| Owner | Filings | Most Recent |
|---|---|---|
| RXR SL OWNERS | 2,400 | 09/24/2026 |
| RENNON CONSTRUCTION | 20 | 07/08/2026 |
| ULTRA GENERAL CONTRACTING INC | 9 | 07/08/2026 |
| OWNERS REP | 13 | 07/08/2026 |
| RXR SL OWNER LLC C O RXR PROP | 176 | 03/22/2026 |
| BK CONSTRUCTION SVCS | 1 | 03/22/2026 |
| SATO CONSTRUCTION | 2 | 03/22/2026 |
| CORE SCAFFOLD SYSTEMS | 3 | 03/22/2026 |
| DPC NY INC | 1 | 03/22/2026 |
| RXR CONSTRUCTION DEVELOPMENT | 2 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| BUILDING STUDIO ARCHITECTS | 74 | 09/16/2026 |
| E4P CONSULTING ENGINEERING PLLC | 2 | 09/15/2026 |
| COLLECTIF ENGINEERING PLLC | 1 | 07/15/2026 |
| MN ARCHITECTURE DPC | 1 | 07/13/2026 |
| WSP | 3 | 06/22/2026 |
| ANDREW FORMICHELLA | 4 | 05/11/2026 |
| LAURENCE G. JONES ARCHITECTS, PLLC | 53 | 04/20/2026 |
| ASDA ARCHITECTURE + DESIGN | 3 | 04/02/2026 |
| JAROS BAUM & BOLLES | 6 | 03/25/2026 |
| Populous | 2 | 03/25/2026 |
| SYNC ARCHITECTURE P.C | 10 | 02/11/2026 |
| KARBON ENGINEERING SERVICES, LLC | 1 | 11/26/2025 |
| ME ENGINEERS | 9 | 11/06/2025 |
| THE ROCK BROOK CONSULTING GROUP, PA | 20 | 10/17/2025 |
| MG ENGINEERING D.P.C. | 204 | 09/19/2025 |
| OLA CONSULTING ENGINEERS, PC | 11 | 08/25/2025 |
| STUDIOS ARCHITECTURE | 20 | 07/21/2025 |
| WELLWORTH CONSULTING LLC | 1 | 07/08/2025 |
| ENV ARCHITECTS, DPC | 3 | 06/25/2025 |
| RODNEY D. GIBBLE CONSULTING ENGINEE | 23 | 05/29/2025 |
| PAEP ARCHITECTURE ENGINEERING P.C. | 1 | 03/24/2025 |
| PROGRESSIVE ARCHITECTURE ENGINEERIN | 2 | 03/19/2025 |
| LUKE LICALZI, P.E., P.C. | 5 | 03/12/2025 |
| PINNACLE GROUP OF ENGINEERS | 1 | 01/03/2025 |
| HILLMAN & MILEY CONSULTING ENGINEER | 2 | 10/29/2024 |
| Representative | Filings | Most Recent |
|---|---|---|
| RIZZO GROUP | 471 | 03/21/2026 |
| BURNHAM NATIONWIDE INC | 41 | 03/21/2026 |
| UNITED SAFETY CONSULTANTS | 1 | 03/21/2026 |
| DVA Advisors | 14 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 4 | 03/21/2026 |
| WILLIAM VITACCO ASSOCIATES | 10 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 5 | 03/21/2026 |
| 4444 PPPP CORP | 2 | 03/21/2026 |
| CRUZ EXPERDITING | 1 | 03/21/2026 |
| RENNON CONSTRUCTION | 3 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| RXR CONSTRUCTION SERV LLC | General Contractor | 311 | 09/24/2026 |
| MJH ENERGY CONSULTING INC | Fire Protection | 44 | 07/29/2026 |
| MJH ENERGY CONSULTING INC | Plumbing | 27 | 07/17/2026 |
| ULTRA GENERAL CONTRACTING INC. | General Contractor | 25 | 07/08/2026 |
| MACCARONE PLUMBING INC | Plumbing | 18 | 07/08/2026 |
| MACCARONE PLUMBING INC | Fire Protection | 15 | 07/08/2026 |
| BALATON CONSULTING LLC | Scaffold | 11 | 07/08/2026 |
| CORE SCAFFOLD SYSTEMS INC. | General Contractor | 10 | 07/08/2026 |
| RENNON CONSTRUCTION CORP | General Contractor | 8 | 07/08/2026 |
| TRISTATE PLBG SVCS CORP | Fire Protection | 7 | 07/08/2026 |
| GRUSHINSKY PIPNG & HTG IN | Fire Protection | 6 | 07/08/2026 |
| HOLT CONSTRUCTION CORP | General Contractor | 5 | 07/08/2026 |
| DONATO PLUMBING, INC | Plumbing | 5 | 07/08/2026 |
| ICON INTERIORS INC | General Contractor | 4 | 07/08/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 4 | 07/08/2026 |
