Elevator apt, semi-fireproof with stores
601 WEST 148TH STREET
MANHATTAN · BIN 1062436
💬 Discuss this project
1900Year Built
7Stories
D7Building Class
R8Zoning
20,825 sfGross Floor Area
20Units
Rent Stabilized0 Active ViolationsFISP: SWARMP
Elevator apt, semi-fireproof with stores · Owner of record: Restoring Communities Housing Developmen T Fundcorp · 3,200 sf lot · 6.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Dental office installation with plumbing and sprinkler renov31p · 1 filing · 20 docs
CellarCommunity League Of The Jnity League Of The1p · 1 filing · 11 docs
BasementCommunity League Of The Jnity League Of The1p · 1 filing · 11 docs
Sub-BasementDental office installation with plumbing and sprinkler renov30p · 1 filing · 20 docs
Site & exteriorCommunity League of the Heights13p · 5 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Community League of the Heights1307/08/2026
Housing of Preservation Development1203/21/2026
NYC Department of Housing Preservation and Development907/08/2026
Restoring Communities HDFC303/22/2026
Unified Services103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/25/2026$17.8M—RESTORING COMMUNITIES HOUSING DEVELOPMENT FUNDCORP → 601 WEST 148TH STREET HOUSING DEVELOPMENT FUNDCORP$856/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Concessi Engineering409/16/2025
MSM Engineering Services106/03/2024
Old Structures Engineering101/08/2024
KV Lambiris Architect110/21/2021
AZ Professional Engineering107/30/2021
Rosenthal102/10/2021
KZ Engineering110/10/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MP Design and Construction803/21/2026
Municipal Building Consultants103/21/2026
Synergy Building Consultants103/21/2026
BMB Building Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Marte DevelopmentGeneral Contractor504/09/2026
CS BridgeScaffold407/08/2026
Renew PlumbingPlumbing403/22/2026
Gotham Technical ServicesElectrical303/22/2026
FG-PHScaffold307/08/2026
Rapid ContractingScaffold203/21/2026
Aranda Plumbing & HeatingPlumbing207/08/2026
Metro Contracting NYScaffold107/08/2026
Horizon ConstructionGeneral Contractor107/08/2026
Cegf & G PlumbingPlumbing107/08/2026
Renew PlumbingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Concessi Engineering540409/16/2025
Chen Engineering Services1826101/08/2024
AZ Professional Engineering766107/30/2021
Fairfield Testing Laborat3404102/10/2021
Building Lifecycle
All (149)Filed (11)Permit Issued (15)Signed Off (9)Facade (FISP) (15)Violation (60)Inspection (6)Objection (4)Special Inspection (29)
12/03/2025
Violation issued (ECB, closed)
Elevators
11/10/2025
Signed off — Alteration
RENOVATION OF EXISTING INTERIOR SPACE TO BUILD A NEW DENTAL OFFICE. INSTALLATION OF NEW HVAC UNITS AND DEVICES. NO CHANGE OF USE EGRESS OR OCCUPANCY.
M00963198-I1
11/10/2025
Permit issued — Mechanical Systems
M00963198-I1-MS
11/05/2025
Signed off — Alteration
M00561934-I1
10/23/2025
Signed off — Alteration
RENOVATION OF EXISTING INTERIOR SPACE TO BUILD A NEW DENTAL OFFICE. INSTALLATION OF NEW HVAC UNITS AND DEVICES. NO CHANGE OF USE EGRESS OR OCCUPANCY.
M00963198-S1
09/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
Robert Concessi
09/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Concessi
09/18/2025
Special inspection requirement — Maintenance information
Robert Concessi
09/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
Robert Concessi
09/18/2025
Special inspection requirement — Lighting controls
Robert Concessi
09/18/2025
Special inspection requirement — Interior lighting power
Robert Concessi
09/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Concessi
09/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
Robert Concessi
09/18/2025
Special inspection requirement — Mechanical Systems
Robert Concessi
09/18/2025
Special inspection requirement — Final
Robert Concessi
09/16/2025
Filed — Alteration
RENOVATION OF EXISTING INTERIOR SPACE TO BUILD A NEW DENTAL OFFICE. INSTALLATION OF NEW HVAC UNITS AND DEVICES. NO CHANGE OF USE EGRESS OR OCCUPANCY.
