Roof33p · 15 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Mechanical Modifications as per plans filed herewith. No change in use, occupancy, or egress.
On file for this job
12 documents · 2 drawing sheets
Filing to decom existing antenna site. Remove 4 antenna and 1 GPS unit from roof and equipment from room on 63rd floor. Initial install approved under app 220062991. No change in use, egress, or occupancy. Carrier Clearwire / Sprint
On file for this job
4 documents · 1 drawing sheet
THIS PROJECT INCLUDES FIT OUT OF EXISTING SHELL SPACE ON THE 6TH FLOOR FOR RADIOLOGY AND ENDOSCOPY PROGRAMS. CORE AND SHELL ARE EXISTING TO REMAIN. MECHANICAL EQUIPMENT SUPPORTING THE 6TH FLOOR WILL BE PLACED ON THE ROOF (7TH FLOOR).
On file for this job
8 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
BulkheadUnder Construction1p · 1 filing · 17 docs
Equipment
Installation of suspended scaffold for facade work and/or inspection. Amend #2 added outrigger detail
On file for this job
17 documents · 1 drawing sheet
Penthouse1p · 3 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Modification of mechanical system related to ductwork as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
65 documents · 1 drawing sheet
Modification to existing plumbing system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this job
30 documents · 1 drawing sheet
Modification of the existing sprinkler system as per plans filed herewith. There will be no change in egress, occupancy or use.
On file for this job
7 documents · 1 drawing sheet
Floor 841p · 1 filing · 20 docs
DM
Mechanical modifications as per plans filed here with. No change in egress, use or occupancy. No change one mechanical drawings
On file for this job
29 documents · 1 drawing sheet
Floor 83
Floor 82
Floor 81
Floor 80
Floor 79
Floor 78
Floor 77
Floor 76
Floor 75
Floor 74
Floor 73
Floor 72
Floor 71
Floor 70
Floor 69
Floor 68
Floor 67
Floor 66
Floor 65
Floor 64
Floor 63
Floor 621p · 1 filing · 6 docs
Structural
Structural modifications as per plans filed herewith. No change in use, egress or occupancy.
On file for this job
6 documents · 1 drawing sheet
Floor 61
Floor 60Under Construction2p · 2 filings · 20 docs
Structural
Issued Permit Scope
Supported Scaffold
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
3 documents
FILING HEREWITH FOR FIT OUT WORK RELATED TO APAX STUDIOS PROJECT ON 58-59 (CONSTRUCTION FLOORS 54-55). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
22 documents · 2 drawing sheets
Floor 59Under Construction40p · 8 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Supported Scaffold
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
3 documents
Plumbing and Sprinkler modifications as per plans filed herewith. No change in egress, use or occupancy.
On file for this job
9 documents · 2 drawing sheets
FILING HEREWITH FOR FIT OUT WORK RELATED TO APAX STUDIOS PROJECT ON 58-59 (CONSTRUCTION FLOORS 54-55). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
10 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 58Under Construction15p · 6 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
Supported Scaffold
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
3 documents
FILING HEREWITH FOR FIT OUT WORK RELATED TO APAX STUDIOS PROJECT ON 58-59 (CONSTRUCTION FLOORS 54-55). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
10 documents · 1 drawing sheet
FILING HEREWITH FOR FIT OUT WORK RELATED TO APAX STUDIOS PROJECT ON 58-59 (CONSTRUCTION FLOORS 54-55). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
12 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 57Under Construction12p · 3 filings · 20 docs
MechanicalStructural
Issued Permit Scope
Structural · Supported Scaffold
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
3 documents
FILING HEREWITH FOR FIT OUT WORK RELATED TO APAX STUDIOS PROJECT ON 58-59 (CONSTRUCTION FLOORS 54-55). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
22 documents
Mechanical Modifications as per plans filed herewith. No change in use, occupancy, or egress.
On file for this job
12 documents · 2 drawing sheets
Floor 56Under Construction17p · 5 filings · 20 docs
MechanicalPlumbingStructural
Issued Permit Scope
Structural · Supported Scaffold
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
3 documents
FILING HEREWITH FOR FIT OUT WORK RELATED TO APAX STUDIOS PROJECT ON 58-59 (CONSTRUCTION FLOORS 54-55). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
22 documents
Mechanical Modifications as per plans filed herewith. No change in use, occupancy, or egress.
