← Back
Public elementary, junior or senior high
2927 BRIGHTON 6 STREET
BROOKLYN · BIN 3244470
💬 Discuss this project
1937Year Built
5Stories
W1Building Class
R6Zoning
138,910 sfGross Floor Area
2Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 75,000 sf lot · 1.85 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof3 filings · 20 docs
Floor 45p · 3 filings · 20 docs
Floor 38p · 4 filings · 20 docs
Floor 25p · 3 filings · 20 docs
Floor 13p · 3 filings · 20 docs
Basement2p · 2 filings · 20 docs
Sub-BasementUnder Construction3p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY7008/21/2026
NYC DEPARTMENT OF EDUCATION203/22/2026
DOE P.S. 2531003/22/2026
D.O.E. P.S.253 0203/22/2026
DOE PS 253 040403/22/2026
DOE 040103/22/2026
DEPARTMENT OF EDUCATION903/22/2026
DEPARTMENT OF EDUCATION 0103/22/2026
DOE PS 253 TRANSPORTABLE103/22/2026
D.O.E. 1 0203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES203/21/2026
JMV ASSOCIATES1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
T. MORIARTY & SON, INCGeneral Contractor1907/08/2026
EAGLE 1 MECHANICAL, INCPlumbing607/08/2026
A & F FIRE PROTECTION COFire Protection508/21/2026
ACS SYSTEM ASSOCIATES INC.General Contractor307/08/2026
KELLY MASONRY CORPGeneral Contractor303/21/2026
PJP INSTALLERS INCGeneral Contractor307/08/2026
EAGLE 1 MECHANICAL INCGeneral Contractor307/08/2026
K. & V. CONSTRUCTION INCGeneral Contractor207/08/2026
MACCARONE PLUMBING INCPlumbing107/08/2026
FRANCIS RICHARDSElectrical103/21/2026
JOSHUA ANDERSONElectrical103/21/2026
KWOK LIElectrical103/21/2026
LI KWOKElectrical103/21/2026
STANCO SYSTEM ELEC'L CONTElectrical103/22/2026
CHARAN ELEC'L ENTERP'S INElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983208/11/2026
MUNICIPAL TESTING LABORAT230412/02/2022
Building Lifecycle
All (161)Filed (8)Permit Issued (33)Signed Off (1)Violation (60)Inspection (24)Objection (11)Special Inspection (24)
08/20/2026
Permit issued — Sprinklers
B01223246-I1-EW-SP
08/19/2026
Special inspection requirement — Sprinkler Systems
Noel Tolentino
08/11/2026
Filed — Alteration
P.S. 253-K: Replace 3 valves without monitoring to 3 new valves with tamper switches to be connected into fire alarm system.
B01223246-P1
08/10/2026
Special inspection requirement — Sprinkler Systems
Noel Tolentino
08/07/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/13/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/02/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/24/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/23/2025
Objection resolved — Addressed
07/14/2025
Violation issued (ECB, closed)
Construction
07/14/2025
Violation issued (ECB, closed)
Construction
07/14/2025
Violation issued (ECB, closed)
Construction
06/16/2025
Objection raised — Other
06/05/2025
Filed — Alteration
P.S. 253-K: Replace 3 valves without monitoring to 3 new valves with tamper switches to be connected into fire alarm system.
B01223246-I1
06/02/2025
Violation issued (FDNY_ORDER, closed)
05/07/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/16/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/19/2025
Violation issued (FDNY_ORDER, closed)
01/31/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/30/2024
Violation issued (FDNY_ORDER, closed)
10/30/2024
Violation issued (FDNY_ORDER, closed)
10/30/2024
Violation issued (FDNY_ORDER, closed)
09/25/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
09/25/2024
Inspection — Pass-Final SD - Up to 9 Requested Floors
Pass
View inspection ↗
09/25/2024
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
09/17/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/16/2024
Violation issued (FDNY_ORDER, closed)
07/19/2024
Violation issued (ECB, closed)
Construction
07/19/2024
Violation issued (ECB, closed)
Construction
07/19/2024
Violation issued (ECB, closed)
Construction
06/27/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/27/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/04/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/01/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/17/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/17/2024
Inspection — Pass-Final SD - Up to 9 Requested Floors
Pass
View inspection ↗
04/17/2024
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
04/12/2024
Violation issued (FDNY_NOV, closed)
03/01/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/29/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/29/2023
Special inspection requirement — Interior lighting power
11/29/2023
Special inspection requirement — Lighting controls
11/17/2023
Objection raised — Other
11/07/2023
Filed — Alteration
P.S> 253-K: Proposed installation of back flow devices and floor slab core drilling to an existing school building.
