← Back
BuildNYC
Elevator apt, fireproof with stores
The Helena
601 WEST 57TH STREET · Name © OpenStreetMap contributors · BIN 1081009
💬 Discuss this project
2003Year Built
38Stories
D6Building Class
C4-7Zoning
547,239 sfGross Floor Area
601Units
LL97 CoveredRent Stabilized2 Active Violations 0 unresolved · 2 paperwork only ▸FISP: SAFE
Elevator apt, fireproof with stores · Owner of record: FPC 57 North · 25,105 sf lot · 21.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsRoyal Realty CORP.1 filing
RoofHelena 57 West3 filings · 20 docs
PenthouseUnit PH, Unit PH11 filing · 7 docs
Floor 8Marketing floor 97p · 4 filings · 4 docs
Floor 7Marketing floor 88p · 4 filings · 4 docs
Floor 6Helena 578p · 3 filings · 4 docs
Floor 5Club Pilates1 filing · 4 docs
Floor 4Helena, Club Pilates, Marketing floor 55 filings · 5 docs
Floor 3Club Pilates1 filing · 4 docs
Floor 2Club Pilates1 filing · 4 docs
Floor 1Club Pilates3p · 5 filings · 20 docs
CellarSecondary beams installation5p · 2 filings · 9 docs
Sub-CellarSecondary beams installation2p · 1 filing · 9 docs
Filed — no permit issuedRooftop bulkhead work1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
The Helena Associates16103/21/2026
The Durst Organization7009/12/2026
Durst Partners1003/21/2026
Royal Realty407/08/2026
FPC 57 North103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
C. Delargy Architect103/05/2026
A. Danza Consulting102/14/2024
Sullivan202/01/2024
Piro Studio109/26/2023
MG Engineering603/20/2023
Env Architects201/12/2023
Severud Associates212/09/2022
Me Engineers1210/04/2022
Parmet Engineering106/26/2019
Jose L. Pena, P.E103/22/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J.A.M. Associates3203/21/2026
Rimkus New York603/21/2026
DI Dio Architecture203/21/2026
Codegreen403/21/2026
Conapac Services Dba103/21/2026
Louis Striar203/21/2026
Conapac Services103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Icon InteriorsGeneral Contractor507/08/2026
New Roc ContractingScaffold403/21/2026
KMF ConstructionGeneral Contractor307/08/2026
The Sci ConstructionGeneral Contractor307/08/2026
Cross ManagementGeneral Contractor307/08/2026
Ranger PlumbingElectrical203/21/2026
Yaffie ElectricElectrical203/21/2026
Cagney Brenner & BrennerElectrical203/21/2026
Graham CleggElectrical203/21/2026
James NicolazziElectrical203/21/2026
Myrto Plumbing & HVACElectrical203/21/2026
Rockmor Electric EnterprisesElectrical103/21/2026
Primebuild SolutionsGeneral Contractor109/12/2026
Nyco ElectricElectrical103/21/2026
Five Borough ElectricElectrical103/22/2026
Z-Car-DSign hanger107/08/2026
Jam Service CoFire Protection107/08/2026
Par Fire ProtectionFire Protection107/08/2026
Par Plumbing CoPlumbing107/08/2026
Sirina Fire ProtectionFire Protection107/08/2026
Tristate Plumbing ServicesPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ryan Special Engineering2018103/05/2026
Project Tactical Solution58591002/14/2024
Piro Studio7503109/26/2023
Codegreen510603/20/2023
Skyline Engineering267312/09/2022
Building Lifecycle
All (181)Filed (30)Permit Issued (19)Signed Off (17)Facade (FISP) (9)Violation (60)Inspection (7)Objection (9)Special Inspection (30)
10/02/2026
Signed off — Alteration
Install 3 telescoping partial-height sliding glass panels w/ floor track, metal post & header in existing living room alcove. Panels do not create separate room: permanent opening above, shared HVAC/light/ventilation. No structural modifications.