| HAWKINS WEBB, LLC | General Contractor | 4 | 07/08/2026 |
| ARENA EVENT SERVICES INC | General Contractor | 4 | 07/08/2026 |
| KG SPRINKLER CORP | Fire Protection | 4 | 07/08/2026 |
| ANDAMIO SCAFFOLDING LLC | General Contractor | 4 | 07/08/2026 |
| QUEST BUILDERS GROUP INC | General Contractor | 4 | 07/08/2026 |
| A & M WARSHAW PLBG & HTG | Plumbing | 4 | 07/08/2026 |
| DEMAR PLUMBING CORP | Fire Protection | 4 | 07/08/2026 |
| SPACIOUS LIVING GP LLC | General Contractor | 4 | 07/08/2026 |
| A&M WARSHAW SERVICES LLC | Fire Protection | 3 | 07/08/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 3 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| HT ENGINEERING, PLLC | 6274 | 2 | 09/15/2026 |
| ALAN MARGOLIN & ASSOC | 423 | 13 | 07/15/2026 |
| CONSULTING AND TESTING SE | 6152 | 256 | 06/22/2026 |
| CODEGREEN | 510 | 20 | 04/24/2026 |
| CROSSCHECK INSPECTION SER | 544 | 4 | 10/22/2024 |
| AK CONSULTING SERVICES, I | 6198 | 2 | 09/30/2024 |
| RYAN SPECIAL ENGINEERING | 2018 | 2 | 05/20/2024 |
| W. ALLEN ENGINEERING PLLC | 664 | 1 | 04/29/2024 |
| J STONE ACQUISITIONS LLC | 8153 | 1 | 07/20/2023 |
| SPECIAL INSPECTION SERVIC | 1200 | 7 | 04/26/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Mechanical Systems | Permit Issued | RXR CONSTRUCTION SERV LLC | 09/23/2026 |
| DOB NOW | General Construction | Permit Issued | RXR CONSTRUCTION SERV LLC | 09/23/2026 |
| DOB NOW | Sprinklers | Permit Issued | MJH ENERGY CONSULTING INC | 07/28/2026 |
| DOB NOW | Plumbing | Permit Issued | MJH ENERGY CONSULTING INC | 07/16/2026 |
| DOB NOW | General Construction | Permit Issued | PHASE 3 INTERIORS LLC | 07/16/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | RXR CONSTRUCTION SERV LLC | 06/26/2026 |
| DOB NOW | General Construction | Permit Issued | RXR CONSTRUCTION SERV LLC | 06/25/2026 |
| DOB NOW | General Construction | Permit Issued | RXR CONSTRUCTION SERV LLC | 05/01/2026 |
| DOB NOW | Plumbing | Permit Issued | MJH ENERGY CONSULTING INC | 04/29/2026 |
| DOB NOW | Sprinklers | Permit Issued | MJH ENERGY CONSULTING INC | 04/29/2026 |
| DOB NOW | Supported Scaffold | Signed-off | RENNON CONSTRUCTION CORP | 04/22/2026 |
| DOB NOW | General Construction | Permit Issued | RXR CONSTRUCTION SERV LLC | 04/08/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | RXR CONSTRUCTION SERV LLC | 04/08/2026 |
| DOB NOW | Sign | Permit Issued | SERVICE SIGN ERECTORS CO | 04/07/2026 |
| DOB NOW | Sign | Permit Issued | SERVICE SIGN ERECTORS CO | 04/07/2026 |
| DOB NOW | Sign | Permit Issued | SERVICE SIGN ERECTORS CO | 04/07/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | STRUCTURAL PRESERVATION S | 04/06/2026 |
| DOB NOW | General Construction | Permit Issued | RXR CONSTRUCTION SERV LLC | 03/27/2026 |
| DOB NOW | Sprinklers | Signed-off | MJH ENERGY CONSULTING INC | 03/12/2026 |
| DOB NOW | General Construction | Signed-off | WINICK PRODUCTIONS, LLC | 02/17/2026 |
| DOB NOW | Plumbing | Signed-off | MJH ENERGY CONSULTING INC | 01/28/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | CORE SCAFFOLD SYSTEMS INC | 01/27/2026 |
