Two family brick
605 WEST 187 STREET
MANHATTAN · Washington Heights (North) · BIN 1064003
💬 Discuss this project
1910Year Built
3Stories
B1Building Class
R7-2Zoning
3,096 sfGross Floor Area
2Units
0 Open Violations
Two family brick · Owner of record: DIVINE 187 LLC · 1,881 sf lot · 1.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof14p · 3 filings · 20 docs
Floor 321p · 3 filings · 20 docs
Floor 221p · 3 filings · 20 docs
Floor 120p · 3 filings · 20 docs
Basement1p · 1 filing · 8 docs
Sub-Basement20p · 3 filings · 20 docs
Site & exterior15p · 1 filing · 20 docs
Filed — no permit issued8p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DIVINE 187203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/11/2019$775K—— → —$250/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
COLOMBO ARCHITECTURAL STUDIO PC1103/30/2023
FRANZ SEBORGA112/13/2021
CENTURY TESTING & CONSULTING111/06/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XPDITE GROUP LLC (104)903/21/2026
COLOMBO ARCHITECTURAL STUDIO P C403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEST CONTRACTING CORPGeneral Contractor1107/08/2026
MUHAMMAD MUNIRElectrical803/21/2026
DOVAL PLBG & HTG CORPFire Protection207/08/2026
DOVAL PLBG & HTG CORPPlumbing207/08/2026
MAGIC ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
COLOMBO ARCHITECTURAL STU4930603/30/2023
JOSE A SANTOS PE, PC3292201/24/2023
HRF SERVICES CORP5616206/24/2022
CENTURY TESTING & CONSULT4081111/06/2019
Building Lifecycle
All (117)Filed (13)Permit Issued (9)Signed Off (5)Violation (24)Inspection (8)Objection (28)Special Inspection (30)
06/11/2024
Signed off — Alteration
Plumbing work in connection with alteration type 1 application 125885199.
M00253043-S1
09/19/2023
Signed off — Alteration
Plumbing work in connection with alteration type 1 application 125885199.
M00253043-S2
09/18/2023
Signed off — Alteration
Structural Work in connection with Alternation 1 Application#123885199. All fees for additional square footage and partial demolition work paid under Alteration 1 Application #123885199.
M00641697-I1
08/21/2023
Signed off — Alteration
Plumbing work in connection with alteration type 1 application 125885199.
M00253043-I1
04/24/2023
Signed off — Alteration
Installation of wet pipe sprinkler system in connection with alteration 123885199.
M00253057-I1
04/04/2023
Special inspection requirement — Energy Code Compliance Inspections
Yahaira Volquez Colombo
04/04/2023
Special inspection requirement — HVAC and service water heating system controls
Yahaira Volquez Colombo
04/04/2023
Special inspection requirement — HVAC insulation and sealing
Yahaira Volquez Colombo
04/04/2023
Special inspection requirement — Maintenance information
Yahaira Volquez Colombo
04/04/2023
Special inspection requirement — HVAC and service water heating equipment
Yahaira Volquez Colombo
04/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yahaira Volquez Colombo
03/30/2023
Filed — Alteration
Plumbing work in connection with alteration type 1 application 125885199.
M00253043-P5
03/30/2023
Special inspection requirement — HVAC insulation and sealing
Yahaira Volquez Colombo
03/30/2023
Special inspection requirement — HVAC and service water heating equipment
Yahaira Volquez Colombo
03/30/2023
Special inspection requirement — Maintenance information
Yahaira Volquez Colombo
03/30/2023
Special inspection requirement — HVAC and service water heating system controls
Yahaira Volquez Colombo
03/30/2023
Special inspection requirement — Energy Code Compliance Inspections
Yahaira Volquez Colombo
03/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yahaira Volquez Colombo
03/21/2023
Filed — Alteration
Plumbing work in connection with alteration type 1 application 125885199.