On file for this job
12 documents · 4 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 5591p · 9 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural · Supported Scaffold
FILING HEREWITH FOR FIT OUT WORK RELATED TO APAX STUDIOS PROJECT ON 58-59 (CONSTRUCTION FLOORS 54-55). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
12 documents
FILING HEREWITH FOR FIT OUT WORK RELATED TO APAX STUDIOS PROJECT ON 58-59 (CONSTRUCTION FLOORS 54-55). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
19 documents
FILING HEREWITH FOR FIT OUT WORK RELATED TO APAX STUDIOS PROJECT ON 58-59 (CONSTRUCTION FLOORS 54-55). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
22 documents
Latest 3 of 8 filings on this floor.
Floor 54Under Construction61p · 9 filings · 20 docs
ArchitectureCivilElectricalMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural · Supported Scaffold
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
3 documents
Structural portion of interior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms. ALT CO filed under separate application.
On file for this job
12 documents · 1 drawing sheet
FILING HEREWITH FOR FIT OUT WORK RELATED TO APAX STUDIOS PROJECT ON 58-59 (CONSTRUCTION FLOORS 54-55). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
12 documents
Latest 3 of 8 filings on this floor.
Floor 5312p · 17 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Supported Scaffold
Interior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms. ALT CO filed under separate application.
On file for this job
14 documents · 19 drawing sheets
INTERIOR DEMO OF TENANT 53RD FLOOR INCLUDING NON-LOAD BEARING PARTITIONS, INTERIOR FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
On file for this job
5 documents · 3 drawing sheets
Interior demolition/removals of ductwork, AC units, VAV's and piping as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
7 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 5221p · 13 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Supported Scaffold
Interior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms. ALT CO filed under separate application.
On file for this job
14 documents · 1 drawing sheet
Structural portion of interior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms. ALT CO filed under separate application.
On file for this job
12 documents · 3 drawing sheets
Interior demolition as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
4 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 51Under Construction18p · 9 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Supported Scaffold
PL/SP WORK RELATED TO DEMOLITION AND INTERIOR FIT-0T OF 49TH -51ST FLOORS AS PER PLANS.
On file for this job
24 documents · 4 drawing sheets
DEMOLITION AND INTERIOR FIT-0T OF PARTIAL 49TH, 50TH, PARTIAL 51ST AND PARTIAL 52ND FLOORS INCLUDING NON-LOAD BEARING PARTIONS, INTERIOR FINISHES, EXISTING STAIR FINISHES, CORE TOILET ROOMS, REMOVAL OF AN EXISTING CONVIENCE STAIR AND NEW CONVIENCE STAIR
On file for this job
7 documents · 5 drawing sheets
MH WORK RELATED TO DEMOLITION AND INTERIOR FIT-OUT AS PER PLANS.
On file for this job
7 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 50Under Construction29p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Supported Scaffold
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
3 documents
Interior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms. ALT CO filed under separate application.
On file for this job
12 documents
PL/SP WORK RELATED TO DEMOLITION AND INTERIOR FIT-0T OF 49TH -51ST FLOORS AS PER PLANS.
On file for this job
24 documents · 5 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 49Under Construction37p · 13 filings · 20 docs
ArchitectureCivilDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Supported Scaffold
Interior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms. ALT CO filed under separate application.
On file for this job
12 documents · 1 drawing sheet
MECHANICAL FILING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
21 documents · 3 drawing sheets
INSTALLATION OF NON LOAD BEARING PARTITIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
14 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 48Under Construction33p · 9 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Supported Scaffold
Interior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms. ALT CO filed under separate application.
On file for this job
12 documents · 1 drawing sheet
PL/SP WORK RELATED TO DEMOLITION AND INTERIOR FIT-0T OF 49TH -51ST FLOORS AS PER PLANS.
On file for this job
24 documents
MECHANICAL FILING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
21 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 47Under Construction26p · 4 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
Plumbing · Supported Scaffold
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
3 documents
Interior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms. ALT CO filed under separate application.