M00963198-P2
09/16/2025
Filed — Alteration
RENOVATION OF EXISTING INTERIOR SPACE TO BUILD A NEW DENTAL OFFICE. INSTALLATION OF NEW HVAC UNITS AND DEVICES. NO CHANGE OF USE EGRESS OR OCCUPANCY.
M00963198-P1
09/16/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/05/2025
Special inspection requirement — Sprinkler Systems
Robert Concessi
09/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Concessi
09/05/2025
Special inspection requirement — Mechanical Systems
Robert Concessi
09/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/05/2025
Special inspection requirement — Final
Robert Concessi
09/05/2025
Special inspection requirement — Interior lighting power
Robert Concessi
09/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
Robert Concessi
09/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Concessi
09/05/2025
Special inspection requirement — Maintenance information
Robert Concessi
09/05/2025
Special inspection requirement — Lighting controls
Robert Concessi
09/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
Robert Concessi
09/04/2025
Violation issued (HPD, closed)
C
08/06/2025
Signed off — Alteration
M00972724-I1
07/11/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/08/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/26/2025
Permit issued — Sprinklers
M00963198-S1-EW-SP
06/17/2025
Permit issued — General Construction
M00972724-I1-GC
06/04/2025
Violation issued (HPD, closed)
A
05/01/2025
Cycle 10 facade report signed — SWARMP
04/28/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/18/2025
Violation issued (HPD, closed)
C
02/24/2025
Cycle 10 facade report submitted
02/24/2025
Cycle 10 facade inspection completed
01/23/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01054782-I1
12/16/2024
Violation issued (ECB, closed)
Construction
11/22/2024
Violation issued (HPD, closed)
I
11/08/2024
Signed off — Alteration
M01103641-I1
10/11/2024
Violation issued (ECB, closed)
Elevators
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/11/2024
Violation issued (HPD, closed)
A
08/30/2024
Permit issued — Suspended Scaffold
M01103641-I1-SC
08/28/2024
Filed — Alteration
M01103641-I1
07/01/2024
Violation issued (ECB, closed)
Construction
06/07/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/03/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01054782-I1
06/03/2024
Permit issued — Mechanical Systems
M00963198-I1-GC
06/03/2024
Permit issued — Sidewalk Shed
M01054782-I1-SH
05/03/2024
Permit issued — Sprinklers
M00963198-S1-PL
04/17/2024
Permit issued — Mechanical Systems
M00963198-I1-GC
04/06/2024
Filed — Alteration
RENOVATION OF EXISTING INTERIOR SPACE TO BUILD A NEW DENTAL OFFICE. INSTALLATION OF NEW HVAC UNITS AND DEVICES. NO CHANGE OF USE EGRESS OR OCCUPANCY.
