← Back
Elevator apt, semi-fireproof with stores
1281 ST NICHOLAS AVENUE
MANHATTAN · BIN 1063535
💬 Discuss this project
1930Year Built
6Stories
D7Building Class
R7-2Zoning
59,442 sfGross Floor Area
55Units
LL97 CoveredRent Stabilized4 Open Violations ▸
Elevator apt, semi-fireproof with stores · Owner of record: NOKIT REALTY CORP. · 12,480 sf lot · 4.76 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Permit Issued — active, not yet Signed-off
Floor 613p · 1 filing · 7 docs
Floor 513p · 1 filing · 7 docs
Floor 413p · 1 filing · 7 docs
Floor 3Under Construction29p · 1 filing · 20 docs
Floor 2Under Construction27p · 3 filings · 20 docs
Floor 126p · 2 filings · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ORWELL MANAGEMENT4509/13/2026
NOKIT REALTY2403/22/2026
OWNER OF 601 W 174TH STRE103/22/2026
NOKIT INC.203/22/2026
TEKTONS REALTY INC.203/22/2026
TEKTON RLTYS INC.103/22/2026
ALCHEMY DEVELOPMENT SERVICES LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CONCEPT DESIGN GROUP1406/08/2026
TWIG NJ ENGINEERS1204/22/2026
WEST HUDSON ENGINEERING P.C.211/24/2025
JLS DESIGNS202/24/2025
CONAPAC SERVICES, DBA311/18/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONCEPT DESIGN GROUP603/21/2026
JLS DESIGNS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALCHEMY DEVELOPMENTGeneral Contractor1204/09/2026
J. CAIAZZO PLBG & HTG CORPlumbing607/08/2026
JAYLEX NYC CORPGeneral Contractor207/08/2026
PETER PANTELICElectrical103/21/2026
A&E ELECTRICAL SYSTEMS COElectrical103/22/2026
SIERRA, HERIBERTOElectrical103/21/2026
FINELLI, NICOLAElectrical103/21/2026
PANTELIC PETERElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CDG ARCHITECTS LLC /DBA:13272606/08/2026
Building Lifecycle
All (226)Filed (33)Permit Issued (15)Signed Off (10)Violation (60)Inspection (14)Objection (64)Special Inspection (30)
07/07/2026
Signed off — Alteration
Replacement of fixtures on existing roughing. No change to use, egress occupancy or bulk.
M01115238-I1
06/08/2026
Filed — Alteration
Replacement of fixtures on existing roughing. No change to use, egress occupancy or bulk.
M01115238-P3
06/02/2026
Signed off — Alteration
Repair and restoration of interior layout due to fire damage at existing 1st floor commercial units, replace storefront. No change in use egress or occupancy.
M01230107-S3
05/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
Yongho Kim
05/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
Yongho Kim
05/11/2026
Special inspection requirement — Maintenance information
Yongho Kim
05/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yongho Kim
05/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
Yongho Kim
05/11/2026
Special inspection requirement — Mechanical Systems
Yongho Kim
05/11/2026
Special inspection requirement — Final
Yongho Kim
05/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Yongho Kim
05/11/2026
Special inspection requirement — Shutoff dampers
Yongho Kim
05/06/2026
Violation issued (HPD, open)
C
05/06/2026
Violation issued (HPD, open)
C
05/06/2026
Violation issued (HPD, closed)
B
05/06/2026
Violation issued (HPD, closed)
B
05/05/2026
Signed off — Alteration
Interior renovation of apartment units 2C and 2D due to fire damage gut renovation.
M01252250-I1
04/22/2026
Filed — Alteration
Repair and restoration of interior layout due to fire damage at existing 1st floor commercial units, replace storefront. No change in use egress or occupancy.
M01230107-P7
04/22/2026
Signed off — Alteration
Repair and restoration of interior layout due to fire damage at existing 1st floor commercial units, replace storefront. No change in use egress or occupancy.
M01230107-S4
04/22/2026
Signed off — Alteration
Temporary wood construction fence
M01230908-I1
04/10/2026
Signed off — Alteration
Repair and restoration of interior layout due to fire damage at existing 1st floor commercial units, replace storefront. No change in use egress or occupancy.