On file for this job
12 documents
PL/SP WORK RELATED TO DEMOLITION AND INTERIOR FIT-0T OF 49TH -51ST FLOORS AS PER PLANS.
On file for this job
24 documents
Latest 3 of 4 filings on this floor.
Floor 46Under Construction38p · 6 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
Plumbing · Supported Scaffold
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
3 documents
Interior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms. ALT CO filed under separate application.
On file for this job
12 documents
PL/SP WORK RELATED TO DEMOLITION AND INTERIOR FIT-0T OF 49TH -51ST FLOORS AS PER PLANS.
On file for this job
24 documents
Latest 3 of 6 filings on this floor.
Floor 45Under Construction76p · 9 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Supported Scaffold
CHANGE OF USE FROM ALL BUSINESS TO BUISNESS (E), DINING (F-4) AND ASSEMBLY (F-1b). 2 HOURFIRE RATED PARTITION TO TERMINATE PUBLIC ASSEMBLY TRAVEL DISTANCE PER CCD-1,
On file for this job
7 documents · 4 drawing sheets
Job M01335303Permit Issued · 01/20/2026
SD work as per plans.
On file for this job
1 document · 1 drawing sheet
Interior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms. ALT CO filed under separate application.
On file for this job
12 documents
Latest 3 of 8 filings on this floor.
Floor 44Under Construction20p · 3 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
PL/SP work as per plans.
On file for this job
14 documents · 4 drawing sheets
Demolition of existing ductwork, VAVs, AC units, air outlets, and piping on the 45th floor except where noted. Full fit out of the floor with new VAVs, AC units, ductwork, air outlets, piping. New Kitchen exhaust and makeup air systems placed on roof
On file for this job
7 documents · 3 drawing sheets
GC work as per plans. No change to use egress or occupancy on this application.
On file for this job
14 documents · 13 drawing sheets
Floor 431p · 1 filing · 5 docs
Mechanical
Filing for interior mechanical removals prior to fit out on construction floor 39, marketing floor 43. No change to use egress or occupancy on this application.
On file for this job
5 documents · 1 drawing sheet
Floor 42Under Construction49p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Sprinklers
PL/SP work as per plans.
On file for this job
14 documents
GC work as per plans. No change to use egress or occupancy on this application.
On file for this job
14 documents
Mechanical modifications as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
9 documents · 1 drawing sheet
Floor 41Under Construction49p · 3 filings · 20 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Sprinklers · Standpipe
Job M01335303Permit Issued · 01/20/2026
SD work as per plans.
On file for this job
1 document
PL/SP work as per plans.
On file for this job
14 documents
GC work as per plans. No change to use egress or occupancy on this application.
On file for this job
14 documents
Floor 40Under Construction48p · 2 filings · 20 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Sprinklers
PL/SP work as per plans.
On file for this job
14 documents
GC work as per plans. No change to use egress or occupancy on this application.
On file for this job
14 documents
Floor 392p · 2 filings · 8 docs
ArchitectureFire Protection
Filing for interior sprinkler removals prior to fit out on construction floor 39, marketing floor 43. No change to use egress or occupancy on this application.
On file for this job
3 documents · 1 drawing sheet
Removal of non load bearing partitions and internal finishes on construction floor 39, marketing floor 43. No change to use egress or occupancy on this filing.
On file for this job
5 documents · 1 drawing sheet
Floor 38Under Construction1 filing · 7 docs
Structural
Issued Permit Scope
Structural
STRUCTURAL WORK FOR SUPPORT OF REPLACEMENT UPS EQUIPMENT
On file for this job
7 documents
Floor 37
Floor 36
Floor 357p · 4 filings · 20 docs
GeneralMechanicalPlumbingStructural
Installation of sprinkler temp loop and installation of NEW sprinkler heads. No change in egress, use or occupancy.
On file for this job
8 documents · 1 drawing sheet
Structural alterations for new communicating stairs and moving partition as per plans filled herewith. No change in use, egress or occupancy.