B00958301-I1
11/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/06/2023
Special inspection requirement — Post-installed Anchors
10/27/2023
Violation issued (FDNY_ORDER, closed)
10/19/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
09/18/2023
Special inspection requirement — Post-installed Anchors
09/18/2023
Special inspection requirement — Energy Code Compliance Inspections
09/14/2023
Special inspection requirement — Fire-Resistance Rated Construction
09/14/2023
Special inspection requirement — Structural Steel - High Strength Bolting
09/07/2023
Special inspection requirement — Post-installed Anchors
08/24/2023
Permit issued — Plumbing
B14939981-S2-PL
07/07/2023
Permit issued — Sidewalk Shed
B00712660-I1-SH
05/03/2023
Permit issued — Support of Excavation
B00699146-I1-SE
05/03/2023
Permit issued — Support of Excavation
B00704409-I1-SE
04/17/2023
Permit issued — Supported Scaffold
B00834858-I1-SF
Latest 60 of 161 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedA & F FIRE PROTECTION CO08/20/2026
DOB NOWPlumbingPermit IssuedMACCARONE PLUMBING INC08/24/2023
DOB NOWSidewalk ShedSigned-offPJP INSTALLERS INC07/07/2023
DOB NOWSupport of ExcavationSigned-offT. MORIARTY & SON, INC05/03/2023
DOB NOWSupport of ExcavationSigned-offT. MORIARTY & SON, INC05/03/2023
DOB NOWSupported ScaffoldSigned-offKELLY MASONRY CORP04/17/2023
DOB NOWMechanical SystemsPermit IssuedACS SYSTEM ASSOCIATES INC.04/12/2023
DOB NOWSprinklersPermit IssuedADVANCED AUTO SPR.CO.,INC04/10/2023
DOB NOWStandpipePermit IssuedADVANCED AUTO SPR.CO.,INC04/10/2023
DOB NOWBoiler EquipmentSigned-offEAGLE 1 MECHANICAL, INC04/04/2023
DOB NOWConstruction FenceSigned-offT. MORIARTY & SON, INC04/01/2023
DOB NOWGeneral ConstructionSigned-offEAGLE 1 MECHANICAL INC03/27/2023
DOB NOWPlumbingPermit IssuedEAGLE 1 MECHANICAL, INC02/24/2023
DOB NOWPlumbingPermit IssuedEAGLE 1 MECHANICAL, INC02/24/2023
DOB NOWProtection and Mechanical MethodsSigned-offT. MORIARTY & SON, INC01/23/2023
DOB NOWGeneral ConstructionSigned-offT. MORIARTY & SON, INC08/15/2022
DOB NOWMechanical SystemsPermit IssuedACS SYSTEM ASSOCIATES INC.07/12/2022
DOB NOWSidewalk ShedSigned-offPJP INSTALLERS INC07/01/2022
DOB NOWSupport of ExcavationSigned-offT. MORIARTY & SON, INC06/02/2022
DOB NOWSupport of ExcavationSigned-offT. MORIARTY & SON, INC06/02/2022
DOB NOWSupport of ExcavationSigned-offT. MORIARTY & SON, INC05/23/2022
DOB NOWBoiler EquipmentSigned-offEAGLE 1 MECHANICAL, INC05/10/2022
DOB NOWStandpipePermit IssuedADVANCED AUTO SPR.CO.,INC05/09/2022
DOB NOWSprinklersPermit IssuedADVANCED AUTO SPR.CO.,INC05/09/2022
DOB NOWGeneral ConstructionSigned-offEAGLE 1 MECHANICAL INC04/01/2022
DOB NOWSupport of ExcavationSigned-offT. MORIARTY & SON, INC03/31/2022
DOB NOWConstruction FenceSigned-offT. MORIARTY & SON, INC03/31/2022
DOB NOWPlumbingPermit IssuedEAGLE 1 MECHANICAL, INC03/17/2022
DOB NOWPlumbingPermit IssuedEAGLE 1 MECHANICAL, INC03/17/2022
DOB NOWConstruction FenceSigned-offT. MORIARTY & SON, INC03/03/2022
DOB NOWSupport of ExcavationSigned-offT. MORIARTY & SON, INC03/03/2022
DOB NOWConstruction FenceSigned-offK V CONSTRUCTION12/17/2021
DOB NOWConstruction FenceSigned-offK V CONSTRUCTION09/15/2021
BISOTISSUEDT. MORIARTY & SON, INC04/05/2024
BISOTISSUEDT. MORIARTY & SON, INC03/31/2023
