← Back
BuildNYC
Elevator cooperative
The Antlers
603 WEST 111TH STREET · Name © OpenStreetMap contributors · Morningside Heights · BIN 1057326
💬 Discuss this project
1909Year Built
8Stories
D4Building Class
R8Zoning
28,224 sfGross Floor Area
17Units
LL97 CoveredRent Stabilized3 Active Violations 1 likely answered ▸FISP: SWARMP
Elevator cooperative · Owner of record: 603 West 111th Street Owners · 5,046 sf lot · 5.59 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofFISP repairs1p · 1 filing · 6 docs
Floor 4Unit 4E8p · 1 filing · 19 docs
Floor 3Unit 3E1p · 1 filing · 4 docs
Floor 2
Floor 1Unit 1E, Unit 1WUnder Construction9p · 4 filings · 20 docs
Site & exteriorFISP repairs8p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
603 W 111th St Owners2303/22/2026
603 West 111th Street503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Brian Cash Works106/30/2026
Becall Engineering Services408/11/2025
P&L Associates305/31/2024
Brent M. Porter, Architect, and Associates212/27/2022
Ashraf106/06/2022
Lpe Engineering106/02/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PM Architecture603/21/2026
Framework Consultants203/21/2026
Green Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Shamas Contracting CoGeneral Contractor504/08/2026
LYNX BuildersGeneral Contractor507/31/2026
Kay Waterproofingspecialty_contractor403/21/2026
Mega Art Home ImprovementGeneral Contractor303/21/2026
Platinum Services NYScaffold303/21/2026
Harold Headley PlumbingPlumbing107/08/2026
TCS ConstructionGeneral Contractor104/09/2026
Titan PlumbingPlumbing107/10/2026
Best Mechanical ServicesPlumbing107/08/2026
Cape PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Brent M. Porter, Architects4140112/12/2022
Prudigm Engineering Llcu4304111/08/2022
Lpe Engineering3102106/02/2022
Building Lifecycle
All (110)Filed (12)Permit Issued (15)Signed Off (4)Facade (FISP) (15)Violation (44)Inspection (6)Special Inspection (14)
07/30/2026
Permit issued — General Construction
M08002356-I1-GC
07/29/2026
Permit issued — General Construction
M08002356-I1-MS
07/08/2026
Permit issued — Plumbing
M01418862-I1-PL
06/30/2026
Filed — Alteration
Bathroom renovations of unit 3E in a pre-war elevator co-op. All plumbing fixtures will remain on existing roughing with like for like fixture replacement.
M01418862-I1
05/01/2026
Violation issued (HPD, closed)
C
05/01/2026
Violation issued (HPD, closed)
C
04/29/2026
Violation issued (HPD, open)
A
11/03/2025
Signed off — Alteration
PL WORKTYPE IN CONJUNCTION WITH M01049950-I1
M01049950-I1
09/26/2025
Signed off — Alteration
PL WORKTYPE IN CONJUNCTION WITH M01049950-I1
M01049950-S1
08/28/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/11/2025
Filed — Alteration
PL WORKTYPE IN CONJUNCTION WITH M01049950-I1
M01049950-P2
07/31/2025
Special inspection requirement — Final
John Alleyne
07/29/2025
Filed — Alteration
PL WORKTYPE IN CONJUNCTION WITH M01049950-I1
M01049950-P1
07/21/2025
Signed off — Alteration
facade restoration work to include brick replacement and repointing, stone mortar, and caulking.