M01230107-I1
04/09/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
Yongho Kim
04/08/2026
Special inspection requirement — Mechanical Systems
Yongho Kim
04/08/2026
Special inspection requirement — Tenant Protection Plan Compliance
Yongho Kim
04/08/2026
Special inspection requirement — Maintenance information
Yongho Kim
04/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
Yongho Kim
04/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Yongho Kim
04/08/2026
Special inspection requirement — Final
Yongho Kim
04/08/2026
Special inspection requirement — Shutoff dampers
Yongho Kim
04/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yongho Kim
04/06/2026
Signed off — Alteration
Repair and restoration of interior layout due to fire damage at existing 1st floor commercial units, replace storefront. No change in use egress or occupancy.
M01230107-S1
04/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
Yongho Kim
04/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Yongho Kim
04/06/2026
Special inspection requirement — Maintenance information
Yongho Kim
04/06/2026
Special inspection requirement — Final
Yongho Kim
04/06/2026
Special inspection requirement — Concrete - Cast-In-Place
Yongho Kim
04/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
Yongho Kim
04/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
Yongho Kim
04/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
Yongho Kim
04/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yongho Kim
04/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Yongho Kim
04/01/2026
Objection resolved — Addressed
03/31/2026
Objection resolved — Addressed
03/31/2026
Special inspection requirement — Tenant Protection Plan Compliance
Yongho Kim
03/26/2026
Objection raised — Cost
03/26/2026
Objection raised — Cost
03/23/2026
Permit issued — General Construction
M01115238-I1-GC
03/20/2026
Filed — Alteration
Repair and restoration of interior layout due to fire damage at existing 1st floor commercial units, replace storefront. No change in use egress or occupancy.
M01230107-P4
03/20/2026
Filed — Alteration
Repair and restoration of interior layout due to fire damage at existing 1st floor commercial units, replace storefront. No change in use egress or occupancy.
M01230107-P5
03/20/2026
Permit issued — General Construction
M01252250-I1-GC
03/20/2026
Permit issued — General Construction
M01230107-I1-GC
03/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/16/2026
Filed — Alteration
Repair and restoration of interior layout due to fire damage at existing 1st floor commercial units, replace storefront. No change in use egress or occupancy.
M01230107-P2
03/15/2026
Objection resolved — Addressed
03/15/2026
Objection resolved — Addressed
03/12/2026
Objection raised — Other
03/12/2026
Objection raised — Other
03/06/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/27/2026
Filed — Alteration
Replacement of fixtures on existing roughing. No change to use, egress occupancy or bulk.
M01115238-P2
Latest 60 of 226 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offALCHEMY DEVELOPMENT03/23/2026
DOB NOWGeneral ConstructionSigned-offALCHEMY DEVELOPMENT03/20/2026
DOB NOWGeneral ConstructionSigned-offALCHEMY DEVELOPMENT03/20/2026
DOB NOWPlumbingPermit IssuedJ. CAIAZZO PLBG & HTG COR12/19/2025
DOB NOWPlumbingPermit IssuedJ. CAIAZZO PLBG & HTG COR12/11/2025
DOB NOWMechanical SystemsSigned-offALCHEMY DEVELOPMENT10/02/2025
DOB NOWGeneral ConstructionSigned-offALCHEMY DEVELOPMENT09/17/2025
DOB NOWStructuralSigned-offALCHEMY DEVELOPMENT09/05/2025
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR08/29/2025
DOB NOWGeneral ConstructionSigned-offALCHEMY DEVELOPMENT08/11/2025
DOB NOWGeneral ConstructionSigned-offALCHEMY DEVELOPMENT08/11/2025
DOB NOWGeneral ConstructionSigned-offALCHEMY DEVELOPMENT06/17/2025
DOB NOWConstruction FenceSigned-offALCHEMY DEVELOPMENT06/06/2025
DOB NOWProtection and Mechanical MethodsSigned-offJAYLEX NYC11/12/2024
DOB NOWSidewalk ShedSigned-offJAYLEX NYC10/30/2024
BISEQISSUEDTIME CONTRACTING INC08/22/2016
BISEQISSUEDTIME CONTRACTING INC08/11/2016
BISOTISSUEDT P HOME CARE CORP10/26/2015
BISPLISSUEDTRISTATE PLBG SVCS CORP09/19/2014