On file for this job
7 documents · 1 drawing sheet
Mechanical modifications as per plans filed here with. No change in egress, use or occupancy. No change one mechanical drawings
On file for this job
29 documents · 4 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 348p · 6 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
ST WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS APPLICATION.
On file for this job
6 documents · 1 drawing sheet
Installation of sprinkler temp loop and installation of NEW sprinkler heads. No change in egress, use or occupancy.
On file for this job
8 documents · 1 drawing sheet
Structural alterations for new communicating stairs and moving partition as per plans filled herewith. No change in use, egress or occupancy.
On file for this job
7 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 3319p · 10 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
PROJECT SCOPE IS FOR THE INTERIOR FIT-OUT OF TENANT 33RD FLOOR (29TH FLOOR CONSTRUCTION)INCLUDING NON-LOAD BEARING PARTITIONS, INTERIOR FINISHES, EXISTING STAIR FINISHES AND CORE TOILETROOMS.
On file for this job
5 documents · 8 drawing sheets
New fitout of full 33rd floor. New ductwork connections to base building shafts, new condenser water piping connections to tenant risers, VAV distribution downstream, limited AC units added for supplemental cooling and critical cooling for (1) IDF load.
On file for this job
14 documents · 2 drawing sheets
Filing for interior mechanical removals prior to fit out. No change to use egress or occupancy on this application.
On file for this job
5 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 322p · 1 filing · 14 docs
Architecture
INSTALLATION OF NON LOAD BEARING PARTITIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
14 documents · 2 drawing sheets
Floor 3110p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
MECHANICAL FILING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
21 documents · 2 drawing sheets
INSTALLATION OF NON LOAD BEARING PARTITIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
14 documents · 4 drawing sheets
FILING PLUMBING/SPRINKLER REMOVAL AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUUPANCY.
On file for this job
6 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 3062p · 2 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modification/additions to existing sprinkler system and related piping. No change in use, egress or occupancy under this application.
On file for this job
15 documents · 8 drawing sheets
Modification/additions to existing sprinkler system and related piping. No change in use, egress or occupancy under this application.
On file for this job
24 documents · 3 drawing sheets
Floor 2939p · 5 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Removal of non load bearing partitions and internal finishes. No change to use egress or occupancy on this filing.
On file for this job
7 documents · 1 drawing sheet
Modification/additions to existing sprinkler system and related piping. No change in use, egress or occupancy under this application.
On file for this job
19 documents · 3 drawing sheets
Modification to existing Sprinkler/plumbing system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this job
7 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 2812p · 4 filings · 20 docs
ArchitecturePlumbingStructuralOther
Interior renovations as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
10 documents · 7 drawing sheets
Structural modifications and stair buildout as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
10 documents · 1 drawing sheet
Plumbing modifications as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
12 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 2713p · 4 filings · 20 docs
ArchitecturePlumbingStructural
Interior renovations as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
10 documents · 9 drawing sheets
Structural modifications and stair buildout as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
10 documents · 1 drawing sheet
Plumbing modifications as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
12 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 2611p · 4 filings · 20 docs
ArchitecturePlumbingStructural
Interior renovations as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
10 documents · 8 drawing sheets
Structural modifications and stair buildout as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
10 documents · 1 drawing sheet
Plumbing modifications as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
12 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 2513p · 9 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing
Scheduled proposed FFE layout and new partitions, new fire alarm strobes. No change in use, occupancy or egress.
On file for this job
14 documents · 7 drawing sheets
MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this job
12 documents · 2 drawing sheets
Removal and installation of interior non-bearing partitions and related finishes as per plans filedherewith. No change in use, occupancy or egress.
On file for this job
4 documents · 7 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 247p · 2 filings · 17 docs
ArchitectureDMGeneral
Modifications to sprinkler systems. No change in use, egress, or occupancy
On file for this job
3 documents · 1 drawing sheet
Scheduled proposed FFE layout and new partitions, new fire alarm strobes. No change in use, occupancy or egress.
On file for this job
14 documents · 6 drawing sheets
Floor 23Under Construction29p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Job M01450435Permit Issued · 09/29/2026
Modification to existing HVAC system as per plans filed herewith. NO change in use, egress or occupancy.
Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this job
4 documents
Filing herewith for sprinkler work on floors 26-27 (Construction floors 22-23) as per plans. No change to use egress or occupancy on this application.
On file for this job
22 documents · 1 drawing sheet
Floor 22Under Construction36p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Job M01450435Permit Issued · 09/29/2026
Modification to existing HVAC system as per plans filed herewith. NO change in use, egress or occupancy.
Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this job
4 documents
Filing herewith for sprinkler work on floors 26-27 (Construction floors 22-23) as per plans. No change to use egress or occupancy on this application.
On file for this job
22 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 2111p · 4 filings · 20 docs
Fire ProtectionPlumbingStructural
Issued Permit Scope
Structural
Structural work for demolition of existing beams, new slab opening and new structural steel beams and posts as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
6 documents · 1 drawing sheet
structural demo as per plans filed herewith. no change to use, egress, or occupancy.
On file for this job
4 documents · 1 drawing sheet
Structural modifications as per plans filed here with. No change in egress, use or occupancy.
On file for this job
15 documents
Latest 3 of 4 filings on this floor.
Floor 201p · 1 filing · 19 docs
Plumbing
Plumbing PAA as per plans filled herewith. Initial job description: Plumbing & Sprinkler modifications as per plans filed here with. No change in egress, use or occupancy.
On file for this job
19 documents · 1 drawing sheet
Floor 198p · 4 filings · 20 docs
ArchitectureMechanicalStructural
Structural modifications for stair buildout as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
6 documents · 1 drawing sheet
Mechanical modifications as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
14 documents · 1 drawing sheet
Interior renovations as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
4 documents · 5 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 1810p · 6 filings · 20 docs
ArchitectureDMFire ProtectionStructural
Issued Permit Scope
Protection and Mechanical Methods
Interior renovations on 18th FL as per plans filed herewith. No change to use, egress or occupancy.
On file for this job
9 documents · 8 drawing sheets
Structural modifications for stair buildout as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
6 documents · 1 drawing sheet
New steel around future slab opening at new interconnecting stairs between 15th-16th floors and 17th-18th floors as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
12 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 179p · 4 filings · 20 docs
ArchitectureCivilDMFire Protection
Sprinkler modifications on the 17th floor as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
8 documents · 1 drawing sheet
Plumbing and sprinkler modifications with the removal of standpipe fire hose cabinet as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
15 documents · 1 drawing sheet
Interior renovations on floors 15 and 17 as per plans filed herewith. No change to use, egress or occupancy.
On file for this job
10 documents · 4 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 1611p · 4 filings · 20 docs
ArchitectureCivilMechanicalStructural
Plumbing and sprinkler modifications as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
11 documents · 1 drawing sheet
Interior renovations on as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
5 documents · 8 drawing sheets
Mechanical modifications, amending the mechanical schedule to reflect as built conditions.
On file for this job
12 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 1516p · 6 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralPlumbing
Plumbing and sprinkler modifications with the removal of standpipe fire hose cabinet as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
15 documents · 2 drawing sheets
Interior renovations on floors 15 and 17 as per plans filed herewith. No change to use, egress or occupancy.
On file for this job
10 documents · 4 drawing sheets
Interior demolition of floors 15 and 17 as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
4 documents · 3 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 14
Floor 13
Floor 12
Floor 11
Floor 1011p · 4 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbing
mechanical modifications as per plans filed herewith 10th floor construction (14th floor tenant). no change to use, egress, or occupancy.
On file for this job
7 documents · 3 drawing sheets
plumbing and sprinkler modifications as per plans filed herewith 10th floor construction (14th floor tenant). no change to use, egress, or occupancy.
On file for this job
12 documents · 2 drawing sheets
No filed description on record for this job.
On file for this job
4 documents · 4 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 93p · 1 filing · 12 docs
Mechanical
Mechanical Modifications as per plans filed herewith. No change in use, occupancy, or egress.
On file for this job
12 documents · 3 drawing sheets
Floor 81p · 1 filing · 16 docs
Mechanical
Mechanical modifications as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
16 documents · 1 drawing sheet
Floor 724p · 11 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Sprinklers
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy.
