← Back
Public elementary, junior or senior high
P.S. 226 Alfred De B. Mason
6024 23 AVENUE · Mapleton-Midwood (West) · BIN 3172071
💬 Discuss this project
1931Year Built
4Stories
W1Building Class
R6Zoning
97,744 sfGross Floor Area
1Units
LL97 Covered11 Open Violations 9 unresolved · 2 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 67,000 sf lot · 1.46 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC DEPARTMENT OF EDUCATION103/22/2026
DOE PS 226 040803/22/2026
DOE PS 226803/22/2026
PS 226 DOE903/22/2026
DEPARTMENT OF EDUCATION503/22/2026
DEPT. OF EDUCATION PS 226103/22/2026
DOE 040103/22/2026
DEPT. OF EDUCATION 0403/22/2026
DEPT. OF EDUCATION-P.S. 2103/22/2026
P.S. 226 DEPT. OF EDU203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYCSCA402/06/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CEDOMIR MARAElectrical203/21/2026
CHARAN ELEC'L ENTERP'S INElectrical103/22/2026
EVEREST ELECTRIC CORPElectrical103/22/2026
FRANCIS RICHARDSElectrical103/21/2026
GIOVANNI DITURIElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.317402/06/2026
Building Lifecycle
All (89)Filed (4)Violation (60)Special Inspection (25)
03/26/2026
Violation issued (ECB, closed)
Construction
03/26/2026
Violation issued (ECB, open)
Construction
03/26/2026
Violation issued (ECB, closed)
Construction
03/26/2026
Violation issued (ECB, closed)
Construction
03/13/2026
Special inspection requirement — Subgrade Inspections
MAXIM KORNGOLD
03/12/2026
Special inspection requirement — Post-installed Anchors
MAXIM KORNGOLD
03/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAXIM KORNGOLD
03/10/2026
Special inspection requirement — Post-installed Anchors
MAXIM KORNGOLD
02/06/2026
Filed — Alteration
B01323266-S3
02/05/2026
Filed — Alteration
B01323266-S1
02/05/2026
Filed — Alteration
B01323266-S2
02/05/2026
Filed — Alteration
B01323266-I1
02/05/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
MAXIM KORNGOLD
02/05/2026
Special inspection requirement — Concrete - Cast-In-Place
MAXIM KORNGOLD
02/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAXIM KORNGOLD
02/05/2026
Special inspection requirement — Masonry
MAXIM KORNGOLD
02/05/2026
Special inspection requirement — Post-installed Anchors
MAXIM KORNGOLD
02/05/2026
Special inspection requirement — Sprayed fire-resistant materials
MAXIM KORNGOLD
02/05/2026
Special inspection requirement — Structural Steel - Details
MAXIM KORNGOLD
02/05/2026
Special inspection requirement — Structural Steel - Welding
MAXIM KORNGOLD
02/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
MAXIM KORNGOLD
02/05/2026
Special inspection requirement — Structural Steel - Welding
MAXIM KORNGOLD
02/05/2026
Special inspection requirement — Structural Steel - Details
MAXIM KORNGOLD
02/05/2026
Special inspection requirement — Concrete - Cast-In-Place
MAXIM KORNGOLD
02/05/2026
Special inspection requirement — Structural Steel - High Strength Bolting
MAXIM KORNGOLD
02/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAXIM KORNGOLD
02/05/2026
Special inspection requirement — Post-installed Anchors
MAXIM KORNGOLD
01/16/2026
Special inspection requirement — Final
MAXIM KORNGOLD
01/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAXIM KORNGOLD
11/24/2025
Special inspection requirement — Final
MAXIM KORNGOLD
11/24/2025
Special inspection requirement — Mechanical Systems