M01366148-I1
09/10/2026
Permit issued — General Construction
M01366148-I1-GC
05/14/2026
Violation issued (ECB, closed)
Elevators
04/18/2026
Filed — Alteration
IRA to assist with Condition Assessment
M01389446-I1
03/26/2026
Objection raised — Other
03/05/2026
Filed — Alteration
Install 3 telescoping partial-height sliding glass panels w/ floor track, metal post & header in existing living room alcove. Panels do not create separate room: permanent opening above, shared HVAC/light/ventilation. No structural modifications.
M01366148-I1
03/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/02/2026
Special inspection requirement — Final
07/08/2025
Violation issued (HPD, closed)
B
06/13/2025
Violation issued (HPD, closed)
A
08/20/2024
Signed off — Alteration
Installation of emergency & temporary shoring and related structural work as necessary at sub-cellar level. All work as per plans submitted. No change in use, occupancy or egress under this application.
M00911857-S1
08/19/2024
Signed off — Alteration
Installation of emergency & temporary shoring and related structural work as necessary at sub-cellar level. All work as per plans submitted. No change in use, occupancy or egress under this application.
M00911857-I1
08/05/2024
Permit issued — Structural
M00911857-S1-ST
02/14/2024
Filed — Alteration
Installation of emergency & temporary shoring and related structural work as necessary at sub-cellar level. All work as per plans submitted. No change in use, occupancy or egress under this application.
M00911857-S1
02/02/2024
Signed off — Alteration
HP replacement in all apartments
M00718279-I1
02/01/2024
Filed — Alteration
Installation of emergency & temporary shoring and related structural work as necessary at sub-cellar level. All work as per plans submitted. No change in use, occupancy or egress under this application.
M00911857-P1
01/31/2024
Signed off — Alteration
M08029881-I1
01/25/2024
Special inspection requirement — Tenant Protection Plan Compliance
01/25/2024
Special inspection requirement — Final
Max Lee
01/25/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Max Lee
01/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Max Lee
01/22/2024
Signed off — Alteration
M08029893-I1
10/26/2023
Signed off — Alteration
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 4TH FLOOR (5TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00675761-I1
10/25/2023
Signed off — Alteration
PLUMBING MODIFICATIONS TAKING PLACE ON THE 4TH FLOOR (5TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00695158-I1
10/19/2023
Violation issued (HPD, closed)
B
10/05/2023
Permit issued — General Construction
M00911857-I1-GC
09/26/2023
Filed — Alteration
M00912414-I1
09/13/2023
Filed — Alteration
Installation of emergency & temporary shoring and related structural work as necessary at sub-cellar level. All work as per plans submitted. No change in use, occupancy or egress under this application.
