Roof5p · 3 filings · 13 docs
EquipmentFire ProtectionMechanical
Temporary standpipe work in conjunction with NB # 121204874.
On file for this project
2 documents · 3 drawing sheets
Facade Repair
On file for this project
3 documents · 1 drawing sheet
SUSPENDED SCAFFOLD AS SHOWN ON PLANS
On file for this project
8 documents · 1 drawing sheet
Bulkhead4p · 2 filings · 11 docs
MechanicalStructural
Facade Repair
On file for this project
3 documents · 2 drawing sheets
SUSPENDED SCAFFOLD AS SHOWN ON PLANS
On file for this project
8 documents · 2 drawing sheets
Penthouse2p · 1 filing · 3 docs
Mechanical
Facade Repair
On file for this project
3 documents · 2 drawing sheets
Floor 451p · 1 filing · 20 docs
Fire Protection
PAA is being submitted to update the 21st and 44th floor fire pump to special service pump under scope of work tab as shown on previously approved plans.
On file for this project
25 documents · 1 drawing sheet
Floor 442p · 1 filing · 20 docs
Fire ProtectionGeneral
PAA is being submitted to update the 21st and 44th floor fire pump to special service pump under scope of work tab as shown on previously approved plans.
On file for this project
25 documents · 2 drawing sheets
Floor 431p · 1 filing · 20 docs
Fire Protection
PAA is being submitted to update the 21st and 44th floor fire pump to special service pump under scope of work tab as shown on previously approved plans.
On file for this project
25 documents · 1 drawing sheet
Floor 423p · 3 filings · 20 docs
CivilFire ProtectionGeneral
Temporary standpipe work in conjunction with NB # 121204874.
On file for this project
2 documents · 1 drawing sheet
PAA is being submitted to update the 21st and 44th floor fire pump to special service pump under scope of work tab as shown on previously approved plans.
On file for this project
25 documents · 1 drawing sheet
INSTALLATION OF DUAL 6500# CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEV APPL SUB TO ELEV DEPT.
On file for this project
14 documents · 1 drawing sheet
Floor 413p · 3 filings · 20 docs
ArchitectureFire ProtectionStructural
Temporary standpipe work in conjunction with NB # 121204874.
On file for this project
2 documents · 1 drawing sheet
PAA is being submitted to update the 21st and 44th floor fire pump to special service pump under scope of work tab as shown on previously approved plans.
On file for this project
25 documents · 1 drawing sheet
INSTALLATION OF DUAL 6500# CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEV APPL SUB TO ELEV DEPT.
On file for this project
14 documents · 1 drawing sheet
Floor 40
Floor 394p · 2 filings · 20 docs
Fire ProtectionStructural
Temporary standpipe work in conjunction with NB # 121204874.
On file for this project
2 documents · 1 drawing sheet
PAA is being submitted to update the 21st and 44th floor fire pump to special service pump under scope of work tab as shown on previously approved plans.
On file for this project
25 documents · 3 drawing sheets
Floor 38
Floor 37
Floor 36
Floor 35
Floor 343p · 1 filing · 20 docs
Fire ProtectionGeneral
PAA is being submitted to update the 21st and 44th floor fire pump to special service pump under scope of work tab as shown on previously approved plans.
On file for this project
25 documents · 3 drawing sheets
Floor 33
Floor 32
Floor 31
Floor 30
Floor 291p · 1 filing · 8 docs
Structural
SUSPENDED SCAFFOLD AS SHOWN ON PLANS
On file for this project
8 documents · 1 drawing sheet
Floor 282p · 1 filing · 3 docs
MechanicalStructural
Facade Repair
On file for this project
3 documents · 2 drawing sheets
Floor 271p · 2 filings · 20 docs
Fire Protection
Issued Permit Scope
Supported Scaffold
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
2 documents
PAA is being submitted to update the 21st and 44th floor fire pump to special service pump under scope of work tab as shown on previously approved plans.
On file for this project
25 documents · 1 drawing sheet
Floor 263p · 2 filings · 20 docs
Fire Protection
Issued Permit Scope
Supported Scaffold
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
2 documents
PAA is being submitted to update the 21st and 44th floor fire pump to special service pump under scope of work tab as shown on previously approved plans.
On file for this project
25 documents · 3 drawing sheets
Floor 251 filing · 2 docs
Issued Permit Scope
Supported Scaffold
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
2 documents
Floor 241 filing · 2 docs
Issued Permit Scope
Supported Scaffold
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
2 documents
Floor 231p · 2 filings · 20 docs
Fire Protection
Issued Permit Scope
Supported Scaffold
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
2 documents
PAA is being submitted to update the 21st and 44th floor fire pump to special service pump under scope of work tab as shown on previously approved plans.
On file for this project
25 documents · 1 drawing sheet
Floor 222p · 3 filings · 20 docs
Fire ProtectionStructural
Issued Permit Scope
Supported Scaffold
Temporary standpipe work in conjunction with NB # 121204874.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
2 documents
PAA is being submitted to update the 21st and 44th floor fire pump to special service pump under scope of work tab as shown on previously approved plans.
