Elevator apt, semi-fireproof with stores
605 WEST 170TH STREET
MANHATTAN · BIN 1063474
💬 Discuss this project
1922Year Built
6Stories
D7Building Class
R8Zoning
70,920 sfGross Floor Area
64Units
LL97 CoveredRent Stabilized4 Active Violations ▸FISP: SWARMP
Elevator apt, semi-fireproof with stores · Owner of record: Building 605 West 170th Street · 15,093 sf lot · 4.7 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingEquipmentLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofBldg Management CO., INC.15p · 2 filings · 18 docs
Floor 6Unit PH414p · 1 filing · 14 docs
Floor 5Bldg Management CO., INC.14p · 1 filing · 14 docs
Floor 4Unit 4H19p · 3 filings · 20 docs
Floor 3Bldg Management CO., INC.14p · 1 filing · 14 docs
Floor 2Bldg Management CO., INC.14p · 1 filing · 14 docs
Floor 1Bldg Management CO., INC.Under Construction28p · 6 filings · 20 docs
Site & exteriorBldg Management CO., INC.20p · 4 filings · 20 docs
Filed — no permit issuedCafe Prime1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New Gold Equities903/21/2026
IG Greenpoint903/21/2026
Jerrick Associates707/08/2026
54-62 West 56 Realty303/21/2026
Building 605 West 170th Street103/22/2026
Popular Bank103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Aminov Design Engineering205/26/2026
SW Engineering Company301/30/2026
Asr Engineering104/04/2025
ZZ Architecture211/03/2021
Korman Design & Build108/11/2020
Sotir Associates303/03/2020
Leon Skvirsky PE111/28/2018
Scalar Architecture110/12/2018
Magnum Opus Architecture108/01/2018
Jung H. Choi, Architect101/25/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Building Brothers203/21/2026
A D Building Solutions203/21/2026
M M Building Expediting Services403/21/2026
Expediting103/21/2026
Boyd Consulting603/21/2026
Rigging Consultants203/21/2026
Kenny Lee Architect103/21/2026
AE Design Solution203/21/2026
Outsource Consultants203/21/2026
Youn Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Jerrick AssociatesScaffold407/08/2026
Macintosh ElectricElectrical203/21/2026
BalkanGeneral Contractor203/21/2026
DNA Plumbing ContractorsPlumbing207/08/2026
Khaika ConstructionGeneral Contractor207/08/2026
Mela Construction ConScaffold107/08/2026
Safetech EnterprisesScaffold107/08/2026
Going Sign & Servicing CoSign hanger107/08/2026
Neptune Signs & AwningsSign hanger107/08/2026
Blake Electric Contracting Co., IElectrical103/21/2026
Katan P & HPlumbing107/08/2026
Borrelli ElectricElectrical103/22/2026
Safetech EnterprisesGeneral Contractor104/09/2026
Sham Construction GroupGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Aminov Design Engineer, P9365205/26/2026
Crosscheck Inspection Services544301/30/2026
ZZ Architecture8687104/22/2025
Jack Green Associates422211/03/2021
Engineering Consulting SE2050102/10/2020
Building Lifecycle
All (156)Filed (17)Permit Issued (16)Signed Off (10)Facade (FISP) (16)Violation (60)Inspection (3)Objection (4)Special Inspection (30)
06/05/2026
Permit issued — Mechanical Systems
M01091226-I1-MS
05/27/2026
Special inspection requirement — Mechanical Systems
MARK AMINOV
05/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
MARK AMINOV
05/27/2026
Special inspection requirement — Maintenance information
MARK AMINOV
05/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
MARK AMINOV
05/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MARK AMINOV
05/27/2026
Special inspection requirement — Energy Code Compliance Inspections
MARK AMINOV
05/27/2026
Special inspection requirement — Final
MARK AMINOV
05/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
MARK AMINOV
05/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARK AMINOV
05/26/2026
Filed — Alteration
Application is filed to replace existing outdoor units with new outdoor units using existing ducts and the installation of new indoor splits as shown on plans. No change in use, occupancy, egress or bulk is proposed.
M01091226-P1
05/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
MARK AMINOV
05/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MARK AMINOV
05/19/2026
Special inspection requirement — Maintenance information
MARK AMINOV
05/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARK AMINOV
05/19/2026
Special inspection requirement — Mechanical Systems
MARK AMINOV
05/19/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/19/2026
Special inspection requirement — Energy Code Compliance Inspections
MARK AMINOV
05/19/2026
Special inspection requirement — Final
MARK AMINOV
05/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
MARK AMINOV
03/18/2026
Signed off — Alteration
Filing for limited exterior repairs. No change in use, egress, or occupancy.