| DOB NOW | Plumbing | Signed-off | MACCARONE PLUMBING INC | 01/02/2026 |
| DOB NOW | General Construction | Permit Issued | RXR CONSTRUCTION SERV LLC | 12/11/2025 |
| DOB NOW | General Construction | Permit Issued | RXR CONSTRUCTION SERV LLC | 12/10/2025 |
| DOB NOW | Plumbing | Permit Issued | DONATO PLUMBING, INC | 12/04/2025 |
| DOB NOW | Plumbing | Signed-off | MJH ENERGY CONSULTING INC | 11/20/2025 |
| DOB NOW | General Construction | Permit Issued | RXR CONSTRUCTION SERV LLC | 11/14/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | RXR CONSTRUCTION SERV LLC | 11/14/2025 |
| DOB NOW | Sprinklers | Permit Issued | SIRINA FIRE PROT CORP | 11/07/2025 |
| DOB NOW | Standpipe | Signed-off | MJH ENERGY CONSULTING INC | 09/05/2025 |
| DOB NOW | Sprinklers | Signed-off | MJH ENERGY CONSULTING INC | 09/04/2025 |
| DOB NOW | Sprinklers | Permit Issued | MJH ENERGY CONSULTING INC | 09/04/2025 |
| DOB NOW | Sprinklers | Signed-off | MJH ENERGY CONSULTING INC | 09/04/2025 |
| DOB NOW | Sprinklers | Signed-off | MJH ENERGY CONSULTING INC | 09/04/2025 |
| DOB NOW | Sprinklers | Permit Issued | MJH ENERGY CONSULTING INC | 09/04/2025 |
| DOB NOW | Sprinklers | Signed-off | MJH ENERGY CONSULTING INC | 09/04/2025 |
| DOB NOW | Sign | Permit Issued | NORTH SHORE NEON SIGN CO | 09/03/2025 |
| DOB NOW | Sign | Permit Issued | NORTH SHORE NEON SIGN CO | 09/03/2025 |
| DOB NOW | Sign | Permit Issued | NORTH SHORE NEON SIGN CO | 09/03/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 09/15/2026 | Permit Issued | UPSTRATE INC | Heating and Air Conditioning Systems | — |
| 06/22/2026 | Permit Issued | RXR CONSTRUCTION SERV LLC | Heating and Air Conditioning Systems | Heat / Cool Bosch EC096 3,000 CFM · Condensing Unit ×1 |
| 03/24/2026 | Permit Issued | RXR CONSTRUCTION SERV LLC | Air Conditioning Systems | — |
| 08/01/2024 | Permit Issued | RXR CONSTRUCTION SERV LLC | Air Conditioning Systems | Cooling Compu-Aire HKW-024S 28,000 BTU · Wshp ×1 Florida Heat Pump LV070 72,000 BTU · Wshp ×1 |
| 07/25/2024 | Permit Issued | RXR CONSTRUCTION SERV LLC | Air Conditioning Systems | Cooling Mitsubishi Electric PKA-A36/PUZ-A36 3 tons · Split System ×2 |
| 04/12/2024 | Permit Issued | RXR CONSTRUCTION SERV LLC | Heating and Air Conditioning Systems | Heat / Cool Daikin WGCH-060 5 tons · Wshp ×2 |
| 12/21/2023 | Permit Issued | RXR CONSTRUCTION SERV LLC | Ventilation Systems | Ventilation Greenheck BSQ-180 3,000 CFM · Exhaust Fan ×2 DS-3-10 43,500 CFM · Exhaust Fan ×2 BSQ-240HP 5,400 CFM · Exhaust Fan ×1 SQ-97-VG 300 CFM · Exhaust Fan ×1 Brasch BTUR-240 10 kW · Unit Heater ×3 Neptronic DF C100H 25 kW · Ductwork ×1 Poweredaire ETD-1-36E 2,900 CFM · Air Curtain ×1 Stelpro SCA6038 512 BTU · Radiant ×1 __Junk__ Maxidrive DF-01A-112 700 CFM · Exhaust Fan ×1 |
| 12/08/2023 | Permit Issued | RXR CONSTRUCTION SERV LLC | Air Conditioning Systems, Ventilation Systems | Cooling Florida Heat Pump EC120-HORIZONTAL 125,000 BTU · Packaged Unit ×2 Liebert ZR18K5E-60HZ 22,000 BTU · Packaged Unit ×1 Ventilation — SQ-140-VG 1,500 CFM · Exhaust Fan ×2 |