MAXIM KORNGOLD
11/21/2025
Special inspection requirement — Final
MAXIM KORNGOLD
11/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAXIM KORNGOLD
03/27/2025
Violation issued (ECB, closed)
Construction
03/17/2025
Violation issued (FDNY_ORDER, closed)
03/17/2025
Violation issued (FDNY_ORDER, closed)
01/02/2025
Violation issued (FDNY_ORDER, closed)
01/02/2025
Violation issued (FDNY_ORDER, closed)
05/31/2024
Violation issued (ECB, closed)
Construction
02/10/2023
Violation issued (ECB, closed)
Construction
07/27/2022
Violation issued (ECB, open)
Boilers
05/31/2022
Violation issued (ECB, closed)
Construction
10/10/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/21/2021
Violation issued (ECB, closed)
Construction
06/29/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/03/2020
Violation issued (ECB, closed)
Construction
06/03/2020
Violation issued (ECB, closed)
Construction
06/03/2020
Violation issued (ECB, closed)
Construction
06/03/2020
Violation issued (ECB, closed)
Construction
09/06/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/21/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/22/2018
Violation issued (ECB, closed)
Construction
01/26/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/14/2017
Violation issued (ECB, closed)
Construction
07/14/2017
Violation issued (ECB, closed)
Construction
07/14/2017
Violation issued (ECB, closed)
Construction
01/03/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/28/2016
Violation issued (ECB, closed)
Construction
11/28/2016
Violation issued (ECB, closed)
Construction
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDNYC DESIGN GROUP INC01/29/2015
BISOTISSUEDDEBORAH BRADLEY CONS & MG12/28/2012
BISOTISSUEDDEBORAH BRADLEY CONS & MG12/13/2012
BISPLISSUEDVARSITY PLBG AND HTG INC07/29/2011
BISOTISSUEDDEBORAH BRADLEY CONS & MG07/29/2011
BISPLISSUEDVITAL PLUMBING, INC05/06/2011
BISOTISSUEDCITIZEN GEN. CONTRACTORS03/31/2011
BISOTISSUEDDEBORAH BRADLEY CONS & MG07/28/2010
BISPLISSUEDVARSITY PLBG AND HTG INC07/20/2010
BISOTISSUEDCITIZEN GEN. CONTRACTORS03/11/2010
BISPLISSUEDVITAL PLUMBING, INC03/11/2010
BISOTISSUEDHI-TECH RESTORATION INC06/25/2009
BISEQISSUEDHI-TECH RESTORATION INC06/25/2009
BISEQISSUEDSCAFFOLDING ONE INCORPORATED04/14/2004
BISEQISSUEDSCAFFOLDING ONE INCORPORATED04/14/2004
BISEQISSUEDSCAFFOLDING ONE INCORPORATED12/30/2003
BISEQISSUEDSCAFFOLDING ONE INCORPORATED12/30/2003
BISEQISSUEDSCAFFOLDING ONE INCORPORATED08/06/2003
BISEQISSUEDSCAFFOLDING ONE INCORPORATED07/23/2003
BISEQISSUEDL & B CONSTRUCTION01/21/2003
BISEQISSUEDL & B CONSTRUCTION12/30/2002
BISEQISSUEDL & B CONSTRUCTION02/28/2002
BISEQISSUEDL & B CONSTRUCTION01/03/2002
BISEQISSUEDL & B CONSTRUCTION11/27/2001
BISPLISSUEDWARD MECHANICAL CORPORATION10/15/1997
BISPLISSUEDACE CONTRACTING INCORPORATED06/13/1997
BISOTISSUEDCCA INCORPORATED12/19/1996
BISPLISSUEDB.G.NATIONAL PLUMBING & HEATING04/28/1995
BISMHISSUEDB.G.NATIONAL PLUMBING & HEATING04/28/1995
BISFBISSUEDCENTRAL MECHANICAL SYSTEMS, INC.02/16/1993
BISOTISSUEDCENTRAL MECHANICAL SYSTEMS, INC.02/16/1993
BISPLISSUEDFORSYTHE P&H CORP02/16/1993
BISBLISSUEDCENTRAL MECHANICAL SYSTEMS, INC.02/11/1993
BISOTISSUEDCENTRAL MECH. SYSTEMS, INC.02/11/1993
23 projects · most recent 06/06/2026
General Wiring
FiledStatusContractorScope
06/06/2026CompleteA & S ELECTRIC INC.—