BISPLISSUEDSAFETY PLMBG & HTG LLC08/05/2014
BISOTISSUEDFELIX REMODELING INC07/11/2014
BISOTISSUEDFELIX REMODELING INC06/20/2014
BISOTISSUEDFELIX REMODELING INC06/18/2014
BISBLISSUEDRICHARD MORTMAN04/30/2012
BISEQISSUEDSPRING ENTERPRIS INC.11/16/1998
BISFBISSUEDTHERMO TECH COMB INC11/23/1994
1 project · most recent 04/22/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/22/2026Signed-offALCHEMY DEVELOPMENTAir Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric PEFY-P06NMAU 6,000 BTU · Vrf Indoor ×12
MXZ-SM36NAM2 36,000 BTU · Condensing Unit ×13
MXZ-SM48NAM2 48,000 BTU · Condensing Unit ×5
PEFY-P36NMAU 36,000 BTU · Vrf Indoor ×4
PEFY-P48NMAU 48,000 BTU · Vrf Indoor ×4
PEFY-P24NMAU 24,000 BTU · Vrf Indoor ×2
PEFY-P24NMAU-E4 24,000 BTU · Vrf Indoor ×2
Ventilation
Greenheck SP-A70-QD 70 CFM · Exhaust Fan ×15
8 projects · most recent 06/08/2026
Water/Sanitary Gas
FiledStatusContractorScope
06/08/2026Permit IssuedJ. CAIAZZO PLBG & HTG CORGas, Water/Sanitary
04/22/2026Signed-offJ. CAIAZZO PLBG & HTG CORWater/Sanitary
01/24/2026——Gas, Water/Sanitary
01/24/2026——Gas, Water/Sanitary
01/24/2026——Gas, Water/Sanitary
01/13/2026——Gas, Water/Sanitary
01/07/2026Permit IssuedJ. CAIAZZO PLBG & HTG CORGas, Water/Sanitary
02/24/2025——Gas, Water/Sanitary
6 projects · most recent 11/25/2025
General Wiring
FiledStatusContractorScope
11/25/2025Permit IssuedTruephase Electrical ContractorsGeneral Wiring
09/22/2025Permit IssuedA&E ELECTRICAL SYSTEMS COGeneral Wiring
09/16/2025Permit IssuedBALANCE ELEC CONT'G CORP.54 meters, 54 new_meters
10/31/2024Permit IssuedHIGH QUALITY ELECTRIC OF—
12/27/2019Permit IssuedSALZMAN ELECTRIC CO., INCGeneral Wiring
03/13/2019CompleteBALANCE ELEC CONT'G CORP.1 meters, 1 new_meters
1 project · most recent 04/22/2026
Steel Concrete Wood
FiledStatusContractorScope
04/22/2026Signed-offALCHEMY DEVELOPMENTSteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
04/09/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/06/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/18/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/15/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/15/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/25/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/29/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/29/2024Certified Gas-Gas-Piping-UndergroundCertifiedView ↗
05/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/29/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 148
DateRequirementInspectorRole
05/11/2026Maintenance informationYongho Kimenergy_progress
05/11/2026HVAC-R and service water heating system controlsYongho Kimenergy_progress
05/11/2026HVAC-R and service water heating equipmentYongho Kimenergy_progress
05/11/2026Shutoff dampersYongho Kimenergy_progress
05/11/2026HVAC-R and service water piping design and insulationYongho Kimenergy_progress
05/11/2026FinalYongho Kimprogress
05/11/2026Tenant Protection Plan ComplianceYongho Kimspecial
05/11/2026Fire-Resistant Penetrations and JointsYongho Kimspecial
05/11/2026Mechanical SystemsYongho Kimspecial
04/08/2026Tenant Protection Plan ComplianceYongho Kimspecial
04/08/2026Mechanical SystemsYongho Kimspecial
04/08/2026Fire-Resistant Penetrations and JointsYongho Kimspecial
04/08/2026Shutoff dampersYongho Kimenergy_progress
04/08/2026HVAC-R and service water piping design and insulationYongho Kimenergy_progress
04/08/2026HVAC-R and service water heating equipmentYongho Kimenergy_progress
04/08/2026Maintenance informationYongho Kimenergy_progress
04/08/2026HVAC-R and service water heating system controlsYongho Kimenergy_progress
04/08/2026FinalYongho Kimprogress
04/06/2026HVAC-R and service water heating equipmentYongho Kimenergy_progress
04/06/2026HVAC-R and service water piping design and insulationYongho Kimenergy_progress
04/06/2026Energy Code Compliance InspectionsYongho Kimprogress
04/06/2026Tenant Protection Plan ComplianceYongho Kimspecial
04/06/2026Fire-Resistant Penetrations and JointsYongho Kimspecial
04/06/2026FinalYongho Kimprogress
04/06/2026HVAC-R and service water heating system controlsYongho Kimenergy_progress
Latest 25 of 148.