M00911857-I1
07/17/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/24/2023
Violation issued (HPD, closed)
C
05/24/2023
Violation issued (HPD, closed)
C
05/24/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/19/2023
Permit issued — Plumbing
M00695158-I1-PL
05/19/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/15/2023
Signed off — Alteration
Modification of Standpipe in the cellar, ground floor & roof for test header
M00767402-I1
05/11/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/11/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/11/2023
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
05/08/2023
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
04/20/2023
Signed off — Alteration
M00675752-I1
04/20/2023
Signed off — Alteration
M00675764-I1
03/23/2023
Permit issued — Mechanical Systems
M00718279-I1-MS
03/20/2023
Filed — Alteration
Modification of Standpipe in the cellar, ground floor & roof for test header
M00767402-P1
03/20/2023
Special inspection requirement — Post-installed Anchors
HATIM ELSAID
03/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
HATIM ELSAID
03/20/2023
Special inspection requirement — Standpipe Systems
HATIM ELSAID
02/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
HATIM ELSAID
02/21/2023
Special inspection requirement — Standpipe Systems
HATIM ELSAID
02/21/2023
Special inspection requirement — Post-installed Anchors
HATIM ELSAID
02/10/2023
Permit issued — Sprinklers
M00675761-I1-EW-SP
02/03/2023
Permit issued — Mechanical Systems
M00675752-I1-MS
01/18/2023
Permit issued — General Construction
M00675764-I1-GC
01/17/2023
Filed — Alteration
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 4TH FLOOR (5TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00675761-I1
01/17/2023
Filed — Alteration
PLUMBING MODIFICATIONS TAKING PLACE ON THE 4TH FLOOR (5TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00695158-I1
01/17/2023
Filed — Alteration
M00675752-I1
01/12/2023
Filed — Alteration
M00675764-I1
01/12/2023
Special inspection requirement — Tenant Protection Plan Compliance
HATIM ELSAID
01/11/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
HATIM ELSAID
01/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
HATIM ELSAID
01/03/2023
Special inspection requirement — Tenant Protection Plan Compliance
HATIM ELSAID
Latest 60 of 181 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offPrimebuild Solutions09/10/2026
DOB NOWStructuralSigned-offKMF Construction08/05/2024
DOB NOWGeneral ConstructionSigned-offKMF Construction10/05/2023
DOB NOWPlumbingSigned-offPar Plumbing Co05/19/2023
DOB NOWMechanical SystemsSigned-offThe Sci Construction03/23/2023
DOB NOWSprinklersSigned-offLawrence J. Levine02/10/2023
DOB NOWMechanical SystemsSigned-offCross Management02/03/2023
DOB NOWGeneral ConstructionSigned-offCross Management01/18/2023
DOB NOWStructuralSigned-offThe Sci Construction12/21/2022
DOB NOWGeneral ConstructionSigned-offThe Sci Construction12/21/2022
DOB NOWStandpipeSigned-offJam Service Co10/19/2022
DOB NOWMechanical SystemsSigned-offIcon Interiors06/28/2021
DOB NOWStructuralSigned-offIcon Interiors05/12/2021
DOB NOWPlumbingSigned-offTristate Plumbing Services04/15/2021
DOB NOWMechanical SystemsSigned-offIcon Interiors04/10/2021
DOB NOWSprinklersSigned-offSirina Fire Protection03/24/2021
DOB NOWSidewalk ShedSigned-offNew Roc Contracting07/26/2019
DOB NOWSupported ScaffoldSigned-offNew Roc Contracting06/26/2019
DOB NOWSignSigned-offZ-Car-D03/25/2019
BISSPISSUEDPace Plumbing09/03/2024
BIS—ISSUEDClub Pilates @ Helena07/17/2024
BISOTISSUEDIcon Interiors06/23/2022
BIS—ISSUEDIcon Interiors06/23/2022
BISPLISSUEDPace Plumbing12/22/2021
BIS—ISSUEDIcon Interiors07/05/2021
BISOTISSUEDIcon Interiors06/24/2021
BISOTISSUEDIcon Interiors02/04/2021
BISOTISSUEDHawkins Webb04/20/2020
BISMHISSUEDHawkins Webb04/20/2020
BISSPISSUEDAccurate Mechanical05/24/2019
BISPLISSUEDAccurate Mechanical05/03/2019
BISMHISSUEDHawkins Webb05/01/2019
BISPLISSUEDPace Plumbing04/15/2019
