← Back
Elevator apt, semi-fireproof with stores
3461 BROADWAY
MANHATTAN · Hamilton Heights-Sugar Hill · BIN 1062330
💬 Discuss this project
1909Year Built
6Stories
D7Building Class
R8Zoning
47,526 sfGross Floor Area
11Units
LL97 CoveredRent Stabilized
Elevator apt, semi-fireproof with stores · Owner of record: 141 BROADWAY ASSOCIATES, L.L.C. · 9,992 sf lot · 4.76 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Floor 69p · 2 filings · 20 docs
Floor 5
Floor 4
Floor 3
Floor 29p · 1 filing · 20 docs
Floor 16p · 3 filings · 20 docs
Site & exterior5p · 1 filing · 2 docs
Filed — no permit issued2p · 1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JUNG H. CHOI, ARCHITECT, PC311/07/2024
ALLEN SHINFELD, P.E. PLLC407/29/2024
JOSE L. PENA,P.E.310/04/2022
JOEL PHAGOO P.E. PLLC101/31/2019
GREEN DESIGN107/14/2018
Nothing on file for this building.
Nothing on file for this building.
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
11/12/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/06/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/20/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/20/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/20/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/10/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/18/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/15/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/09/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
11/13/2024Structural Stability – Alterations of existing buildingsJung Choispecial
11/13/2024FinalNAVEEN KUMARprogress
11/13/2024Energy Code Compliance InspectionsJung Choiprogress
11/13/2024Fire-Resistance Rated ConstructionJung Choiprogress
11/13/2024Fire-Resistant Penetrations and JointsJung Choispecial
11/13/2024Tenant Protection Plan ComplianceJung Choispecial
11/13/2024Construction Operations Influencing Adjacent StructuresJung Choispecial
11/13/2024Structural Steel - DetailsYounes Abouyaalaspecial
11/13/2024Structural Cold-Formed SteelJung Choispecial
07/17/2024Energy Code Compliance InspectionsJung Choiprogress
07/17/2024Fire-Resistance Rated ConstructionJung Choiprogress
07/17/2024Construction Operations Influencing Adjacent StructuresJung Choispecial
07/17/2024Fire-Resistant Penetrations and JointsJung Choispecial
07/17/2024Structural Cold-Formed SteelJung Choispecial
07/17/2024Structural Stability – Alterations of existing buildingsJung Choispecial
07/17/2024Structural Steel - DetailsYounes Abouyaalaspecial
07/17/2024Tenant Protection Plan Compliance—special
07/17/2024FinalNAVEEN KUMARprogress
06/14/2024Fire-Resistant Penetrations and JointsALLEN SHINFELDspecial
06/14/2024Energy Code Compliance InspectionsALLEN SHINFELDprogress
06/14/2024Tenant Protection Plan ComplianceALLEN SHINFELDspecial
05/15/2024Tenant Protection Plan ComplianceALLEN SHINFELDspecial
05/15/2024Energy Code Compliance InspectionsALLEN SHINFELDprogress
05/15/2024Fire-Resistant Penetrations and JointsALLEN SHINFELDspecial
03/29/2023FinalALLEN SHINFELDprogress
Latest 25 of 34.
Nothing on file for this building.