M01204811-I1
02/03/2026
Special inspection requirement — Post-installed Anchors
EUGENE BIFULCO
02/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
Ziv Zamir
02/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
EUGENE BIFULCO
02/03/2026
Special inspection requirement — Masonry
EUGENE BIFULCO
02/03/2026
Special inspection requirement — Final
Levon Shaginyan
01/30/2026
Filed — Alteration
Filing for limited exterior repairs. No change in use, egress, or occupancy.
M01204811-P2
01/27/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
EUGENE BIFULCO
01/27/2026
Special inspection requirement — Masonry
EUGENE BIFULCO
01/27/2026
Special inspection requirement — Final
Levon Shaginyan
01/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/27/2026
Special inspection requirement — Post-installed Anchors
EUGENE BIFULCO
01/15/2026
Signed off — Alteration
M01205773-I1
01/15/2026
Signed off — Alteration
Facade Repair Via Suspended Scaffolding
M01213273-I1
09/05/2025
Permit issued — Suspended Scaffold
M01213273-I1-SC
07/18/2025
Permit issued — General Construction
M01204811-I1-GC
07/01/2025
Filed — Alteration
Filing for limited exterior repairs. No change in use, egress, or occupancy.
M01204811-P1
05/30/2025
Permit issued — Mechanical Systems
M01091226-I1-MS
04/30/2025
Permit issued — Suspended Scaffold
M01213273-I1-SC
04/28/2025
Objection raised — Scope
04/28/2025
Objection resolved — Addressed
04/28/2025
Objection resolved — Addressed
04/24/2025
Objection raised — Other
04/22/2025
Filed — Alteration
Filing for limited exterior repairs. No change in use, egress, or occupancy.
M01204811-I1
04/21/2025
Filed — Alteration
Facade Repair Via Suspended Scaffolding
M01213273-I1
04/21/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Walsh
04/04/2025
Filed — Alteration
M01205773-I1
04/04/2025
Permit issued — Sidewalk Shed
M01205773-I1-SH
11/18/2024
Filed — Alteration
Application is filed to replace existing outdoor units with new outdoor units using existing ducts and the installation of new indoor splits as shown on plans. No change in use, occupancy, egress or bulk is proposed.
M01091226-I1
07/25/2024
Violation issued (HPD, closed)
C
07/25/2024
Violation issued (HPD, closed)
C
06/24/2024
Signed off — Alteration
DUCT WORK FOR (2) NEW COMMERCIAL HOODS AND (2) COMPRESSORS FOR SPLIT COOLING UNITS, AND REPLACE (1) COMPRESSOR OF EXISTING HVAC UNIT FOR EXISTING RESTAURANT ON FIRST FLOOR.
M00290062-I1
05/04/2023
Cycle 9 facade report submitted
05/04/2023
Cycle 9 facade report signed — SWARMP
04/03/2023
Cycle 9 facade inspection completed
04/27/2022
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING APARTMENT 4H INCLUDING REMOVAL OF NON-LOAD BEARING PARTITIONS, NEW FLOORING AND FINISHES. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M00609417-I1
04/26/2022
Signed off — Alteration
INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00616495-I1
04/20/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/18/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/06/2022
Violation issued (HPD, closed)
B
Latest 60 of 156 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedKhaika Construction06/05/2026
DOB NOWSuspended ScaffoldSigned-offSafetech Enterprises09/05/2025
DOB NOWGeneral ConstructionSigned-offSafetech Enterprises07/18/2025
DOB NOWMechanical SystemsPermit IssuedKhaika Construction05/30/2025
DOB NOWSuspended ScaffoldSigned-offSafetech Enterprises04/30/2025
DOB NOWSidewalk ShedSigned-offSafetech Enterprises04/04/2025
DOB NOWPlumbingSigned-offDNA Plumbing Contractors11/30/2021
DOB NOWGeneral ConstructionSigned-offBalkan11/19/2021
DOB NOWSidewalk ShedSigned-offGE 2A Construction03/20/2020
DOB NOWMechanical SystemsSigned-offSham Construction Group02/12/2020
DOB NOWPlumbingPermit IssuedKatan P & H01/22/2020
DOB NOWSidewalk ShedSigned-offGE 2A Construction09/12/2019
DOB NOWSignSigned-offPolsinelli, Henry11/30/2018
DOB NOWSidewalk ShedSigned-offGE 2A Construction10/15/2018
DOB NOWConstruction FenceSigned-offMela Construction Con08/02/2018
DOB NOWSignSigned-offNeptune Signs & Awnings03/06/2018
BISOTISSUEDSham Construction Group12/31/2019
BISPLISSUEDRRP Plumbing08/03/2018
BISMHISSUEDMela Construction Con07/09/2018
BISOTISSUEDMela Construction Con07/09/2018
BISPLISSUEDFlint Mechanical05/16/2018
BISOTISSUEDRJB Contracting Carting03/01/2018
BISOTISSUEDHI Tech Construction & *08/22/2014
BISEQISSUEDJerrick Associates07/05/2014
BISPLISSUEDGW Mechanical10/11/2013