BIS—ISSUEDHunter Roberts Construction03/20/2019
BISEQISSUEDHunter Roberts Construction03/20/2019
BISOTISSUEDHunter Roberts Construction03/11/2019
BISPLISSUEDPace Plumbing01/19/2018
BISPLISSUEDTop Dog Plumbing & Heating12/29/2017
BISSPISSUEDBruche Mechanical NY12/19/2017
BISEQISSUEDHunter Roberts Construction12/18/2017
+ 29 more permits on file
9 projects · most recent 09/19/2025
General Wiring
FiledStatusContractorScope
09/19/2025CompleteNyco Electric1 meters, 1 new_meters
02/03/2025CompleteRockmor Electric EnterprisesGeneral Wiring
11/28/2023CompleteUnited Electric & Lighting CoGeneral Wiring
09/06/2023CompleteEmpire State Electric MaintenanceGeneral Wiring
10/25/2021CompleteUnited Electric & Lighting CoGeneral Wiring
06/16/2021CompleteRobert Chimenti7 meters, 1 new_meters
02/18/2020CompleteFive Borough ElectricGeneral Wiring
08/20/2019CompleteRainbow Electric Co—
06/27/2019CompleteG.M. Electrical ContractingGeneral Wiring
1 project · most recent 04/18/2026
FiledStatusContractorScope
04/18/2026———
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/17/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/19/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/11/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/11/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/11/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
05/08/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
03/05/2026Tenant Protection Plan Compliance—special
03/02/2026Final—progress
01/25/2024Tenant Protection Plan Compliance—special
01/25/2024FinalMax Leeprogress
01/25/2024Structural Stability – Alterations of existing buildingsMax Leespecial
01/25/2024Fire-Resistant Penetrations and JointsMax Leespecial
03/20/2023Post-installed AnchorsHATIM ELSAIDspecial
03/20/2023Fire-Resistant Penetrations and JointsHATIM ELSAIDspecial
03/20/2023Standpipe SystemsHATIM ELSAIDspecial
02/21/2023Fire-Resistant Penetrations and JointsHATIM ELSAIDspecial
02/21/2023Standpipe SystemsHATIM ELSAIDspecial
02/21/2023Post-installed AnchorsHATIM ELSAIDspecial
01/12/2023Tenant Protection Plan ComplianceHATIM ELSAIDspecial
01/11/2023HVAC-R and service water piping design and insulationHATIM ELSAIDenergy_progress
01/11/2023Fire-Resistant Penetrations and JointsHATIM ELSAIDspecial
01/03/2023Tenant Protection Plan ComplianceHATIM ELSAIDspecial
01/03/2023Tenant Protection Plan ComplianceHATIM ELSAIDspecial
11/18/2022Tenant Protection Plan ComplianceMatthew Wavrospecial
10/28/2022FinalAdam Snyderprogress
10/12/2022HVAC-R and service water piping design and insulationMax Leeenergy_progress
10/12/2022Mechanical SystemsMax Leespecial
10/12/2022Energy Code Compliance InspectionsMax Leeprogress
10/12/2022FinalMax Leeprogress
10/12/2022HVAC-R and service water heating system controlsMax Leeenergy_progress
10/12/2022HVAC-R and service water heating equipmentMax Leeenergy_progress
Latest 25 of 47.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
HelenaOfficeFloor 4
Project M00675752 Alteration · LOC Issued · 01/17/2023
Project M00675761 Alteration · LOC Issued · 01/17/2023
Project M00695158 Alteration · LOC Issued · 01/17/2023
Helena 57 WestResidentialRoof
Project M08029893 Alteration · LOC Issued · 12/09/2022
Project M08029881 Alteration · LOC Issued · 12/08/2022
Club PilatesFitness / RecreationFloors 1–5
Project M00138955 Alteration · LOC Issued · 03/22/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 890 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch20
09/04/2026M00480995-I1Request digital key ↗
09/03/2026M00481001-P3Request digital key ↗
09/03/2026M00481001-P4Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/04/2026M00440482-P1Request digital key ↗
09/04/2026M00440482-I1Request digital key ↗
09/04/2026M00440482-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00175150-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00175150-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00440471-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/05/2026M00138955-I1Request digital key ↗
