Two family frame
6031 TYNDALL AVENUE
BRONX · Riverdale-Spuyten Duyvil · BIN 2085446
💬 Discuss this project
1901Year Built
2.5Stories
B2Building Class
R3AZoning
3,328 sfGross Floor Area
2Units
Two family frame · 3,555 sf lot · 0.94 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Roof2p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOM PETERSEN ARCHITECT, LLC112/05/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SOLAR ELEC CONTRACTNG LLCElectrical103/22/2026
SOLAR CONTRACTING LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854112/05/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
05/08/2026
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.
X01328954-I1
01/09/2026
Permit issued — Solar
X01328954-I1-SL
12/05/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.
X01328954-I1
12/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
12/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
12/04/2025
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
12/04/2025
Special inspection requirement — Final
TOM PETERSEN
12/04/2025
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSOLAR CONTRACTING LLC01/09/2026
2 projects · most recent 04/23/2026
FiledStatusContractorScope
04/23/2026CompleteSOLAR ELEC CONTRACTNG LLC—
12/11/2025CompleteSOLAR ELEC CONTRACTNG LLC2 meters
1 project · most recent 12/05/2025
FiledStatusContractorScope
12/05/2025Signed-offSOLAR CONTRACTING LLC104 panels, 44.72 kw, 1,093.02 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/04/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
12/04/2025Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
12/04/2025Energy Code Compliance InspectionsTOM PETERSENprogress
12/04/2025FinalTOM PETERSENprogress
12/04/2025Air barrier - visual inspectionTOM PETERSENenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026X01328954-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/16/2026X01328954-I1Open ↗
09/16/2026X01328954-I1Open ↗
09/16/2026X01328954-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/16/2026X01328954-I1Open ↗
09/16/2026X01328954-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026X01328954-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026X01328954-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/17/2026X01328954-I1Open ↗