M00253043-P4
03/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yahaira Volquez Colombo
03/21/2023
Special inspection requirement — Energy Code Compliance Inspections
Yahaira Volquez Colombo
03/21/2023
Special inspection requirement — HVAC insulation and sealing
Yahaira Volquez Colombo
03/21/2023
Special inspection requirement — HVAC and service water heating equipment
Yahaira Volquez Colombo
03/21/2023
Special inspection requirement — HVAC and service water heating system controls
Yahaira Volquez Colombo
03/21/2023
Special inspection requirement — Maintenance information
Yahaira Volquez Colombo
03/15/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/10/2023
Permit issued — Plumbing
M00253043-I1-PL
03/10/2023
Permit issued — Sprinklers
M00253057-I1-EW-SP
02/22/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/09/2023
Filed — Alteration
Plumbing work in connection with alteration type 1 application 125885199.
M00253043-P3
02/09/2023
Special inspection requirement — Energy Code Compliance Inspections
Yahaira Volquez Colombo
02/09/2023
Special inspection requirement — HVAC and service water heating equipment
Yahaira Volquez Colombo
02/09/2023
Special inspection requirement — HVAC and service water heating system controls
Yahaira Volquez Colombo
02/09/2023
Special inspection requirement — Maintenance information
Yahaira Volquez Colombo
02/09/2023
Special inspection requirement — HVAC insulation and sealing
Yahaira Volquez Colombo
02/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yahaira Volquez Colombo
01/31/2023
Permit issued — Mechanical Systems
M00253043-S2-MS
01/24/2023
Filed — Alteration
Plumbing work in connection with alteration type 1 application 125885199.
M00253043-S2
01/21/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/21/2023
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
01/09/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/02/2022
Violation issued (ECB, closed)
Construction
07/29/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/29/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/24/2022
Filed — Alteration
Installation of wet pipe sprinkler system in connection with alteration 123885199.
M00253057-P1
06/24/2022
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
06/23/2022
Filed — Alteration
Plumbing work in connection with alteration type 1 application 125885199.
M00253043-P2
05/17/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/31/2022
Permit issued — Construction Fence
M00253043-S1-FN
01/31/2022
Permit issued — Structural
M00641697-I1-ST
01/18/2022
Violation issued (ECB, closed)
Unknown
01/13/2022
Violation issued (ECB, closed)
Construction
01/05/2022
Permit issued — Structural
M00641697-I1-ST
12/13/2021
Filed — Alteration
Structural Work in connection with Alternation 1 Application#123885199. All fees for additional square footage and partial demolition work paid under Alteration 1 Application #123885199.
M00641697-I1
10/28/2021
Permit issued — Plumbing
M00253043-I1-PL
10/27/2021
Permit issued — Sprinklers
M00253057-I1-EW-SP
09/17/2021
Permit issued — Construction Fence
M00253043-S1-FN
09/16/2021
Filed — Alteration
Plumbing work in connection with alteration type 1 application 125885199.
M00253043-S1
02/28/2020
Filed — Alteration
Plumbing work in connection with alteration type 1 application 125885199.