▸Applications & Permits153
▸BISPLAN / WORK APPROVAL APPLICATION83
07/22/2025140993977Open ↗
07/30/2024140279570Open ↗
06/20/2024124040368Open ↗
Showing 3 of 83 on file for this type
▸BISWORK PERMIT APPLICATION62
09/03/2024140279570Open ↗
07/17/2024124040368Open ↗
07/05/2021140993977Open ↗
Showing 3 of 62 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit4
08/18/2026M01366148-I1Open ↗
08/13/2026M00911857-P1Open ↗
08/13/2026M00480609-P1Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
07/31/2024124040368Open ↗
07/19/2021140993977Open ↗
▸BISPLACE OF ASSEMBLY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications185
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION77
02/26/2020123730187Open ↗
05/21/2019123730187Open ↗
05/20/2019123730187Open ↗
Showing 3 of 77 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature26
09/05/2026M00138955-I1Open ↗
09/04/2026M00440471-I1Open ↗
09/04/2026M00440482-I1Open ↗
Showing 3 of 26 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT21
01/11/2021140990998Open ↗
Showing 1 of 21 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/23/2026M00675764-I1Open ↗
08/29/2026M00911857-P1Open ↗
08/27/2026M00675752-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/27/2026M00440482-I1Open ↗
09/23/2026M00767402-P1Open ↗
09/23/2026M00675764-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
01/11/2021140990998Open ↗
Showing 1 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
01/11/2021140990998Open ↗
Showing 1 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
02/11/2021140993977Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment39
▸BISSCHEDULE B - PLUMBING9
03/19/2019140279570Open ↗
01/23/2019121191977Open ↗
Showing 2 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
05/08/2019123730187Open ↗
03/21/2019123730187Open ↗
Showing 2 of 8 on file for this type
▸BISEQUIPMENT USE PERMITS7
08/17/2020123730178Open ↗
08/13/2020123730178Open ↗
Showing 2 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
05/17/2024123714445Open ↗
03/26/2019123098520Open ↗
Showing 2 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
08/17/2020123730178Open ↗
07/19/2020123730178Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection81
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist28
09/05/2026M00138955-I1Open ↗
09/04/2026M00440482-I1Open ↗
09/04/2026M00440482-P3Open ↗
Showing 3 of 28 on file for this type
▸BISANTI-HARASSMENT CHECKLIST: CLINTON21
01/11/2021140990998Open ↗
Showing 1 of 21 on file for this type
▸BISTenant Protection Plan and Notes11
03/21/2019123714445Open ↗
03/21/2019123730178Open ↗
03/21/2019123730187Open ↗
Showing 3 of 11 on file for this type
▸BISSTREET TREE CHECKLIST4
06/21/2024124040368Open ↗
02/11/2021140993977Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWTenant Protection Plan4
09/04/2026M00440482-P1Open ↗
09/04/2026M00440482-I1Open ↗
09/04/2026M00440482-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCertificate of No Harassment4
08/18/2026M01366148-I1Open ↗
08/13/2026M00911857-P1Open ↗
08/13/2026M00480609-I1Open ↗
Showing 3 of 4 on file for this type
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT3
05/20/2019123730187Open ↗
03/21/2019123714445Open ↗
Showing 2 of 3 on file for this type
▸BISCLINTON DISTRICT: ANTI-HARASSMENT CHECKLIST2
06/21/2024124040368Open ↗
02/11/2021140993977Open ↗
▸BISTPP1: TENANT PROTECTION PLAN2
07/05/2021140993977Open ↗
02/04/2021140990998Open ↗
▸BISHPD-1 - Anti-Harassment Area Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHPD-2 - Clinton Special district Anti-Harassment Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos63
▸DOB NOWOER: Notice to Proceed24
09/05/2026M00138955-I1Open ↗
09/04/2026M00440482-P1Open ↗
09/04/2026M00440482-P3Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWOER: Notice of Satisfaction13
09/05/2026M00138955-I1Open ↗
08/18/2026M01366148-I1Open ↗
08/15/2026M00481001-I1Open ↗
Showing 3 of 13 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED10