| 12/06/2023 | — | — | Air Conditioning Systems | Cooling Daikin ×3 |
| 01/14/2023 | Permit Issued | ULTRA GENERAL CONTRACTING | Air Conditioning Systems | Cooling Florida Heat Pump EC180-3HZC-SLS 172,000 BTU · Wshp ×1 |
| 08/04/2021 | Permit Issued | RXR CONSTRUCTION SERV LLC | Air Conditioning Systems, Generators | Cooling Bosch LV036-1HZC 3 tons · Heat Pump Outdoor ×1 Florida Heat Pump EC070-4HZC 3 tons · Wshp ×1 Generators Kohler KD3250-4 3,250 kW · Generator ×1 |
| 05/07/2021 | Permit Issued | RXR CONSTRUCTION& DEV LLC | Air Conditioning Systems | Cooling |
| 08/20/2020 | Permit Issued | RXR CONSTRUCTION& DEV LLC | Ventilation Systems | — |
| 03/09/2020 | Permit Issued | JRM CONSTRUCTION MGMT LLC | Air Conditioning Systems | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/15/2026 | — | — | Sprinkler System |
| 06/22/2026 | Permit Issued | MJH ENERGY CONSULTING INC | 32 heads |
| 03/25/2026 | Permit Issued | MJH ENERGY CONSULTING INC | 69 heads |
| 11/26/2025 | — | — | 546 heads |
| 06/25/2025 | Permit Issued | KG SPRINKLER CORP | 198 heads |
| 10/16/2024 | Permit Issued | SIRINA FIRE PROT CORP | 78 heads |
| 03/29/2024 | — | — | 12 heads |
| 12/21/2023 | Permit Issued | MJH ENERGY CONSULTING INC | 194 heads |
| 12/11/2023 | Signed-off | MJH ENERGY CONSULTING INC | — |
| 12/06/2023 | — | — | 17 heads |
| 11/30/2023 | Permit Issued | MJH ENERGY CONSULTING INC | — |
| 11/14/2023 | Permit Issued | MJH ENERGY CONSULTING INC | 12 heads |
| 10/26/2023 | Permit Issued | DEMAR PLUMBING CORP | 69 heads |
| 01/14/2023 | Permit Issued | WELKIN FIRE PROTECTION LL | — |
| 07/12/2022 | Permit Issued | DEMAR PLUMBING CORP | 74 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/22/2026 | Permit Issued | MJH ENERGY CONSULTING INC | Water/Sanitary |
| 03/25/2026 | — | — | — |
| 03/24/2026 | Permit Issued | MJH ENERGY CONSULTING INC | Water/Sanitary |
| 11/06/2025 | Signed-off | MJH ENERGY CONSULTING INC | Water/Sanitary |
| 08/25/2025 | Permit Issued | A & M WARSHAW PLBG & HTG | Water/Sanitary |
| 08/05/2025 | — | — | Water/Sanitary |
| 06/25/2025 | Signed-off | DONATO PLUMBING, INC | Water/Sanitary |
| 06/25/2025 | — | — | — |
| 08/01/2024 | — | — | Water/Sanitary |
| 07/26/2024 | Permit Issued | A&A PLUMBING CORP | Water/Sanitary |
| 07/25/2024 | Permit Issued | A & M WARSHAW PLBG & HTG | Water/Sanitary |
| 04/12/2024 | Permit Issued | DONATO PLUMBING, INC | Water/Sanitary |
| 12/06/2023 | — | — | — |
| 12/06/2023 | — | — | Water/Sanitary |
| 11/30/2023 | Permit Issued | MJH ENERGY CONSULTING INC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/06/2026 | Complete | STANCO SYSTEM ELEC'L CONT | General Wiring |
| 06/30/2026 | Permit Issued | TRANSFORM ELECTL CONTRS I | General Wiring |
| 06/30/2026 | Permit Issued | TRANSFORM ELECTL CONTRS I | General Wiring |
| 05/06/2025 | Complete | LION ELECTRIC INC | General Wiring |
| 01/15/2025 | Permit Issued | CAVAN ELECTRIC CORP. | General Wiring |
| 12/13/2024 | Permit Issued | TRANSFORM ELECTL CONTRS I | General Wiring |
| 11/15/2024 | Complete | NOVA ELECTRIC LLC | General Wiring |
| 11/14/2024 | Complete | LIPPOLIS ELECTRIC, INC. | General Wiring |