M00253043-P1
02/28/2020
Objection raised — Other
Latest 60 of 117 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDOVAL PLBG & HTG CORP03/10/2023
DOB NOWSprinklersSigned-offDOVAL PLBG & HTG CORP03/10/2023
DOB NOWMechanical SystemsSigned-offBEST CONTRACTING CORP01/31/2023
DOB NOWConstruction FenceSigned-offBEST CONTRACTING CORP01/31/2022
DOB NOWStructuralPermit IssuedBEST CONTRACTING CORP01/31/2022
DOB NOWStructuralPermit IssuedBEST CONTRACTING CORP01/05/2022
DOB NOWPlumbingSigned-offDOVAL PLBG & HTG CORP10/28/2021
DOB NOWSprinklersSigned-offDOVAL PLBG & HTG CORP10/27/2021
DOB NOWConstruction FenceSigned-offBEST CONTRACTING CORP09/17/2021
BIS—ISSUEDBEST CONTRACTING CORP01/31/2022
BIS—ISSUEDBEST CONTRACTING CORP09/07/2021
BISPLISSUEDGREGG NY PLUMBING, INC06/01/2018
BISOTISSUEDNYC ELEGANT IMPROVEMENTS07/20/2017
BISOTISSUEDN/A07/01/1996
1 project · most recent 11/19/2019
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/19/2019——Air Conditioning Systems
Cooling
Mitsubishi Electric MXZ-3C30NAHZ 24,000 BTU · Split System ×7
1 project · most recent 04/10/2024
General Wiring
FiledStatusContractorScope
04/10/2024CompleteMAGIC ELECTRIC INCGeneral Wiring
1 project · most recent 11/06/2019
Concrete Masonry
FiledStatusContractorScope
11/06/2019——Concrete, Masonry
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/15/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/22/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/21/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/21/2023Certified Sprinkler - SP - RoughingCertifiedView ↗
01/09/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/29/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/29/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/17/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
04/04/2023Energy Code Compliance InspectionsYahaira Volquez Colomboprogress
04/04/2023HVAC and service water heating system controls Yahaira Volquez Colomboenergy_progress
04/04/2023HVAC insulation and sealing Yahaira Volquez Colomboenergy_progress
04/04/2023Maintenance informationYahaira Volquez Colomboenergy_progress
04/04/2023HVAC and service water heating equipment Yahaira Volquez Colomboenergy_progress
04/04/2023Fire-Resistant Penetrations and JointsYahaira Volquez Colombospecial
03/30/2023HVAC insulation and sealing Yahaira Volquez Colomboenergy_progress
03/30/2023HVAC and service water heating equipment Yahaira Volquez Colomboenergy_progress
03/30/2023Maintenance informationYahaira Volquez Colomboenergy_progress
03/30/2023HVAC and service water heating system controls Yahaira Volquez Colomboenergy_progress
03/30/2023Energy Code Compliance InspectionsYahaira Volquez Colomboprogress
03/30/2023Fire-Resistant Penetrations and JointsYahaira Volquez Colombospecial
03/21/2023Fire-Resistant Penetrations and JointsYahaira Volquez Colombospecial
03/21/2023Energy Code Compliance InspectionsYahaira Volquez Colomboprogress
03/21/2023HVAC insulation and sealing Yahaira Volquez Colomboenergy_progress
03/21/2023HVAC and service water heating equipment Yahaira Volquez Colomboenergy_progress
03/21/2023HVAC and service water heating system controls Yahaira Volquez Colomboenergy_progress
03/21/2023Maintenance informationYahaira Volquez Colomboenergy_progress
02/09/2023Energy Code Compliance InspectionsYahaira Volquez Colomboprogress
02/09/2023HVAC and service water heating equipment Yahaira Volquez Colomboenergy_progress
02/09/2023HVAC and service water heating system controls Yahaira Volquez Colomboenergy_progress
02/09/2023Maintenance informationYahaira Volquez Colomboenergy_progress
02/09/2023HVAC insulation and sealing Yahaira Volquez Colomboenergy_progress
02/09/2023Fire-Resistant Penetrations and JointsYahaira Volquez Colombospecial
06/24/2022Sprinkler SystemsFAHAD FATEHspecial
Latest 25 of 42.