06/26/2024124040368Open ↗
02/11/2021140993977Open ↗
01/11/2021140990998Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION5
07/29/2024124040368Open ↗
05/23/2024123714445Open ↗
09/29/2022140993977Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance39
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS17
05/01/2019123730178Open ↗
03/21/2019123730178Open ↗
04/24/2018123163245Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
05/03/2021140993977Open ↗
07/22/2020123730178Open ↗
Showing 2 of 5 on file for this type
▸BISINTERIOR LIGHTING POWER3
09/26/2022140990998Open ↗
08/04/2022140993977Open ↗
08/13/2020123730178Open ↗
▸BISLIGHTING CONTROLS3
09/26/2022140990998Open ↗
08/04/2022140993977Open ↗
08/13/2020123730178Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
04/24/2018123163245Open ↗
Showing 1 of 3 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS3
09/26/2022140990998Open ↗
08/04/2022140993977Open ↗
08/13/2020123730178Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
09/26/2022140990998Open ↗
08/04/2022140993977Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00480609-I1Open ↗
08/13/2026M00718279-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00718279-I1Open ↗
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY10
05/03/2021140993977Open ↗
Showing 1 of 10 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION4
04/24/2018123163245Open ↗
04/23/2018123163227Open ↗
04/23/2018123163254Open ↗
Showing 3 of 4 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)3
09/26/2022140990998Open ↗
08/04/2022140993977Open ↗
08/13/2020123730178Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
09/26/2022140990998Open ↗
08/04/2022140993977Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
03/08/2019122967593Open ↗
▸Approvals, Objections & Sign-offs63
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST25
05/23/2024123714445Open ↗
09/29/2022140990998Open ↗
08/13/2020123730178Open ↗
Showing 3 of 25 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION18
05/29/2020123730187Open ↗
05/03/2019122533614Open ↗
04/24/2019123730178Open ↗
Showing 3 of 18 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
06/14/2024124040368Open ↗
05/03/2021140993977Open ↗
04/26/2021140993977Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER4
09/03/2024140279570Open ↗
Showing 1 of 4 on file for this type
▸BISFINAL2
09/26/2022140990998Open ↗
08/13/2020123730178Open ↗
▸Cost, Insurance & Ownership65
▸BISCOST AFFIDAVIT60
02/11/2021140993977Open ↗
01/11/2021140990998Open ↗
05/29/2020123730187Open ↗
Showing 3 of 60 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
05/23/2024123714445Open ↗
09/26/2022140990998Open ↗
08/13/2020123730178Open ↗
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms102
▸BISADDITIONAL INFORMATION43
07/11/2024124040368Open ↗
06/14/2021140993977Open ↗
05/27/2021140993977Open ↗
Showing 3 of 43 on file for this type
▸BISEFILING COVER SHEET37
05/29/2024124040368Open ↗
03/21/2019123714445Open ↗
03/21/2019123730178Open ↗
Showing 3 of 37 on file for this type
▸BISBOROUGH INTAKE FORM15
09/03/2024140279570Open ↗
07/05/2019123098520Open ↗
05/10/2019122533614Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
02/11/2021140993977Open ↗
01/11/2021140990998Open ↗
Showing 2 of 7 on file for this type
▸Other Documents28
▸DOB NOWDHCR Document12
09/04/2026M00440482-I1Open ↗
09/04/2026M00440482-P3Open ↗
09/04/2026M00440482-P2Open ↗
Showing 3 of 12 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
05/27/2021140993977Open ↗
Showing 1 of 7 on file for this type
▸BISPLOT DIAGRAM4
06/21/2024124040368Open ↗
02/11/2021140993977Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWMultiple Dwelling Special District Notice to Community Board2
09/05/2026M00138955-I1Open ↗
08/13/2026M00175150-I1Open ↗
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation2
09/05/2026M00138955-I1Open ↗
08/13/2026M00175150-I1Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01389446-I1Open ↗