025Energy Code Compliance InspectionsKY FUprogress
08/27/2025Fire-Resistant Penetrations and JointsKY FUspecial
08/27/2025Tenant Protection Plan ComplianceKY FUspecial
08/21/2025FinalKY FUprogress
06/25/2025HVAC-R and service water heating system controlsObaid Mianenergy_progress
06/25/2025HVAC-R and service water piping design and insulationObaid Mianenergy_progress
06/25/2025HVAC-R and service water heating equipmentObaid Mianenergy_progress
06/25/2025Maintenance informationObaid Mianenergy_progress
06/20/2025Interior lighting powerTREVOR O. FLOWERSenergy_progress
Latest 25 of 54.
▾Documents — 197 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
09/02/2026M00675613-I1Request digital key ↗
09/02/2026M00727211-I1Request digital key ↗
08/29/2026M00910744-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits32
▸BISWORK PERMIT APPLICATION16
02/07/2018123122361Open ↗
09/11/2017123122361Open ↗
10/19/2016122342036Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION15
04/16/2019123122361Open ↗
04/01/2019123122361Open ↗
09/01/2017123122361Open ↗
Showing 3 of 15 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
12/09/2016140394348Open ↗
▸Seals & Professional Certifications89
▸DOB NOWProgress Inspector Seal & Signature31
09/23/2026M01237789-I1Open ↗
09/23/2026M01237789-I1Open ↗
09/23/2026M01237789-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/23/2026M01237789-I1Open ↗
09/23/2026M01237789-I1Open ↗
09/01/2026M00910744-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/02/2026M00727211-I1Open ↗
08/27/2026M01041572-P1Open ↗
08/27/2026M01041572-S2Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
06/14/2019123122361Open ↗
09/01/2017123122361Open ↗
05/24/2017122342036Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
09/01/2017123122361Open ↗
09/22/2015140405121Open ↗
08/24/2015140394348Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
02/03/2011120593795Open ↗
06/05/2009120055420Open ↗
06/05/2009120055420Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
09/01/2017123122361Open ↗
07/10/2014122037367Open ↗
02/03/2011120593795Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
09/22/2015140405121Open ↗
08/24/2015140394348Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/22/2015140405121Open ↗
08/24/2015140394348Open ↗
▸Trade Schedules & Equipment6
▸BISEQUIPMENT USE PERMITS2
08/28/2010120055420Open ↗
08/26/2010120055420Open ↗
▸BISSCHEDULE B - PLUMBING1
06/05/2009120055420Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
10/12/2010120055420Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
07/20/2009120055420Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
08/28/2010120055420Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
09/01/2017123122361Open ↗
▸Environmental & Asbestos5
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
07/10/2014122037367Open ↗
02/03/2011120593795Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/02/2026M00727211-I1Open ↗
08/13/2026M01237789-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/21/2015122342036Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
09/01/2017123122361Open ↗
04/21/2015122342036Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
06/14/2019123122361Open ↗
05/24/2017122342036Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/24/2015140394348Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00675613-I1Open ↗
▸Approvals, Objections & Sign-offs12
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
06/14/2019123122361Open ↗
05/24/2017122342036Open ↗
12/09/2016140394348Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/04/2016122342036Open ↗
01/04/2016122342036Open ↗
▸BISSUPERSEDING LETTER2
10/19/2016122342036Open ↗
01/04/2016122342036Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
02/03/2011120593795Open ↗
06/05/2009120055420Open ↗
▸BISSHED LETTER1
09/21/2016140394348Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
06/14/2019123122361Open ↗
06/14/2019123122361Open ↗
04/01/2019123122361Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms16
▸BISEFILING COVER SHEET6
09/01/2017123122361Open ↗
04/21/2015122342036Open ↗
07/10/2014122037367Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION5
04/16/2019123122361Open ↗
02/17/2017122342036Open ↗
03/28/2016140394348Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
09/22/2015140405121Open ↗
08/24/2015140394348Open ↗
06/05/2009120055420Open ↗
▸BISBOROUGH INTAKE FORM2
06/14/2019123122361Open ↗
04/01/2019123122361Open ↗
▸Other Documents4
▸BISTENANT/OCCUPANT PROTECTION PLAN 2008 CODE1
08/24/2015140394348Open ↗
▸DOB NOWIRA Certification1
08/16/2026M01432640-I1Open ↗
▸DOB NOWCalculations1
08/16/2026M01410890-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026M01410890-I1Open ↗