BISOTISSUEDHI Tech Construction & *09/26/2013
BISOTISSUEDAbilene08/22/2013
BISFSISSUEDAbilene12/24/2012
BISPLISSUEDBell Fuel Oil12/24/2012
BISPLISSUEDGanic Plumbing & Heating01/31/2008
BISPLISSUEDP.S.I. Mechanical01/25/2008
BISOTISSUEDShom 1 Construction12/18/2007
BISPLISSUEDPremier Pipe Solutions12/04/2007
BISFPISSUEDMaster Fire Prevention System10/19/2007
BISPLISSUEDDNA Plumbing Contractors10/10/2007
BISEQISSUEDArsenal Scaffold01/02/2007
BISOTISSUEDNY Connecticut Development11/28/2006
BISEQISSUEDArsenal Scaffold10/13/2006
BISOTRE-ISSUEDBalkan10/06/2005
BISOTISSUEDNew Peoples Construction06/07/2005
+ 15 more permits on file
1 project · most recent 05/26/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/26/2026Permit IssuedKhaika ConstructionHeating and Air Conditioning Systems
Heat / Cool
Cooper & Hunter CH-R36LCU-230VO 36,000 BTU · Condensing Unit ×2
Daikin 4MXM36AVJU9 36,000 BTU · Heat Pump Outdoor ×2
1 project · most recent 03/03/2020
Gas Water/Sanitary
FiledStatusContractorScope
03/03/2020Permit IssuedKatan P & HGas, Water/Sanitary
8 projects · most recent 04/05/2025
General Wiring
FiledStatusContractorScope
04/05/2025CompleteRichard Neu—
11/30/2021CompleteMacintosh ElectricGeneral Wiring
07/01/2020CompleteJong Hyun Kim—
12/17/2019Permit IssuedI.S.M. ElectricGeneral Wiring
12/20/2018Permit IssuedThe Going Servicing Co—
10/12/2018CompleteBorowide Elect'l Contractors—
07/31/2018CompleteBorrelli ElectricGeneral Wiring
01/07/2018CompleteJong Hyun Kim—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/20/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/18/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/06/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
05/27/2026Mechanical SystemsMARK AMINOVspecial
05/27/2026Tenant Protection Plan ComplianceMARK AMINOVspecial
05/27/2026Maintenance informationMARK AMINOVenergy_progress
05/27/2026HVAC-R and service water heating equipmentMARK AMINOVenergy_progress
05/27/2026HVAC-R and service water piping design and insulationMARK AMINOVenergy_progress
05/27/2026Energy Code Compliance InspectionsMARK AMINOVprogress
05/27/2026FinalMARK AMINOVprogress
05/27/2026HVAC-R and service water heating system controlsMARK AMINOVenergy_progress
05/27/2026Fire-Resistant Penetrations and JointsMARK AMINOVspecial
05/19/2026HVAC-R and service water heating system controlsMARK AMINOVenergy_progress
05/19/2026HVAC-R and service water piping design and insulationMARK AMINOVenergy_progress
05/19/2026Maintenance informationMARK AMINOVenergy_progress
05/19/2026Fire-Resistant Penetrations and JointsMARK AMINOVspecial
05/19/2026Mechanical SystemsMARK AMINOVspecial
05/19/2026Tenant Protection Plan Compliance—special
05/19/2026Energy Code Compliance InspectionsMARK AMINOVprogress
05/19/2026FinalMARK AMINOVprogress
05/19/2026HVAC-R and service water heating equipmentMARK AMINOVenergy_progress
02/03/2026Post-installed AnchorsEUGENE BIFULCOspecial
02/03/2026Tenant Protection Plan ComplianceZiv Zamirspecial
02/03/2026Structural Stability – Alterations of existing buildingsEUGENE BIFULCOspecial
02/03/2026MasonryEUGENE BIFULCOspecial
02/03/2026FinalLevon Shaginyanprogress
01/27/2026Structural Stability – Alterations of existing buildingsEUGENE BIFULCOspecial
01/27/2026MasonryEUGENE BIFULCOspecial
Latest 25 of 34.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Cafe PrimeRestaurant / Food ServiceFloor 1
Project M00308615 Alteration · Approved · 08/11/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 239 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch13
09/06/2026M00010811-I1Request digital key ↗
09/06/2026M00046849-I1Request digital key ↗
09/06/2026M00086473-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00282899-I1Request digital key ↗
08/15/2026M00282899-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/04/2026M00308615-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00290062-I1Request digital key ↗
▸Applications & Permits37
▸BISWORK PERMIT APPLICATION20
12/30/2019140882258Open ↗
10/11/2019123690773Open ↗
08/22/2019123690773Open ↗
Showing 3 of 20 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION17
11/23/2020123690773Open ↗
11/09/2020123690773Open ↗
11/04/2020123690773Open ↗
Showing 3 of 17 on file for this type
▸Seals & Professional Certifications78
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION21
09/06/2019123376104Open ↗
09/06/2019123376104Open ↗