M00719893-I1
06/04/2025
Violation issued (HPD, open)
A
03/03/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/24/2024
Permit issued — General Construction
M08002356-I1-GC
09/24/2024
Permit issued — Plumbing
M01049950-S1-PL
09/09/2024
Special inspection requirement — Final
John Alleyne
06/13/2024
Permit issued — Plumbing
M08004307-I1-PL
05/31/2024
Filed — Alteration
PROVIDE NEW PLUMBING FIXTURES AT EXISTING ROUGH-IN & ELEC. STOVE PROPOSED IN APT. 1E LIST CAP AND REMOVE GAS PIPING ON PW1B. ALL AS PER PLAN . IN CONJUNCTION WITH FILING #M08002356-I1. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M08004307-P1
05/31/2024
Special inspection requirement — Energy Code Compliance Inspections
Naeem Anwar
05/31/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Naeem Anwar
05/22/2024
Permit issued — General Construction
M01049950-I1-GC
05/15/2024
Special inspection requirement — Energy Code Compliance Inspections
Naeem Anwar
05/15/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Naeem Anwar
05/14/2024
Filed — Alteration
PL WORKTYPE IN CONJUNCTION WITH M01049950-I1
M01049950-I1
05/14/2024
Filed — Alteration
PL WORKTYPE IN CONJUNCTION WITH M01049950-I1
M01049950-S1
04/01/2024
Violation issued (HPD, open)
A
01/02/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/16/2023
Permit issued — General Construction
M08002356-I1-GC
11/14/2023
Permit issued — Mechanical Systems
M08002356-I1-MS
10/04/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/09/2023
Permit issued — General Construction
M00719893-I1-GC
05/30/2023
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00738339-I1
05/11/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/24/2023
Permit issued — General Construction
M08002356-I1-GC
04/06/2023
Permit issued — Plumbing
M00803938-I1-PL
02/16/2023
Permit issued — General Construction
M08053183-I1-GC
12/27/2022
Filed — Alteration
APPLICATION TO RENOVATE APARTMENT. MINOR PLUMBING WORK, RELOCATION OF KITCHEN AND NEW BATHROOM. APPLICATION FILED IN CONJUNCTION WITH GC APPLICATION M08053183-I1 NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00803938-I1
12/12/2022
Filed — Alteration
M08053183-I1
11/08/2022
Filed — Alteration
INTERIOR RENOVATION TO EXISTING RESIDENTIAL APARTMENT 1E. WORK TO INSTALL NEW DOORS AND NEW NON-BEARING PARITITIONS, AND KIT. AND BATH EXHAUSTS PER PLAN. NEW PLUMBING FIXTURES UNDER SEPERATE FILING #M08004307-I1. NO CHANGE TO USE, EGRESS, OR OCCUPANC
M08002356-I1
11/08/2022
Filed — Alteration
PROVIDE NEW PLUMBING FIXTURES AT EXISTING ROUGH-IN & ELEC. STOVE PROPOSED IN APT. 1E LIST CAP AND REMOVE GAS PIPING ON PW1B. ALL AS PER PLAN . IN CONJUNCTION WITH FILING #M08002356-I1. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M08004307-I1
11/02/2022
Violation issued (HPD, closed)
I
10/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Naeem Anwar
09/15/2022
Special inspection requirement — Energy Code Compliance Inspections
Naeem Anwar
09/15/2022
Special inspection requirement — Interior lighting power
Naeem Anwar
09/15/2022
Special inspection requirement — Lighting in dwelling units
Naeem Anwar
09/12/2022
Special inspection requirement — Mechanical Systems
Naeem Anwar
09/12/2022
Special inspection requirement — Final
Naeem Anwar
06/23/2022
Permit issued — General Construction
M00719893-I1-GC
06/07/2022
Permit issued — Sidewalk Shed
M00738339-I1-SH
06/06/2022
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00738339-I1
06/02/2022
Filed — Alteration
facade restoration work to include brick replacement and repointing, stone mortar, and caulking.