BISOTISSUEDT. MORIARTY & SON, INC11/04/2022
BISOTISSUEDK. & V. CONSTRUCTION INC12/20/2021
BISPLISSUEDFRANCO BELLI PLMG&HTG SON10/05/2021
BISOTISSUEDK. & V. CONSTRUCTION INC10/05/2021
BISPLISSUEDVARSITY PLBG AND HTG INC01/07/2021
+ 43 more permits on file
1 project · most recent 12/02/2022
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/02/2022——Ventilation Systems
Ventilation
Greenheck CSP-A200 150 CFM · Exhaust Fan ×3
SQ-97-VG 165 CFM · Exhaust Fan ×1
2 projects · most recent 08/11/2026
FiledStatusContractorScope
08/11/2026Permit IssuedA & F FIRE PROTECTION CO6 heads
12/02/2022———
2 projects · most recent 11/07/2023
Water/Sanitary
FiledStatusContractorScope
11/07/2023——Water/Sanitary
12/02/2022——Water/Sanitary
17 projects · most recent 09/18/2026
General Wiring
FiledStatusContractorScope
09/18/2026Permit IssuedA & S ELECTRIC INC.General Wiring
03/11/2025Permit IssuedWILLDAN ELECTRICAL OF NYGeneral Wiring
09/04/2024CompleteCHARAN ELEC'L ENTERP'S IN—
08/29/2022CompleteARK SYSTEMS ELEC. CORP1 meters, 1 new_meters
08/24/2021CompleteLERCO ELECTRIC LLCGeneral Wiring
04/27/2021CompleteG & F.A.ST ELECTRIC INCGeneral Wiring
03/02/2021CompleteSTANCO SYSTEM ELEC'L CONT—
11/13/2019CompleteA.T.J. ELECTRICAL CO.INC.General Wiring
11/13/2019CompleteA.T.J. ELECTRICAL CO.INC.General Wiring
08/27/2019CompleteGEMINI ELECTRIC CO., INC.General Wiring
02/11/2019Permit IssuedPACIFIC ELEC'L CONTR'G IN—
01/29/2019CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
12/06/2018CompleteCHARAN ELEC'L ENTERP'S IN—
11/13/2018CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
09/05/2018CompleteSTANCO SYSTEM ELEC'L CONT—
1 project · most recent 12/02/2022
Steel Concrete
FiledStatusContractorScope
12/02/2022——Steel, Concrete
▾Field Inspections (DOB CAP) — 24
DateTypeResultReport
08/07/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/15/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/13/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/02/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/24/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/07/2025Pass-Final General Construction Non-Directive 14PassView ↗
04/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/31/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/25/2024Pass-Final PL - UndergroundPassView ↗
09/25/2024Pass-Final SD - Up to 9 Requested FloorsPassView ↗
09/25/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
09/17/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/27/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/27/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/04/2024Pass-Final General Construction Non-Directive 14PassView ↗
05/01/2024Pass-Final PL - UndergroundPassView ↗
04/17/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/17/2024Pass-Final SD - Up to 9 Requested FloorsPassView ↗
04/17/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
03/01/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/29/2024Pass-Final Boiler Equipment InspectionPassView ↗
10/19/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/03/2022Pass-Final Fence Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
08/19/2026Sprinkler SystemsNoel Tolentinospecial
08/10/2026Sprinkler SystemsNoel Tolentinospecial
11/29/2023Interior lighting power—energy_progress
