← Back
Two stories - detached, small or mid-size
601 BARD AVENUE
STATEN ISLAND · West New Brighton-Silver Lake-Grymes Hill · BIN 5136993
💬 Discuss this project
1930Year Built
2.5Stories
A1Building Class
R3XZoning
1,440 sfGross Floor Area
1Units
0 Open Violations
Two stories - detached, small or mid-size · 4,165 sf lot · 0.35 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADROIT ENGINEERING PLLC107/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LARGIME MUJOVIC103/21/2026
Building Lifecycle
All (6)Filed (1)Objection (4)Special Inspection (1)
07/06/2026
Objection resolved — Resolved
07/06/2026
Special inspection requirement — Structural Stability – Alterations of existing Buildings
01/29/2026
Objection raised — Structural
01/16/2026
Objection resolved — Open
07/24/2025
Objection raised — Structural
07/10/2025
Filed — Full Demolition
S01252576-I1
Nothing on file for this building.
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
07/06/2026Structural Stability – Alterations of existing Buildings—special
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026S01252576-I1Request digital key ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/19/2026S01252576-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/19/2026S01252576-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWLegalization Inspection Report1
08/13/2026S01252576-I1Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification1
08/13/2026S01252576-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026S01252576-I1Open ↗