| 08/30/2024 | Complete | 5 J'S ELECTL CONTS CORP | — |
| 08/12/2024 | Permit Issued | AMERGY ELECTRIC OF NY INC | General Wiring |
| 08/12/2024 | Permit Issued | AMERGY ELECTRIC OF NY INC | General Wiring |
| 08/12/2024 | Permit Issued | AMERGY ELECTRIC OF NY INC | General Wiring |
| 08/06/2024 | Complete | ALBA ELECTRIC CORP | General Wiring |
| 05/24/2024 | Permit Issued | TEAM ELECTRIC, INC | General Wiring |
| 04/08/2024 | Permit Issued | MATROS AUTOMATED ELEC'L C | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/24/2026 | Permit Issued | RXR CONSTRUCTION SERV LLC | 1 scope_items |
| 05/29/2025 | Permit Issued | RXR CONSTRUCTION SERV LLC | Steel, Concrete |
| 08/01/2024 | — | — | Steel, Concrete |
| 05/15/2024 | Permit Issued | STEELDECK NY INC | 1 scope_items |
| 04/12/2024 | — | — | Concrete |
| 09/15/2023 | Permit Issued | RXR CONSTRUCTION SERV LLC | Steel |
| 03/08/2021 | Signed-off | RXR CONSTRUCTION & DEVELO | Steel |
| 07/14/2020 | Permit Issued | RXR CONSTRUCTION& DEV LLC | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/18/2024 | Permit Issued | CORE SCAFFOLD SYSTEMS INC | Sidewalk Shed |
| 08/22/2022 | Signed-off | RENNON CONSTRUCTION CORP | Scaffold |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/19/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 08/10/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/06/2026 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 07/13/2026 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 07/13/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 06/24/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/18/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/17/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/22/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/22/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/14/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/24/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/24/2026 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 03/18/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/13/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 03/13/2026 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 03/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/12/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/12/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/10/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/27/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/27/2026 | Certified Storm Drainage-ST-Fixtures-Finish | Certified | View ↗ |
| 02/27/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/20/2026 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 02/20/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 06/15/2026 | Sprayed fire-resistant materials | DANIEL CREIGHTON | special |
| 06/15/2026 | Fire-Resistance Rated Construction | DANIEL CREIGHTON | progress |
| 06/10/2026 | Post-installed Anchors | DANIEL CREIGHTON | special |
| 06/03/2026 | Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable) | Young Suh | special |