09/06/2019123376104Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/06/2026M00010811-I1Open ↗
09/06/2026M00087989-I1Open ↗
09/05/2026M00290062-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/27/2026M00087989-I1Open ↗
09/02/2026M01091226-P1Open ↗
09/02/2026M01091226-P1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
12/30/2019140882258Open ↗
08/22/2019123690773Open ↗
06/24/2019140856447Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026M01091226-P1Open ↗
09/01/2026M01204811-I1Open ↗
09/01/2026M01204811-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
08/22/2019123690773Open ↗
07/09/2018123376104Open ↗
02/26/2018123357955Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
12/30/2019140882258Open ↗
06/24/2019140856447Open ↗
07/03/2014140220909Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
12/30/2019140882258Open ↗
06/24/2019140856447Open ↗
07/03/2014140220909Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
12/26/2012121470817Open ↗
12/11/2007110054459Open ↗
▸BISPC FULL REPORT1
12/11/2007110054459Open ↗
▸Trade Schedules & Equipment12
▸BISSELF-CERT PLUMBING NOTICE4
11/27/2013121470817Open ↗
11/21/2013121470817Open ↗
05/24/2013121470817Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING2
10/04/2013121792113Open ↗
12/26/2012121470817Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
07/09/2018123376104Open ↗
02/26/2018123357955Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
05/24/2013121470817Open ↗
▸BISEQUIPMENT USE PERMITS1
08/30/2019123376104Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
08/30/2019123376104Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
12/26/2012121470817Open ↗
▸Safety & Tenant Protection8
▸BISTenant Protection Plan and Notes4
08/22/2019123690773Open ↗
07/09/2018123376104Open ↗
12/30/2019140882258Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTenant Protection Plan4
09/05/2026M00290062-I1Open ↗
08/13/2026M00282899-P1Open ↗
08/13/2026M00308615-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/06/2026M00087989-I1Open ↗
09/05/2026M00290062-I1Open ↗
09/03/2026M00616495-I1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
12/30/2019140882258Open ↗
06/24/2019140856447Open ↗
07/09/2018123376104Open ↗
Showing 3 of 5 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
08/22/2019123690773Open ↗
02/26/2018123357955Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/11/2007110054459Open ↗
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
09/06/2019123376104Open ↗
09/06/2019123376104Open ↗
08/22/2019123690773Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
09/06/2019123376104Open ↗
05/30/2018123357955Open ↗
04/20/2015121470817Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
12/03/2020123690773Open ↗
12/30/2019140882258Open ↗
06/24/2019140856447Open ↗
▸BISTR8: Energy Code Progress Inspections2
12/26/2012121470817Open ↗
12/26/2012121470817Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
12/30/2019140882258Open ↗
06/24/2019140856447Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
07/03/2014140220909Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/03/2020123690773Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00609417-I1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY5
12/03/2020123690773Open ↗
12/30/2019140882258Open ↗
12/30/2019140882258Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
09/06/2019123376104Open ↗
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
12/03/2020123690773Open ↗
09/06/2019123376104Open ↗
05/30/2018123357955Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/20/2015121470817Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
12/11/2007110054459Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT14
11/04/2020123690773Open ↗
12/30/2019140882258Open ↗
09/06/2019123376104Open ↗
Showing 3 of 14 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
12/03/2020123690773Open ↗
▸Filing & Intake Forms17
▸BISBOROUGH INTAKE FORM6
01/16/2020140882258Open ↗
09/06/2019123376104Open ↗
06/19/2019123376104Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET6
08/22/2019123690773Open ↗
07/09/2018123376104Open ↗
07/09/2018123376104Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
12/30/2019140882258Open ↗
06/24/2019140856447Open ↗
07/03/2014140220909Open ↗
▸BISADDITIONAL INFORMATION2
11/23/2020123690773Open ↗
04/09/2015121470817Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026M01213273-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01213273-I1Open ↗