M00719893-I1
04/15/2022
Special inspection requirement — Final
Roberta Levine
04/15/2022
Special inspection requirement — Masonry
Roberta Levine
02/16/2022
Violation issued (HPD, closed)
A
02/09/2022
Cycle 9 facade report submitted
01/29/2022
Cycle 9 facade report signed — SWARMP
Latest 60 of 110 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedLYNX Builders07/30/2026
DOB NOWGeneral ConstructionPermit IssuedLYNX Builders07/29/2026
DOB NOWPlumbingSigned-offTitan Plumbing07/08/2026
DOB NOWGeneral ConstructionPermit IssuedShamas Contracting Co10/24/2024
DOB NOWPlumbingSigned-offBest Mechanical Services09/24/2024
DOB NOWPlumbingSigned-offHarold Headley Plumbing06/13/2024
DOB NOWGeneral ConstructionSigned-offTCS Construction05/22/2024
DOB NOWGeneral ConstructionPermit IssuedShamas Contracting Co11/16/2023
DOB NOWMechanical SystemsPermit IssuedShamas Contracting Co11/14/2023
DOB NOWGeneral ConstructionSigned-offKay Waterproofing06/09/2023
DOB NOWGeneral ConstructionPermit IssuedMega Art Home Improvement04/24/2023
DOB NOWPlumbingSigned-offCape Plumbing04/06/2023
DOB NOWGeneral ConstructionPermit IssuedLYNX Builders02/16/2023
DOB NOWGeneral ConstructionSigned-offKay Waterproofing06/23/2022
DOB NOWSidewalk ShedSigned-offPlatinum Services NY06/07/2022
BISEQISSUEDEverest Scaffolding10/30/2018
BISEQISSUEDRock Group NY07/03/2018
BISOTISSUEDKay Waterproofing02/05/2018
BISEQISSUEDEverest Scaffolding11/08/2017
BISOTISSUEDKay Waterproofing08/31/2017
BISEQISSUEDRock Group NY07/25/2017
BISEQISSUEDEverest Scaffolding11/21/2016
BISPLISSUEDVMC Plumbing & Heating02/11/2016
BISOTISSUEDGreen Army Men12/22/2015
BISOTISSUEDBay Ridge Window & Door12/16/2015
BISOTISSUEDHudson Green Craft12/08/2015
BISMHISSUEDGreen Army Men12/07/2015
BISPLISSUEDWalter J.grande P & H06/19/2015
BISMHISSUEDWest Street Interiors05/20/2015
BISOTISSUEDKay Waterproofing01/26/2015
BISEQISSUEDRock Group NY10/07/2014
BISOTISSUEDKay Waterproofing07/07/2014
BISOTISSUEDAM Building Maintenance08/28/2007
BISEQISSUEDS&E Bridge & Scaffold07/23/2007
BISEQISSUEDRockledge Scaffold07/12/2005
BISOTISSUEDDJM Restoration07/12/2005
BISEQISSUEDAdvanced Installation06/23/2005
BISEQISSUEDAdvanced Installation06/23/2005
BISOTISSUEDClancy Consttuction07/30/2003
BISPLISSUEDR.J.C. Mechanical03/25/2002
+ 4 more permits on file
1 project · most recent 11/08/2022
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/08/2022Permit IssuedLYNX BuildersVentilation Systems
Ventilation
Panasonic FV-10NLF1E 120 CFM · Exhaust Fan ×3
2 projects · most recent 06/30/2026
Water/Sanitary Gas
FiledStatusContractorScope
06/30/2026Signed-offTitan PlumbingWater/Sanitary
05/31/2024Signed-offHarold Headley PlumbingGas, Water/Sanitary
5 projects · most recent 10/24/2024
General Wiring
FiledStatusContractorScope
10/24/2024CompleteAE ElectricGeneral Wiring
06/21/2024Permit IssuedLife Spot ElectricGeneral Wiring
05/29/2024Permit IssuedNew Century Electrical ContractingGeneral Wiring
02/25/2023CompleteAE ElectricGeneral Wiring
05/16/2022CompleteIlluminous ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/02/2024Fail-Final General Construction Non-Directive 14FailView ↗
10/04/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
07/31/2025FinalJohn Alleyneprogress
09/09/2024FinalJohn Alleyneprogress
05/31/2024Energy Code Compliance InspectionsNaeem Anwarprogress
05/31/2024HVAC-R and service water piping design and insulationNaeem Anwarenergy_progress
05/15/2024Energy Code Compliance InspectionsNaeem Anwarprogress
05/15/2024HVAC-R and service water piping design and insulationNaeem Anwarenergy_progress
10/19/2022Fire-Resistant Penetrations and JointsNaeem Anwarspecial
09/15/2022Energy Code Compliance InspectionsNaeem Anwarprogress
09/15/2022Interior lighting powerNaeem Anwarenergy_progress
09/15/2022Lighting in dwelling unitsNaeem Anwarenergy_progress
09/12/2022Mechanical SystemsNaeem Anwarspecial
09/12/2022FinalNaeem Anwarprogress
04/15/2022FinalRoberta Levineprogress
04/15/2022MasonryRoberta Levinespecial
▾Documents — 240 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
09/02/2026M00719893-I1Request digital key ↗
09/02/2026M00738339-I1Request digital key ↗
09/01/2026M08004307-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits46
▸BISWORK PERMIT APPLICATION19
10/31/2018122951831Open ↗