11/29/2023Lighting controls—energy_progress
11/06/2023Fire-Resistant Penetrations and Joints—special
11/06/2023Post-installed Anchors—special
09/18/2023Post-installed Anchors—special
09/18/2023Energy Code Compliance Inspections—progress
09/14/2023Fire-Resistance Rated Construction—progress
09/14/2023Structural Steel - High Strength Bolting—special
09/07/2023Post-installed Anchors—special
11/28/2022FinalCLOUD LEEprogress
11/28/2022Mechanical SystemsCLOUD LEEspecial
11/23/2022Fire-Resistant Penetrations and JointsCLOUD LEEspecial
11/23/2022Sprinkler SystemsCLOUD LEEspecial
11/03/2022Concrete - Cast-In-PlaceSTEPHEN LATUSspecial
11/03/2022FinalSTEPHEN LATUSprogress
11/03/2022Structural Steel - DetailsSTEPHEN LATUSspecial
11/03/2022Fire-Resistant Penetrations and JointsSTEPHEN LATUSspecial
11/03/2022Structural Cold-Formed SteelSTEPHEN LATUSspecial
11/03/2022Structural Steel - WeldingSTEPHEN LATUSspecial
11/03/2022Post-installed AnchorsSTEPHEN LATUSspecial
11/03/2022Sprayed fire-resistant materialsSTEPHEN LATUSspecial
11/03/2022Structural Stability – Alterations of existing buildingsSTEPHEN LATUSspecial
▾Documents — 67 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/01/2026B00580692-I1Request digital key ↗
08/26/2026B00958301-I1Request digital key ↗
08/21/2026B01223246-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION4
09/16/2014320714973Open ↗
06/07/2014320722134Open ↗
12/16/2013320714973Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
06/07/2014320722134Open ↗
02/28/2013320714973Open ↗
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/01/2026B00580692-I1Open ↗
08/28/2026B08044913-I1Open ↗
08/28/2026B08034093-I1Open ↗
Showing 3 of 8 on file for this type
▸BISProfessional and Owner Certification (POC3)3
06/07/2014320722134Open ↗
06/07/2014320722134Open ↗
06/07/2014320722134Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
02/28/2013320714973Open ↗
02/28/2013320714973Open ↗
02/28/2013320714973Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B08034093-I1Open ↗
09/01/2026B01223246-I1Open ↗
08/30/2026B01223246-P1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
06/07/2014320722134Open ↗
02/28/2013320714973Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026B08034093-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWNYCSCA - Approved Site Safety Plans1
08/13/2026B00580692-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026B01223246-I1Open ↗
08/21/2026B01223246-P1Open ↗
▸Approvals, Objections & Sign-offs19
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
09/01/2026B00580692-I1Open ↗
08/21/2026B01223246-P1Open ↗
08/13/2026B00958301-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)8
08/21/2026B01223246-P1Open ↗
08/13/2026B08044913-I1Open ↗
08/13/2026B00580692-I1Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
06/07/2014320722134Open ↗
02/28/2013320714973Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026B00580692-I1Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
04/15/2013320722134Open ↗
03/05/2013320714973Open ↗
▸Other Documents9
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal8
08/21/2026B01223246-P1Open ↗
08/13/2026B08034093-S2Open ↗
08/13/2026B08044913-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWNYCSCA Exhibit 21
08/13/2026B00580692-I1Open ↗