M00963198-I1
Latest 60 of 149 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMarte Development11/10/2025
DOB NOWSprinklersSigned-offRenew Plumbing06/26/2025
DOB NOWGeneral ConstructionSigned-offHorizon Construction06/17/2025
DOB NOWSuspended ScaffoldSigned-offSuper Gen Construction Group08/30/2024
DOB NOWMechanical SystemsSigned-offMarte Development06/03/2024
DOB NOWSidewalk ShedSigned-offMetro Contracting NY06/03/2024
DOB NOWPlumbingSigned-offAranda Plumbing & Heating05/03/2024
DOB NOWMechanical SystemsSigned-offMarte Development04/17/2024
DOB NOWConstruction FenceSigned-offFG-PH11/16/2021
DOB NOWConstruction FenceSigned-offFG-PH10/22/2021
DOB NOWSidewalk ShedSigned-offCS Bridge08/30/2021
DOB NOWSupported ScaffoldSigned-offRapid Contracting08/02/2021
DOB NOWBoiler EquipmentSigned-offBell Construction Service05/14/2021
DOB NOWSidewalk ShedSigned-offCS Bridge09/30/2020
DOB NOWSidewalk ShedSigned-offCS Bridge10/10/2019
BIS—ISSUEDFG-PH11/12/2021
BISEQISSUEDFG-PH11/12/2021
BISPLISSUEDCegf & G Plumbing11/10/2021
BIS—ISSUEDFG-PH03/24/2021
BIS—ISSUEDFG-PH11/18/2020
BISEQISSUEDFG-PH11/18/2020
BISPLISSUEDCegf & G Plumbing11/17/2020
BIS—ISSUEDFG-PH05/28/2020
BISPLISSUEDCegf & G Plumbing11/19/2019
BIS—ISSUEDFG-PH11/19/2019
BISEQISSUEDFG-PH11/19/2019
BISOTISSUEDNew Pal Construction06/06/2008
BISEQISSUEDMark Construction Co04/04/2008
BISMHISSUEDSahota General Construction10/18/2005
BISPLISSUEDThe Plumbing Company03/11/2005
BISOTISSUEDDahota General Construction02/18/2005
BIS—ISSUEDVista Media Group05/04/2000
BISOTISSUEDLakhi General Contractor05/08/1997
BISPLISSUEDA.G. Construction07/10/1991
BISOTISSUEDA.G. Construction07/10/1991
BIS—ISSUEDGC Tech Consulting05/17/1991
BISEQISSUEDLilly Construction06/28/1990
BIS—ISSUEDLilly Construction06/28/1990
5 projects · most recent 02/06/2025
General Wiring
FiledStatusContractorScope
02/06/2025CompleteGotham Technical ServicesGeneral Wiring
06/05/2024CompleteRichard Neu—
04/22/2024CompleteWCK ElectricGeneral Wiring
09/25/2019CompleteNash Electric Services—
07/25/2019CompleteElectrical SolutionsGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/16/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/11/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/08/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/28/2021Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
09/18/2025HVAC-R and service water heating equipmentRobert Concessienergy_progress
09/18/2025HVAC-R and service water piping design and insulationRobert Concessienergy_progress
09/18/2025Maintenance informationRobert Concessienergy_progress
09/18/2025HVAC-R and service water heating system controlsRobert Concessienergy_progress
09/18/2025Lighting controlsRobert Concessienergy_progress
09/18/2025Interior lighting powerRobert Concessienergy_progress
09/18/2025Fire-Resistant Penetrations and JointsRobert Concessispecial
09/18/2025Tenant Protection Plan ComplianceRobert Concessispecial
09/18/2025Mechanical SystemsRobert Concessispecial
09/18/2025FinalRobert Concessiprogress
09/08/2025Tenant Protection Plan Compliance—special
09/05/2025Sprinkler SystemsRobert Concessispecial
09/05/2025Fire-Resistant Penetrations and JointsRobert Concessispecial
09/05/2025Mechanical SystemsRobert Concessispecial
09/05/2025Tenant Protection Plan Compliance—special
09/05/2025FinalRobert Concessiprogress
09/05/2025Interior lighting powerRobert Concessienergy_progress
09/05/2025HVAC-R and service water heating system controlsRobert Concessienergy_progress
09/05/2025HVAC-R and service water piping design and insulationRobert Concessienergy_progress
09/05/2025Maintenance informationRobert Concessienergy_progress
09/05/2025Lighting controlsRobert Concessienergy_progress
09/05/2025HVAC-R and service water heating equipmentRobert Concessienergy_progress
07/21/2021Post-installed AnchorsVIJAY KUMARspecial
02/10/2021Fire-Resistant Penetrations and JointsJAMES QUILLspecial
01/28/2021Maintenance informationJAMES QUILLenergy_progress
Latest 25 of 29.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Community League of the HeightsCommunity Facility—
Project M00972724 Alteration · LOC Issued · 01/08/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 195 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch9
09/03/2026M00561934-I1Request digital key ↗
09/03/2026M00616132-I1Request digital key ↗
08/28/2026M00972724-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment1
08/15/2026M00461889-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00234432-I1Request digital key ↗
▸Applications & Permits38
▸BISPLAN / WORK APPROVAL APPLICATION30
07/22/2022102604193Open ↗