02/05/2018123123976Open ↗
11/09/2017122951831Open ↗
Showing 3 of 19 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION16
04/16/2024122607884Open ↗
07/25/2018123123976Open ↗
07/05/2018123123976Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWLPC Approval/Permit11
08/16/2026M01418862-I1Open ↗
08/13/2026M01049950-P1Open ↗
08/13/2026M00803938-I1Open ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications65
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION25
07/01/2019122951831Open ↗
01/30/2019140668944Open ↗
07/03/2018140668944Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/02/2026M00738339-I1Open ↗
09/01/2026M08004307-P1Open ↗
09/01/2026M08004307-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026M08004307-I1Open ↗
09/01/2026M08004307-I1Open ↗
09/01/2026M01049950-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
08/25/2017123123976Open ↗
07/22/2017140668944Open ↗
11/25/2016122951831Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
08/25/2017123123976Open ↗
11/25/2016122951831Open ↗
12/02/2015122607884Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/25/2026M08002356-I1Open ↗
08/25/2026M08002356-I1Open ↗
08/24/2026M00719893-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
07/22/2017140668944Open ↗
12/04/2015140436883Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
07/22/2017140668944Open ↗
12/04/2015140436883Open ↗
▸Trade Schedules & Equipment8
▸BISSELF-CERT PLUMBING NOTICE2
12/30/2015122248424Open ↗
10/07/2015122248424Open ↗
▸BISEQUIPMENT USE PERMITS2
11/10/2016140436883Open ↗
11/10/2016140436883Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
08/03/2015122248424Open ↗
05/07/2015122248424Open ↗
▸BISSCHEDULE B - PLUMBING1
12/04/2015140436883Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
12/05/2016140436883Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
08/25/2017123123976Open ↗
11/25/2016122951831Open ↗
07/22/2017140668944Open ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/01/2026M08004307-P1Open ↗
09/01/2026M08004307-I1Open ↗
09/01/2026M08053183-I1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
08/25/2017123123976Open ↗
07/22/2017140668944Open ↗
12/04/2015140436883Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance23
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
02/22/2019123123976Open ↗
08/25/2017123123976Open ↗
12/16/2016140436883Open ↗
Showing 3 of 13 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
08/01/2024122607884Open ↗
02/22/2019123123976Open ↗
12/16/2016140436883Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/04/2015140436883Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/04/2015140436883Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY4
08/01/2024122607884Open ↗
06/12/2024122607884Open ↗
07/22/2017140668944Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
02/22/2019123123976Open ↗
▸Approvals, Objections & Sign-offs16
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
08/02/2024122607884Open ↗
07/01/2019122951831Open ↗
02/22/2019123123976Open ↗
Showing 3 of 10 on file for this type
▸BISSHED LETTER3
10/31/2018122951831Open ↗
10/31/2018122951831Open ↗
11/09/2017122951831Open ↗
▸BISLANDMARKS APPROVAL2
08/28/2017123123976Open ↗
07/25/2017140668944Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/05/2016140436883Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT15
08/01/2024122607884Open ↗
02/22/2019123123976Open ↗
08/25/2017123123976Open ↗
Showing 3 of 15 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
01/11/2016122040665Open ↗
12/04/2015140436883Open ↗
▸Filing & Intake Forms23
▸BISADDITIONAL INFORMATION8
07/25/2018123123976Open ↗
07/03/2018140668944Open ↗
07/03/2018140668944Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET8
08/25/2017123123976Open ↗
11/25/2016122951831Open ↗
12/02/2015122607884Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM5
07/01/2019122951831Open ↗
02/22/2019123123976Open ↗
01/30/2019140668944Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
07/22/2017140668944Open ↗
12/04/2015140436883Open ↗
▸Other Documents3
▸BISSupporting Document: Fee Deferment1
12/16/2016140436883Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
04/14/2014121974051Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026M08053183-I1Open ↗