05/20/2026Permit IssuedDVM ELECTRICAL SERVICES LGeneral Wiring
07/30/2025CompleteEVEREST ELECTRIC CORP—
06/25/2025CompleteEVEREST ELECTRIC CORP—
06/24/2025CompleteEVEREST ELECTRIC CORP—
06/22/2025CompleteEVEREST ELECTRIC CORP—
11/28/2024Permit IssuedJ & T GENERAL CORP DBAGeneral Wiring
11/25/2024CompleteEVEREST ELECTRIC CORP—
03/21/2024Permit IssuedA & S ELECTRIC INC.General Wiring
03/21/2024Permit IssuedA & S ELECTRIC INC.General Wiring
12/08/2022Permit IssuedA & S ELECTRIC INC.General Wiring
08/31/2022CompleteCHARAN ELEC'L ENTERP'S IN—
07/29/2022Permit IssuedGEMINI ELECTRIC CO., INC.General Wiring
02/08/2021CompleteKLK ELECTRIC, INCGeneral Wiring
08/06/2020Permit IssuedA & S ELECTRIC INC.—
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
03/13/2026Subgrade InspectionsMAXIM KORNGOLDspecial
03/12/2026Post-installed AnchorsMAXIM KORNGOLDspecial
03/10/2026Fire-Resistant Penetrations and JointsMAXIM KORNGOLDspecial
03/10/2026Post-installed AnchorsMAXIM KORNGOLDspecial
02/05/2026Subsurface Conditions – Fill Placement & In-Place DensityMAXIM KORNGOLDspecial
02/05/2026Concrete - Cast-In-PlaceMAXIM KORNGOLDspecial
02/05/2026Fire-Resistant Penetrations and JointsMAXIM KORNGOLDspecial
02/05/2026MasonryMAXIM KORNGOLDspecial
02/05/2026Post-installed AnchorsMAXIM KORNGOLDspecial
02/05/2026Sprayed fire-resistant materialsMAXIM KORNGOLDspecial
02/05/2026Structural Steel - DetailsMAXIM KORNGOLDspecial
02/05/2026Structural Steel - WeldingMAXIM KORNGOLDspecial
02/05/2026Fire-Resistance Rated ConstructionMAXIM KORNGOLDprogress
02/05/2026Structural Steel - WeldingMAXIM KORNGOLDspecial
02/05/2026Structural Steel - DetailsMAXIM KORNGOLDspecial
02/05/2026Concrete - Cast-In-PlaceMAXIM KORNGOLDspecial
02/05/2026Structural Steel - High Strength BoltingMAXIM KORNGOLDspecial
02/05/2026Fire-Resistant Penetrations and JointsMAXIM KORNGOLDspecial
02/05/2026Post-installed AnchorsMAXIM KORNGOLDspecial
01/16/2026FinalMAXIM KORNGOLDprogress
01/16/2026Structural Stability – Alterations of existing buildingsMAXIM KORNGOLDspecial
11/24/2025FinalMAXIM KORNGOLDprogress
11/24/2025Mechanical SystemsMAXIM KORNGOLDspecial
11/21/2025FinalMAXIM KORNGOLDprogress
11/21/2025Structural Stability – Alterations of existing buildingsMAXIM KORNGOLDspecial
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/18/2026B01323266-S3Request digital key ↗
08/18/2026B01323266-I1Request digital key ↗
08/18/2026B01323266-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications26
▸DOB NOWSpecial Inspector Seal & Signature18
08/26/2026B01323266-S3Open ↗
08/26/2026B01323266-S3Open ↗
08/26/2026B01323266-S3Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B01323266-S1Open ↗
08/26/2026B01323266-S3Open ↗
08/23/2026B01323266-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026B01323266-S3Open ↗
08/13/2026B01323266-I1Open ↗
08/13/2026B01323266-S2Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/13/2026B01323266-S3Open ↗
08/13/2026B01323266-S1Open ↗
08/13/2026B01323266-I1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents8
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal6
08/18/2026B01323266-S3Open ↗
08/18/2026B01323266-I1Open ↗
08/18/2026B01323266-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProof of Historic Building2
08/18/2026B01323266-I1Open ↗
08/13/2026B01323266-I1Open ↗