← Back
BuildNYC
One family attached or semi-detached
603 LINWOOD STREET
BROOKLYN · BIN 3320499
💬 Discuss this project
1990Year Built
2Stories
A5Building Class
R5Zoning
1,134 sfGross Floor Area
1Units
One family attached or semi-detached · 1,728 sf lot · 0.66 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
CellarUnder Construction5p · 1 filing · 9 docs
Site & exteriorUnder Construction2p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Long Island Associates204/16/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Primetime ConstructionGeneral Contractor107/08/2026
Prime Piping & HeatingPlumbing110/29/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
G Engineering7778104/16/2026
Building Lifecycle
10/28/2026
Permit issued — Plumbing
B01388148-S1-PL
04/24/2026
Permit issued — General Construction
B01388148-I1-GC
04/16/2026
Filed — Alteration
FILING FOR NEW ENTRY STAIRS TO CELLAR AND INTERIOR RENOVATION AT THE CELLAR LEVEL. EXISTING ONE FAMILY DWELLING. NO CHANGE IN USE EGRESS OR OCCUPANCY
B01388148-I1
04/16/2026
Filed — Alteration
FILING FOR NEW ENTRY STAIRS TO CELLAR AND INTERIOR RENOVATION AT THE CELLAR LEVEL. EXISTING ONE FAMILY DWELLING. NO CHANGE IN USE EGRESS OR OCCUPANCY
B01388148-S1
04/16/2026
Special inspection requirement — Concrete - Cast-In-Place
XIONGCAI GU
9 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPrime Piping & Heating10/28/2026
DOB NOWGeneral ConstructionPermit IssuedPrimetime Construction04/24/2026
1 project · most recent 04/16/2026
Water/Sanitary
FiledStatusContractorScope
04/16/2026Permit IssuedAmb MechanicalWater/Sanitary
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/16/2026Concrete - Cast-In-PlaceXIONGCAI GUspecial
04/16/2026MasonryXIONGCAI GUspecial
04/16/2026Structural Stability – Alterations of existing buildingsXIONGCAI GUspecial
04/16/2026Tenant Protection Plan ComplianceXIONGCAI GUspecial
04/16/2026Energy Code Compliance InspectionsXIONGCAI GUprogress
9 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account