| 05/19/2026 | Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable) | HENRY TORRES | special |
| 05/19/2026 | Lowest Floor Elevation | — | progress |
| 05/19/2026 | Mechanical Systems | HENRY TORRES | special |
| 05/19/2026 | Final | HENRY TORRES | progress |
| 05/19/2026 | Fire-Resistant Penetrations and Joints | DANIEL CREIGHTON | special |
| 05/19/2026 | Sprinkler Systems | DANIEL CREIGHTON | special |
| 05/14/2026 | Final | DANIEL CREIGHTON | progress |
| 05/14/2026 | Fire-Resistant Penetrations and Joints | DANIEL CREIGHTON | special |
| 04/29/2026 | Final | Steven Harper | progress |
| 04/24/2026 | Structural Stability – Alterations of existing buildings | James Sullivan Jr | special |
| 04/24/2026 | Fenestration and door U-factor and product ratings | James Sullivan Jr | energy_progress |
| 04/24/2026 | Mastic and Intumescent Fire-resistant Coatings | James Sullivan Jr | special |
| 04/24/2026 | Air barrier - visual inspection | James Sullivan Jr | energy_progress |
| 03/28/2026 | Final | Alfonso DElia | progress |
| 03/28/2026 | Final | Alfonso DElia | progress |
| 03/13/2026 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| 03/13/2026 | Fire-Resistance Rated Construction | HATIM ELSAID | progress |
| 03/11/2026 | Post-installed Anchors | HATIM ELSAID | special |
| 03/11/2026 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| 03/11/2026 | Sprinkler Systems | HATIM ELSAID | special |
| 03/06/2026 | Mechanical Systems | HATIM ELSAID | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Louis Vuitton | Restaurant / Food Service | Floor 18 | Project M01399473 |
| Sva Gallery | Education | Floor 15 | Project M01335118 |
| Lumen | Office | Floor 6 | Project M01313649 Project M00841902 Project M00841930 Project M00841936 |
| Fusion Academy | Education | Mezzanine | Project M01134796 Project M01134940 |
| W27 Exhibitions | Other | Ground, Floor 1 | Project M01192871 Project M01151531 Project M01096106 Project M01077215 |
| Fashionphile | Retail | Floor 4 | Project M01082581 Project M00599207 |
| Ralph Lauren | Office | Mezzanine | Project M01066888 Project M00328321 |
| Lutece Collective | Retail | Floor 14 | Project M01029523 |
| 1-54 Contemporary Art Fair | Other | Ground | Project M00989219 |
| West Side Kollel | Other | Floor 17 | Project M01024999 |
| IMG Focus | Office | Floor 18 | Project M00998030 |
| Club Pilates | Fitness / Recreation | Floor 1 | Project M00941759 |
| Windstream Generator | Office | Floor 4 | Project M00950445 |
| Canoe Studios | Office | Floor 14 | Project M00871822 |
| Starrett-Lehigh Fitness Center | Fitness / Recreation | Mezzanine | Project M08041126 |
| Marcus Samuelsson Group | Restaurant / Food Service | Floor 1 | Project M08011133 Project M00757283 Project M00645168 |
| Ameelio | Office | — | Project M00728095 |
| Lehmann Maupin | Office | Floor 12 | Project M00700310 |
| Schoolof Visual Arts | Education | Floor 15 | Project M00720442 |
| New Hope Fertility Center | Medical / Healthcare | Floor 16 | Project M00358162 |
| Wheels Up Partners | Office | Floor 9 | Project M00343449 |
| Nike Marathon Activations | Other | Ground | Project M00244766 |