← Back
BuildNYC
Parochial school, yeshiva
602 PORT RICHMOND AVENUE
STATEN ISLAND · Port Richmond · BIN 5107097
💬 Discuss this project
1955Year Built
1Stories
W2Building Class
R3AZoning
70,876 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Parochial school, yeshiva · Owner of record: RC Church St Roch · 6,067 sf lot · 11.68 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Sub-Basement1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RC Church St Roch103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Permanent Engineering403/08/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rucci Plumbing & HeatingPlumbing407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Reliance Engineering322203/08/2024
Building Lifecycle
All (41)Filed (4)Permit Issued (2)Signed Off (2)Violation (16)Inspection (4)Special Inspection (2)
01/06/2026
Boiler inspection report filed
Initial · no defects · Accepted
10/29/2025
ADM-02-03: Failed to produce approval from the Department of Buildings for design and installation of material, device, equipment, system,…
FDNY_ORDER violation · closed
10/29/2025
EG-21-12: Failed to maintain required illumination level for means of egress, in violation of FC107.1, FC1027.1, 1938 BC 26-280.0, 1968 BC 27-381,…
FDNY_ORDER violation · closed
10/29/2025
EG-21-06: Failed to maintain means of egress free from obstructions or impediments, in violation of FC1027.2 and 1027.3.
FDNY_ORDER violation · closed
01/27/2025
Boiler inspection report filed
Initial · no defects · Accepted
05/16/2024
Signed off — Alteration
Direct replacement of two Gas boiler in existing basement of Church. Plumbing filed subsequently.
S00873939-I1
05/08/2024
Signed off — Alteration
Direct replacement of two Gas boiler in existing basement of Church. Plumbing filed subsequently.
S00873939-S1
05/01/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/30/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/23/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/12/2024
Special inspection requirement — Heating Systems
Ralph Giorgio
03/08/2024
Filed — Alteration
Direct replacement of two Gas boiler in existing basement of Church. Plumbing filed subsequently.
S00873939-P2
03/08/2024
Filed — Alteration
Direct replacement of two Gas boiler in existing basement of Church. Plumbing filed subsequently.
S00873939-P1
02/22/2024
Special inspection requirement — Heating Systems
Ralph Giorgio
02/12/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/19/2024
Boiler inspection report filed
Initial · no defects · Accepted
01/16/2024
Permit renewed — Plumbing
Renewed without changes
S00873939-S1-PL
01/16/2024
Permit renewed — Boiler Equipment
Renewed without changes
S00873939-I1-BE
06/28/2023
Permit issued — Plumbing
S00873939-S1-PL
06/27/2023
Permit issued — Boiler Equipment
S00873939-I1-BE
06/08/2023
Filed — Alteration
Direct replacement of two Gas boiler in existing basement of Church. Plumbing filed subsequently.
S00873939-S1
06/01/2023
Filed — Alteration
Direct replacement of two Gas boiler in existing basement of Church. Plumbing filed subsequently.
S00873939-I1
05/05/2023
Closed: Local law 62/91 - boilers: boiler (DOB violation)
DOB violation · closed on the city's record
01/11/2023
Boiler inspection report filed
Initial · no defects · Accepted
01/25/2022
Boiler inspection report filed
Initial · no defects · Accepted
01/22/2021
Boiler inspection report filed
Initial · no defects · Accepted
01/23/2020
Boiler inspection report filed
Initial · no defects · Accepted
07/24/2019
Closed: Failure to file benchmarking report of energy use as per ad. Code sec. 28-309.4
DOB violation · closed on the city's record
05/02/2019
Failure to file benchmarking report of energy use as per ad. Code sec. 28-309.4
DOB violation · closed · Issued 2019; DOB's record still lists it as active
02/21/2019
Boiler inspection report filed
Initial · no defects · Accepted
02/16/2019
Failure to file benchmarking report of energy use as per ad. Code sec. 28-309.4
DOB violation · closed · Issued 2019; DOB's record still lists it as active
03/16/2018
Boiler inspection report filed
Initial · no defects · Accepted
06/03/2013
Failure to file benchmarking report of energy use as per ad. Code sec. 28-309.4
DOB violation · closed · Issued 2013; DOB's record still lists it as active
05/03/2012
Failure to file benchmarking report of energy use as per ad. Code sec. 28-309.4
DOB violation · closed · Issued 2012; DOB's record still lists it as active
01/01/2012
Failure to file benchmarking report of energy use as per ad. Code sec. 28-309.4
DOB violation · closed · Issued 2012; DOB's record still lists it as active
08/13/2003
34A/50 50)discharge pipe from saftey valve has been thieaded end.
ECB violation · closed
04/10/1998
Closed: Local law 62/91 - boilers: boiler (DOB violation)
DOB violation · closed on the city's record
09/16/1997
Local law 62/91 - boilers: boiler (DOB violation)
DOB violation · closed · Issued 1997; DOB's record still lists it as active
12/08/1995
Closed: Local law 62/91 - boilers: boiler (DOB violation)
DOB violation · closed on the city's record
06/08/1994
Local law 62/91 - boilers: boiler (DOB violation)
DOB violation · closed · Issued 1994; DOB's record still lists it as active
06/04/1993
Local law 62/91 - boilers: boiler (DOB violation)
DOB violation · closed · Issued 1993; DOB's record still lists it as active
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Rucci Plumbing & Heating—
DOB NOW—Rucci Plumbing & Heating—
DOB NOW—Rucci Plumbing & Heating—
DOB NOW—Rucci Plumbing & Heating—
BIS—Taranto Construction Co—
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026S00873939-S1Request the plans ↗
08/23/2026S00873939-I1Request the plans ↗
08/23/2026S00873939-P2Request the plans ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026S00873939-I1Open ↗
08/13/2026S00873939-P2Open ↗
08/13/2026S00873939-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026S00873939-I1Open ↗
08/25/2026S00873939-P2Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026S00873939-P1Open ↗
08/13/2026S00873939-I1Open ↗
08/13/2026S00873939-S1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026S00873939-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/13/2026S00873939-I1Open ↗
08/13/2026S00873939-P2Open ↗
08/13/2026S00873939-S1Open ↗
Showing 3 of 4 on file for this type