▾Documents — 166 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch - Plumbing6
09/05/2026M00253043-P5Request digital key ↗
09/05/2026M00253043-P4Request digital key ↗
09/05/2026M00253043-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch3
09/05/2026M00253043-S2Request digital key ↗
09/05/2026M00253043-S1Request digital key ↗
09/03/2026M00641697-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/02/2026M00253057-P1Request digital key ↗
08/15/2026M00253057-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/14/2026M00253062-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00255964-I1Request digital key ↗
▸Applications & Permits24
▸BISPLAN / WORK APPROVAL APPLICATION16
12/11/2023123885199Open ↗
12/05/2023123885199Open ↗
11/20/2023123885199Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION5
02/09/2023123885199Open ↗
09/07/2021123885199Open ↗
07/24/2019123346726Open ↗
Showing 3 of 5 on file for this type
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
07/02/2021123885199Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
07/02/2021123885199Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/19/2023123885199Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISZONING DIAGRAM2
01/08/2020123885199Open ↗
01/08/2020123885199Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
01/17/2024123885199Open ↗
▸BISVERIFY TAX LOT1
08/29/2023123885199Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
12/12/2023123885199Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
01/17/2024123885199Open ↗
▸Seals & Professional Certifications37
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/05/2026M00255964-I1Open ↗
09/05/2026M00253062-I1Open ↗
09/05/2026M00253043-P2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/25/2026M00253043-P3Open ↗
09/25/2026M00253043-P3Open ↗
09/06/2026M00255964-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/25/2026M00253043-P3Open ↗
09/06/2026M00255964-I1Open ↗
09/06/2026M00255964-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
11/25/2019123885199Open ↗
10/04/2019123885199Open ↗
08/27/2019123346726Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/31/2017123346726Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/31/2017123346726Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/31/2017123346726Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
11/04/2019123885199Open ↗
07/31/2017123346726Open ↗
▸BISSTREET TREE SIGNOFF1
08/26/2023123885199Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
08/25/2023123885199Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/05/2026M00255964-I1Open ↗
09/05/2026M00253043-P2Open ↗
09/05/2026M00253043-P5Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/04/2019123885199Open ↗
07/31/2017123346726Open ↗
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
10/04/2019123885199Open ↗
08/27/2019123346726Open ↗
08/27/2019123346726Open ↗
Showing 3 of 4 on file for this type
▸BISINTERIOR LIGHTING POWER1
08/29/2023123885199Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/27/2019123346726Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
08/29/2023123885199Open ↗
▸BISFENESTRATION AREAS1
08/29/2023123885199Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
08/29/2023123885199Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/28/2021123885199Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
08/29/2023123885199Open ↗
▸BISLIGHTING IN DWELLING UNITS1
08/29/2023123885199Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/25/2023123885199Open ↗
▸BISLIGHTING CONTROLS1
08/29/2023123885199Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/29/2023123885199Open ↗
▸BISEXTERIOR LIGHTING POWER1
08/29/2023123885199Open ↗
▸BISFENESTRATION AIR LEAKAGE1
08/29/2023123885199Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
08/29/2023123885199Open ↗
▸Inspections & Test Reports9
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
08/25/2023123885199Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/25/2023123885199Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
08/25/2023123885199Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
08/25/2023123885199Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/07/2021123885199Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
08/27/2019123346726Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
11/25/2019123885199Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
08/25/2023123885199Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
12/14/2023123885199Open ↗
▸Approvals, Objections & Sign-offs14
▸BISSCHEDULE A - OCCUPANCY / USE8
12/11/2023123885199Open ↗
12/05/2023123885199Open ↗
11/20/2023123885199Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
10/03/2022123885199Open ↗
01/18/2022123885199Open ↗
▸BISMECHANICAL (MH) SIGNOFF1
12/05/2023123885199Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
04/27/2024123885199Open ↗
▸BISSUPERSEDING LETTER1
07/24/2019123346726Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/27/2019123346726Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT4
01/18/2022123885199Open ↗
10/04/2019123885199Open ↗
08/27/2019123346726Open ↗
Showing 3 of 4 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
08/06/2021123885199Open ↗
07/23/2021123885199Open ↗
▸BISDEPT OF FINANCE VERIFICATION2
11/04/2019123885199Open ↗
11/04/2019123885199Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
12/07/2023123885199Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
07/23/2021123885199Open ↗
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION7
12/13/2023123885199Open ↗
10/03/2022123885199Open ↗
06/30/2022123885199Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM3
02/15/2023123885199Open ↗
08/27/2019123346726Open ↗
02/04/2019123346726Open ↗
▸BISEFILING COVER SHEET2
10/04/2019123885199Open ↗
07/31/2017123346726Open ↗
▸Other Documents4
▸BISMAINTENANCE INFORMATION1
08/29/2023123885199Open ↗
▸BISPERMANENT CERTIFICATE1
08/29/2023123885199Open ↗
▸BISSTRUCTURAL S-O1
06/11/2024123885199Open ↗
▸BISPLOT DIAGRAM1
10/04/2019123885199Open ↗