← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
603 PONTIAC PLACE
BRONX · BIN 2091322
💬 Discuss this project
2017Year Built
7Stories
RMBuilding Class
R7-1Zoning
32,011 sfGross Floor Area
27Units
LL97 CoveredRent Stabilized11 Active Violations 6 likely answered 1 old, status unconfirmed ▸
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: HP Jackson Avenue Housing Development Fu ND · 5,750 sf lot · 5.57 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 22 filings
Floor 12 filings
Site & exterior3 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Survival Realty Associates1503/21/2026
603 Pontiac Associates803/21/2026
30-32-34 Fanchon Place503/21/2026
3152 Albany Crescent103/21/2026
HP Jackson Avenue Housing Development Fu103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Cricket Architects NJ206/25/2021
Joselow and Associates101/29/2021
Dooling & Company Architects208/16/2018
Royal T&E111/28/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants303/21/2026
AE Design Solution403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Tri Borough ScaffoldingScaffold1407/08/2026
Galaxy General ContractingGeneral Contractor707/08/2026
Total NY ConstructionScaffold407/08/2026
Bauer MechancialPlumbing303/22/2026
AJC SprinklerFire Protection207/08/2026
Rock ScaffoldingGeneral Contractor103/21/2026
AEC Enginineering DesignGeneral Contractor103/21/2026
Marco Polo DesignGeneral Contractor103/21/2026
Rock Group NYGeneral Contractor103/21/2026
V. Vass ElectricElectrical103/22/2026
1 R.S.General Contractor105/13/2013
AJC Plumbing & HeatingPlumbing412/02/2019
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Certified Testing Laborat396101/29/2021
Building Lifecycle
03/13/2026
Boiler inspection report filed
Initial · no defects · Accepted
08/09/2025
566 (B) 27-2021.4 HMC: ABATE THE NUISANCE CONSISTING OF PESTS. EVIDENCE OF MITES IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st…
HPD violation · closed
05/08/2025
Elevator Category 1 inspection report filed
01/27/2025
Boiler inspection report filed
Initial · no defects · Accepted
12/17/2024
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE REPAIR HANDLE AT KITCHEN NORTH 1 WINDOW IN THE KITCHEN LOCATED AT APT 4B, 5th…
HPD violation · closed
137 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
Nothing on file for this building.
316 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account