Elevator apt, fireproof with stores
6020 3RD AVENUE
BROOKLYN · BIN 3429099
💬 Discuss this project
2021Year Built
5Stories
D6Building Class
R6BZoning
57,878 sfGross Floor Area
54Units
LL97 CoveredRent Stabilized47 Open Violations 46 unresolved · 1 paperwork only ▸FDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: 40-70 REALTY LLC · 18,238 sf lot · 3.17 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof3p · 1 filing · 12 docs
Floor 53p · 1 filing · 12 docs
Floor 4
Floor 3
Floor 23p · 1 filing · 12 docs
Floor 13p · 1 filing · 12 docs
CellarUnder Construction6p · 2 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
40-70 REALTY LLC1709/13/2026
62-08 HOLDING1807/08/2026
LUCKY HOI INC1303/22/2026
149-17 REALTY INC703/22/2026
ALL BOROUGH GROUP SVC3203/22/2026
ALL BOROUGH GROUP SERVICE103/22/2026
40-70 REALTY LLC WEI CHEN103/22/2026
FANG ARCHITECT103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MW PROFESSIONAL ENGINEERING, P.C.408/18/2026
EJC ENGINEERING, PLLC301/05/2023
JOEL PHAGOO P.E. PLLC403/30/2022
FANG ARCHITECT110/15/2020
TAN ARCHITECT P.C111/21/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE803/21/2026
BMB BUILDING CONSULTING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALL BOROUGH GROUP SVC INCGeneral Contractor703/22/2026
MPS PLUMBING & HEATING INCFire Protection407/08/2026
AKM CONSTRUCTION NY CORPGeneral Contractor403/21/2026
YX CONSTRUCTION INCGeneral Contractor203/21/2026
GENESIS NYC CONSTRUCTIONGeneral Contractor208/26/2026
CROSSFIELD PLBG.&HTGPlumbing108/26/2026
MPS PLUMBING HEATING INGeneral Contractor103/22/2026
R T ELECTRICAL CORP 004190General Contractor103/22/2026
WEN BIN CENElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MW PROFESSIONAL ENGINEERI570408/18/2026
STEEL CORE ENGINEERING PL1098301/05/2023
JOEL PHAGOO ,PE, PLLC2416203/30/2022
Building Lifecycle
All (113)Filed (13)Permit Issued (12)Signed Off (5)Violation (57)Inspection (10)Objection (4)Special Inspection (12)
09/09/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/09/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/19/2026
Violation issued (HPD, open)
A
08/18/2026
Filed — Alteration
FILE TO RENOVATION FOR EXISTING DAY CARE IN CELLAR. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01394880-P1
08/17/2026
Permit issued — Plumbing
B01394880-S1-PL
08/17/2026
Special inspection requirement — Energy Code Compliance Inspections
MING WAI WONG
08/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MING WAI WONG
08/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
MING WAI WONG
08/05/2026
Filed — Alteration
FILE TO RENOVATION FOR EXISTING DAY CARE IN CELLAR. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01394880-S1
07/30/2026
Violation issued (HPD, open)
C
07/30/2026
Violation issued (HPD, closed)
C
07/30/2026
Violation issued (HPD, closed)
C
07/30/2026
Violation issued (HPD, closed)
C
07/30/2026
Violation issued (HPD, closed)
C
07/30/2026
Violation issued (HPD, closed)
C
07/30/2026
Violation issued (HPD, open)
B
07/30/2026
Violation issued (HPD, open)
B
07/30/2026
Violation issued (HPD, open)
C
07/30/2026
Violation issued (HPD, open)
B
07/30/2026
Violation issued (HPD, open)
A
07/30/2026
Violation issued (HPD, open)
B
07/30/2026
Violation issued (HPD, open)
B
07/29/2026
Permit issued — General Construction
B01394880-I1-GC
07/23/2026
Permit issued — General Construction
B01413602-I1-GC
07/23/2026
Violation issued (HPD, open)
B
06/10/2026
Filed — Alteration
FILE TO REMEDY VIOLATION #39095934L. NO CHANGE OF USE EGRESS OR OCCUPANCY
B01413602-I1
06/01/2026
Violation issued (HPD, closed)
C
05/01/2026
Filed — Alteration
FILE TO RENOVATION FOR EXISTING DAY CARE IN CELLAR. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01394880-I1
09/27/2023
Violation issued (ECB, open)
Construction
08/24/2023
Violation issued (FDNY_NOV, closed)
02/09/2023
Signed off — Alteration
Revised sprinkler system per as built conditions
B00351993-I1
02/07/2023
Inspection — Pass-Final SD - Up to 9 Requested Floors
Pass
View inspection ↗
02/06/2023
Special inspection requirement — Standpipe Systems
Alexander Sheyman
02/06/2023
Special inspection requirement — Sprinkler Systems
Alexander Sheyman
02/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Sheyman
02/02/2023
Objection resolved — Addressed
02/01/2023
Objection raised — Other
01/31/2023
Objection resolved — Addressed
01/19/2023
Signed off — Alteration
B00251882-I1
01/17/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/12/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
01/09/2023
Objection raised — Other
01/05/2023
Filed — Alteration
Revised sprinkler system per as built conditions
B00351993-P2
01/05/2023
Permit issued — Curb Cut
B00251882-I1-CC
01/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Sheyman
01/04/2023
Special inspection requirement — Sprinkler Systems
Alexander Sheyman
01/04/2023
Special inspection requirement — Standpipe Systems
Alexander Sheyman
12/30/2022
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
12/27/2022
Inspection — Pass-Final SD - Up to 9 Requested Floors
Pass
View inspection ↗
12/26/2022
Signed off — Alteration
INSTALL TEMPORARY CONSTRUCTION FENCE, CONJUNCTION WITH #321998549, #321998558 & #321998567, #321385844.