On file for this job
14 documents · 1 drawing sheet
STRUCTURAL FILING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
6 documents · 1 drawing sheet
THIS PROJECT INCLUDES FIT OUT OF EXISTING SHELL SPACE ON THE 6TH FLOOR FOR RADIOLOGY AND ENDOSCOPY PROGRAMS. CORE AND SHELL ARE EXISTING TO REMAIN. MECHANICAL EQUIPMENT SUPPORTING THE 6TH FLOOR WILL BE PLACED ON THE ROOF (7TH FLOOR).
On file for this job
8 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 638p · 15 filings · 20 docs
ArchitectureDMFire ProtectionLandscapeMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy.
On file for this job
14 documents · 2 drawing sheets
Interior renovation to replace medical equipment as per plans filed herewith. No change in use, egress or occupancy.
On file for this job
9 documents · 2 drawing sheets
Plumbing and sprinkler modifications as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
11 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 543p · 13 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Modification to existing plumbing fixtures as per plans filed herewith. NO change in use, egress or occupancy.
On file for this job
12 documents · 5 drawing sheets
Modification to existing Sprinkler, Standpipe system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this job
10 documents · 1 drawing sheet
Modification to existing plumbing fixtures as per plans filed herewith. NO change in use, egress or occupancy.
On file for this job
8 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 422p · 10 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
The installation of a new exhaust riser and HVAC duct work serving the 2nd floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this job
6 documents
INSTALLATION OF NON LOAD BEARING PARTITIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
14 documents · 1 drawing sheet
Modification to existing plumbing fixtures as per plans filed herewith. NO change in use, egress or occupancy.
On file for this job
12 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 313p · 9 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Modification to existing plumbing fixtures & sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this job
5 documents
The installation of a new exhaust riser and HVAC duct work serving the 2nd floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this job
6 documents
FILING HEREWITH FOR FIT OUT WORK RELATED TO APAX STUDIOS PROJECT ON 58-59 (CONSTRUCTION FLOORS 54-55). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
19 documents
Latest 3 of 8 filings on this floor.
Floor 257p · 18 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Structural
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy.
On file for this job
14 documents · 1 drawing sheet
Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.
On file for this job
14 documents · 12 drawing sheets
Modification to existing plumbing fixtures as per plans filed herewith. NO change in use, egress or occupancy.
On file for this job
12 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 138p · 16 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction
HEREWITH FILING FOR INTERIOR RENOVATIONS AT THE SUBCELLAR, CELLAR, MEZZANINE AND 1ST LEVEL OF ST PETERS CHURCH PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
8 documents · 2 drawing sheets
Modification to existing plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this job
9 documents · 1 drawing sheet
Modification to existing plumbing fixtures as per plans filed herewith. NO change in use, egress or occupancy.
On file for this job
12 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Mezzanine8p · 2 filings · 12 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction
HEREWITH FILING FOR INTERIOR RENOVATIONS AT THE SUBCELLAR, CELLAR, MEZZANINE AND 1ST LEVEL OF ST PETERS CHURCH PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
8 documents
No filed description on record for this job.
On file for this job
4 documents · 1 drawing sheet
Cellar67p · 18 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Sprinklers
Modification to existing Sprinkler system and plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this job
16 documents · 2 drawing sheets
Removal and installation of interior non-bearing partitions and related finishes. No change in use, egress or occupancy.
On file for this job
8 documents · 2 drawing sheets
Modification to existing plumbing fixtures & sprinkler system as per plans filed herewith. NO change in use, egress or occupancy.
On file for this job
25 documents · 4 drawing sheets
Latest 3 of 8 filings on this floor.
Sub-Cellar50p · 13 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Sprinklers · Structural
HEREWITH FILING FOR INTERIOR RENOVATIONS AT THE SUBCELLAR, CELLAR, MEZZANINE AND 1ST LEVEL OF ST PETERS CHURCH PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
8 documents
Modification to existing Sprinkler system and plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this job
16 documents · 4 drawing sheets
Sprinkler modification to existing Sprinkler systems as per plans filed herewith. No change in use, egress , or occupancy.
On file for this job
4 documents
Latest 3 of 8 filings on this floor.