07/08/2022100055501Open ↗
06/27/2022100264072Open ↗
Showing 3 of 30 on file for this type
▸BISWORK PERMIT APPLICATION7
03/24/2021121204561Open ↗
12/04/2019121204561Open ↗
11/20/2019121204561Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/21/2021121204561Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
05/10/2018121204561Open ↗
▸Seals & Professional Certifications49
▸DOB NOWProgress Inspector Seal & Signature18
09/23/2026M00461889-I1Open ↗
09/23/2026M00461889-I1Open ↗
09/23/2026M00461889-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/03/2026M00616132-I1Open ↗
08/27/2026M00963198-I1Open ↗
08/27/2026M00963198-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/23/2026M00461889-I1Open ↗
09/23/2026M00461889-I1Open ↗
08/26/2026M00963198-P2Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
11/19/2019121204561Open ↗
11/19/2019121204561Open ↗
11/19/2019121204561Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
06/05/2008110190775Open ↗
04/04/2008110127997Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
06/05/2008110190775Open ↗
04/04/2008110127997Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING6
11/16/2021121204561Open ↗
11/03/2021121204561Open ↗
08/12/2021121204561Open ↗
Showing 3 of 6 on file for this type
▸BISSPRINKLER SYSTEMS1
12/01/2021121204561Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/29/2026121204561Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
04/27/2022123457703Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
05/09/2018121204561Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026M00963198-P2Open ↗
08/27/2026M00963198-P1Open ↗
08/27/2026M00963198-S1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
06/05/2008110190775Open ↗
04/04/2008110127997Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
11/20/2019121204561Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00461889-I1Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
04/25/2022121204561Open ↗
06/27/2018121204561Open ↗
06/27/2018121204561Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/19/2019121204561Open ↗
11/19/2019121204561Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026M00963198-I1Open ↗
08/13/2026M00461889-I1Open ↗
▸BISEXTERIOR LIGHTING POWER1
12/09/2022121204561Open ↗
▸BISLIGHTING CONTROLS1
12/09/2022121204561Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/25/2022121204561Open ↗
▸BISINTERIOR LIGHTING POWER1
12/09/2022121204561Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00461889-I1Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY10
04/25/2022121204561Open ↗
12/01/2021121204561Open ↗
11/29/2021121204561Open ↗
Showing 3 of 10 on file for this type
▸BISHYDRO FLOW TEST LETTER1
05/10/2018121204561Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
05/10/2018121204561Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
11/19/2019121204561Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
11/19/2019121204561Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
04/27/2022121204561Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
02/06/2026121204561Open ↗
▸Approvals, Objections & Sign-offs15
▸BISLETTERS - SUPPORTING DOCUMENTATION6
03/18/2022121204561Open ↗
06/27/2018121204561Open ↗
05/18/2018121204561Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
08/19/2021121204561Open ↗
05/04/2018121204561Open ↗
04/09/2018121204561Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
12/19/2024110127997Open ↗
06/21/2022123457703Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
06/05/2008110190775Open ↗
04/04/2008110127997Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026M00234432-I1Open ↗
08/13/2026M00461889-I1Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT2
06/27/2018121204561Open ↗
06/06/2008110190775Open ↗
▸BISOK TO ISSUE TCO PENDING RESOLUTION OFOPEN FACADE VIOLATION - AFFIDAVIT ATTACHED2
04/22/2025121204561Open ↗
03/26/2025121204561Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW32
12/09/2022121204561Open ↗
06/14/2022123457703Open ↗
▸Filing & Intake Forms21
▸BISADDITIONAL INFORMATION15
03/14/2022121204561Open ↗
03/14/2022121204561Open ↗
09/16/2021121204561Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING COVER SHEET5
04/23/2018123457703Open ↗
03/07/2018121204561Open ↗
03/07/2018121204561Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM1
03/24/2021121204561Open ↗
▸Other Documents5
▸BISMAINTENANCE INFORMATION1
12/09/2022121204561Open ↗
▸BISTCO - Supporting Documents1
01/13/2023121204561Open ↗
▸BISPLOT DIAGRAM1
04/11/2018121204561Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01103641-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01103641-I1Open ↗