B00413693-I1
12/23/2022
Permit issued — Sprinklers
B00351993-I1-EW-SD
12/23/2022
Permit issued — Sprinklers
B00351993-I1-EW-SP
12/19/2022
Violation issued (ECB, closed)
Construction
12/19/2022
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
12/19/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/19/2022
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
11/10/2022
Filed — Alteration
Revised sprinkler system per as built conditions
B00351993-P1
10/28/2022
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00595804-I1
10/28/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00645049-I1
09/14/2022
Violation issued (ECB, closed)
Construction
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCROSSFIELD PLBG.&HTG08/17/2026
DOB NOWGeneral ConstructionPermit IssuedGENESIS NYC CONSTRUCTION07/29/2026
DOB NOWGeneral ConstructionPermit IssuedGENESIS NYC CONSTRUCTION07/23/2026
DOB NOWCurb CutSigned-offALL BOROUGH GROUP SVC INC01/05/2023
DOB NOWSprinklersSigned-offMPS PLUMBING & HEATING INC12/23/2022
DOB NOWSprinklersSigned-offMPS PLUMBING & HEATING INC12/23/2022
DOB NOWSupported ScaffoldSigned-offAKM CONSTRUCTION NY03/01/2022
DOB NOWConstruction FenceSigned-offALL BOROUGH GROUP SVC INC01/25/2022
DOB NOWSprinklersSigned-offMPS PLUMBING & HEATING INC12/29/2021
DOB NOWStandpipeSigned-offMPS PLUMBING & HEATING INC12/29/2021
DOB NOWConstruction FenceSigned-offYX CONSTRUCTION INC12/09/2021
DOB NOWSidewalk ShedSigned-offAKM CONSTRUCTION NY10/07/2021
BISPLISSUEDMPS PLUMBING & HEATING INC09/29/2022
BIS—ISSUEDALL BOROUGH GROUP SVC INC09/16/2022
BIS—ISSUEDALL BOROUGH GROUP SVC INC01/18/2022
BIS—ISSUEDALL BOROUGH GROUP SVC INC10/08/2021
BIS—ISSUEDALL BOROUGH GROUP SVC INC09/16/2021
BISPLISSUEDMPS PLUMBING & HEATING INC08/30/2021
BIS—ISSUEDALL BOROUGH GROUP SVC INC04/14/2021
BIS—ISSUEDALL BOROUGH GROUP SVC INC04/14/2021
1 project · most recent 08/18/2026
Water/Sanitary
FiledStatusContractorScope
08/18/2026Permit IssuedCROSSFIELD PLBG.&HTGWater/Sanitary
4 projects · most recent 01/08/2023
General Wiring
FiledStatusContractorScope
01/08/2023CompleteR & T ELECTRICAL CORPGeneral Wiring
01/14/2022CompleteKWONG MING ELECTRIC INC—
11/10/2021CompleteR & T ELECTRICAL CORP—
09/17/2021CompleteNASH ELECTRIC SERVICES IN—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
09/09/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/09/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/07/2023Pass-Final SD - Up to 9 Requested FloorsPassView ↗
01/17/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
01/12/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
12/30/2022Pass-Final SP - Up to 9 Requested FloorsPassView ↗
12/27/2022Pass-Final SD - Up to 9 Requested FloorsPassView ↗
12/19/2022Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
12/19/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/19/2022Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
08/17/2026Energy Code Compliance InspectionsMING WAI WONGprogress
08/17/2026Fire-Resistant Penetrations and JointsMING WAI WONGspecial
08/17/2026Tenant Protection Plan ComplianceMING WAI WONGspecial
02/06/2023Standpipe SystemsAlexander Sheymanspecial
02/06/2023Sprinkler SystemsAlexander Sheymanspecial
02/06/2023Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
01/04/2023Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
01/04/2023Sprinkler SystemsAlexander Sheymanspecial
01/04/2023Standpipe SystemsAlexander Sheymanspecial
03/31/2022FinalJOEL PHAGOOprogress
03/31/2022Post-installed AnchorsJOEL PHAGOOspecial
03/18/2022Post-installed AnchorsJOEL PHAGOOspecial
▾Documents — 184 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch7
09/01/2026B00595804-I1Request digital key ↗
09/01/2026B00595804-P1Request digital key ↗
08/31/2026B00645049-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
08/28/2026B00351993-P1Request digital key ↗
08/28/2026B00351993-I1Request digital key ↗
08/14/2026B00351993-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe3
08/28/2026B00351993-I1Request digital key ↗
08/15/2026B00351993-P1Request digital key ↗
08/14/2026B00351993-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
09/02/2026B00251882-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00413693-I1Request digital key ↗
▸Applications & Permits32
▸BISPLAN / WORK APPROVAL APPLICATION24
03/10/2023321385844Open ↗
03/07/2023321385844Open ↗
03/03/2023321385844Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION5
01/20/2022321385844Open ↗
08/30/2021321385844Open ↗