▾Documents — 267 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch33
08/25/2026M01128275-I1Request digital key ↗
08/25/2026M01128277-P1Request digital key ↗
08/25/2026M01128277-I1Request digital key ↗
Showing 3 of 33 on file for this type
▸Applications & Permits22
▸BISWORK PERMIT APPLICATION11
08/30/2016122859451Open ↗
08/16/2016122859460Open ↗
10/29/2015122444890Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION11
08/16/2016122859460Open ↗
08/16/2016122859451Open ↗
07/08/2015122444890Open ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications125
▸DOB NOWProgress Inspector Seal & Signature34
09/23/2026M01230107-S3Open ↗
09/23/2026M01230107-S3Open ↗
09/14/2026M01115238-P3Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature33
08/25/2026M01128277-I1Open ↗
08/23/2026M01230908-I1Open ↗
08/19/2026M01252250-I1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature32
09/23/2026M01230107-S3Open ↗
09/23/2026M01230107-S3Open ↗
09/14/2026M01115238-P3Open ↗
Showing 3 of 32 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
01/03/2018122859460Open ↗
01/03/2018122859451Open ↗
08/16/2016122859460Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
08/16/2016122859460Open ↗
08/16/2016122859460Open ↗
08/16/2016122859460Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
08/16/2016122859460Open ↗
08/16/2016122859451Open ↗
09/29/2014122138212Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/30/2012121021866Open ↗
▸BISApplicant / Owner Signature1
05/29/2014140190406Open ↗
▸Trade Schedules & Equipment12
▸BISSELF-CERT PLUMBING NOTICE6
02/11/2015122006426Open ↗
12/10/2014122138212Open ↗
11/11/2014122006426Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
11/06/2014122006426Open ↗
10/07/2014122138212Open ↗
09/25/2014122138212Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
03/30/2012121021866Open ↗
▸BISSCHEDULE B - PLUMBING1
10/13/2014122138212Open ↗
▸Environmental & Asbestos35
▸DOB NOWDEP ACP-5: Asbestos Assessment Report27
08/19/2026M01252250-I1Open ↗
08/17/2026M01230107-P7Open ↗
08/16/2026M01115238-P3Open ↗
Showing 3 of 27 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
09/11/2015122444890Open ↗
09/25/2014122138212Open ↗
06/05/2014122006426Open ↗
Showing 3 of 5 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
06/20/2014140190406Open ↗
05/29/2014140190406Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/30/2012121021866Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
04/01/2016122444890Open ↗
07/08/2015122444890Open ↗
03/31/2015122006426Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
04/01/2016122444890Open ↗
03/31/2015122006426Open ↗
▸BISTECHNICAL REPORT: ENERGY2
03/30/2012121021866Open ↗
03/30/2012121021866Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/04/2014140190406Open ↗
▸Approvals, Objections & Sign-offs9
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
01/03/2018122859460Open ↗
01/03/2018122859451Open ↗
04/01/2016122444890Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/20/2014140190406Open ↗
06/20/2014140190406Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
04/10/2012121021866Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT9
04/01/2016122444890Open ↗
07/08/2015122444890Open ↗
03/31/2015122006426Open ↗
Showing 3 of 9 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
06/24/2014122006426Open ↗
06/20/2014140190406Open ↗
▸Filing & Intake Forms11
▸BISEFILING COVER SHEET7
08/16/2016122859460Open ↗
08/16/2016122859451Open ↗
07/08/2015122444890Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM2
01/03/2018122859460Open ↗
01/03/2018122859451Open ↗
▸BISADDITIONAL INFORMATION1
05/29/2014140190406Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/29/2014140190406Open ↗