04/15/2021321385844Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
05/12/2020340703652Open ↗
11/12/2019340703652Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/20/2022321385844Open ↗
▸Zoning, Tax Lot & Property Records11
▸BISADDRESS: NEW HOUSE NUMBER APPROVED3
12/22/2022321385844Open ↗
11/12/2019340703652Open ↗
05/20/2019321385844Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
11/12/2019340703652Open ↗
05/20/2019321385844Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
02/11/2020321385844Open ↗
▸BISVERIFY TAX LOT1
01/03/2023321385844Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
12/21/2022321385844Open ↗
▸BISZONING DIAGRAM1
05/28/2020321385844Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
02/11/2020321385844Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
03/01/2023321385844Open ↗
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/02/2026B00413693-I1Open ↗
09/01/2026B00595804-I1Open ↗
09/01/2026B00595804-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026B01394880-P1Open ↗
08/31/2026B00645049-P1Open ↗
08/27/2026B00645049-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
04/15/2021321385844Open ↗
04/15/2021321385844Open ↗
04/15/2021321385844Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/02/2026B01394880-P1Open ↗
08/27/2026B00645049-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/12/2019340703652Open ↗
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING4
01/18/2023321385844Open ↗
06/03/2022321385844Open ↗
05/28/2020321385844Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
06/15/2023321385844Open ↗
12/28/2022321385844Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
12/21/2022321385844Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
02/11/2020321385844Open ↗
▸BISEQUIPMENT USE PERMITS1
06/19/2023321385844Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
06/01/2023321385844Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
12/21/2022321385844Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST3
04/10/2020340703652Open ↗
11/12/2019340703652Open ↗
05/20/2019321385844Open ↗
▸BISBPP: STREET TREES SITE PLAN1
04/10/2020340703652Open ↗
▸BISSTREET TREE SIGNOFF1
01/10/2023321385844Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
04/10/2020340703652Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY12
02/21/2023321385844Open ↗
02/21/2023321385844Open ↗
02/20/2023321385844Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/15/2021321385844Open ↗
04/15/2021321385844Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/21/2023321385844Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/28/2023321385844Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
03/20/2023321385844Open ↗
▸Inspections & Test Reports23
▸BISTECHNICAL REPORT: RESPONSIBILITY17
02/21/2023321385844Open ↗
02/21/2023321385844Open ↗
02/20/2023321385844Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
02/17/2023321385844Open ↗
04/15/2021321385844Open ↗
▸BISSOIL REPORT1
05/28/2020321385844Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
05/28/2020321385844Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
04/15/2021321385844Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
12/21/2022321385844Open ↗
▸Approvals, Objections & Sign-offs14
▸BISSCHEDULE A - OCCUPANCY / USE9
03/10/2023321385844Open ↗
03/07/2023321385844Open ↗
03/03/2023321385844Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
02/28/2023321385844Open ↗
01/25/2023321385844Open ↗
01/20/2023321385844Open ↗
Showing 3 of 4 on file for this type
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
12/24/2022321385844Open ↗
▸Cost, Insurance & Ownership2
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
04/15/2021321385844Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
04/15/2021321385844Open ↗
▸Filing & Intake Forms23
▸BISADDITIONAL INFORMATION17
03/16/2023321385844Open ↗
02/22/2023321385844Open ↗
02/22/2023321385844Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING COVER SHEET2
05/09/2019321385844Open ↗
05/09/2019321385844Open ↗
▸BISBOROUGH INTAKE FORM2
01/20/2022321385844Open ↗
07/08/2021321385844Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/12/2019340703652Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
04/10/2020340703652Open ↗
▸Other Documents6
▸BISBPP - SUPPORTING DOCUMENTATION3
04/10/2020340703652Open ↗
04/10/2020340703652Open ↗
11/12/2019340703652Open ↗
▸BISMAINTENANCE INFORMATION1
02/21/2023321385844Open ↗
▸BISPLOT DIAGRAM1
05/20/2019321385844Open ↗
▸BISUnknown1
06/14/2023321385844Open ↗