On file for this project
25 documents · 1 drawing sheet
Floor 212p · 2 filings · 20 docs
Fire ProtectionStructural
PAA is being submitted to update the 21st and 44th floor fire pump to special service pump under scope of work tab as shown on previously approved plans.
On file for this project
25 documents · 1 drawing sheet
INSTALLATION OF DUAL 6500# CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEV APPL SUB TO ELEV DEPT.
On file for this project
14 documents · 1 drawing sheet
Floor 202p · 1 filing · 20 docs
Fire Protection
PAA is being submitted to update the 21st and 44th floor fire pump to special service pump under scope of work tab as shown on previously approved plans.
On file for this project
25 documents · 2 drawing sheets
Floor 193p · 1 filing · 4 docs
General
This application is filed for a Temporary Use Permit for a sales office including model apartments pursuant to section AC 28-111 and Buildings Bulletin 2010-002. In conjunction with NB# 121204874
On file for this project
4 documents · 3 drawing sheets
Floor 18
Floor 17
Floor 165p · 2 filings · 20 docs
Fire ProtectionStructural
Temporary standpipe work in conjunction with NB # 121204874.
On file for this project
2 documents · 1 drawing sheet
PAA is being submitted to update the 21st and 44th floor fire pump to special service pump under scope of work tab as shown on previously approved plans.
On file for this project
25 documents · 4 drawing sheets
Floor 15
Floor 142p · 2 filings · 20 docs
CivilFire Protection
Temporary standpipe work in conjunction with NB # 121204874.
On file for this project
2 documents · 1 drawing sheet
PAA is being submitted to update the 21st and 44th floor fire pump to special service pump under scope of work tab as shown on previously approved plans.
On file for this project
25 documents · 1 drawing sheet
Floor 134p · 1 filing · 20 docs
Fire ProtectionGeneral
PAA is being submitted to update the 21st and 44th floor fire pump to special service pump under scope of work tab as shown on previously approved plans.
On file for this project
25 documents · 4 drawing sheets
Floor 12
Floor 111p · 1 filing · 4 docs
General
This application is filed for a Temporary Use Permit for a sales office including model apartments pursuant to section AC 28-111 and Buildings Bulletin 2010-002. In conjunction with NB# 121204874
On file for this project
4 documents · 1 drawing sheet
Floor 101p · 1 filing · 20 docs
Fire Protection
PAA is being submitted to update the 21st and 44th floor fire pump to special service pump under scope of work tab as shown on previously approved plans.
On file for this project
25 documents · 1 drawing sheet
Floor 9
Floor 8
Floor 7
Floor 61p · 1 filing · 20 docs
Fire Protection
PAA is being submitted to update the 21st and 44th floor fire pump to special service pump under scope of work tab as shown on previously approved plans.
On file for this project
25 documents · 1 drawing sheet
Floor 53p · 4 filings · 20 docs
ArchitectureFire Protection
Issued Permit Scope
Supported Scaffold
Temporary standpipe work in conjunction with NB # 121204874.
On file for this project
2 documents · 1 drawing sheet
PAA is being submitted to update the 21st and 44th floor fire pump to special service pump under scope of work tab as shown on previously approved plans.
On file for this project
25 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Latest 3 of 4 filings on this floor.
Floor 46p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalStructural
Issued Permit Scope
Supported Scaffold
Temporary standpipe work in conjunction with NB # 121204874.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION OF NEW BOILERS IN NEW BUILDING ON THE 46TH FLOOR. INSTALLATION OF NEW VENTS FOR BOILER FROM 46TH FLOOR TO ROOF. INSTALLATION OF DUCTED COMBUSTION AIR INTAKE TO BOILERS ON 46TH FLOOR.
On file for this project
11 documents · 2 drawing sheets
PAA is being submitted to update the 21st and 44th floor fire pump to special service pump under scope of work tab as shown on previously approved plans.
On file for this project
25 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 34p · 3 filings · 20 docs
Fire Protection
Issued Permit Scope
Supported Scaffold
Temporary standpipe work in conjunction with NB # 121204874.
On file for this project
2 documents · 1 drawing sheet
PAA is being submitted to update the 21st and 44th floor fire pump to special service pump under scope of work tab as shown on previously approved plans.
On file for this project
25 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 21p · 2 filings · 20 docs
Fire ProtectionGeneral
Issued Permit Scope
Supported Scaffold
PAA is being submitted to update the 21st and 44th floor fire pump to special service pump under scope of work tab as shown on previously approved plans.
On file for this project
25 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 12p · 1 filing · 20 docs
Fire ProtectionMechanicalPlumbing
PAA is being submitted to update the 21st and 44th floor fire pump to special service pump under scope of work tab as shown on previously approved plans.
On file for this project
25 documents · 2 drawing sheets
Mezzanine3p · 2 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Temporary standpipe work in conjunction with NB # 121204874.
On file for this project
2 documents · 1 drawing sheet
PAA is being submitted to update the 21st and 44th floor fire pump to special service pump under scope of work tab as shown on previously approved plans.
On file for this project
25 documents · 2 drawing sheets
Cellar2p · 2 filings · 20 docs
ArchitecturePlumbing
INSTALLATION OF DUAL 6500# CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEV APPL SUB TO ELEV DEPT.
On file for this project
14 documents · 1 drawing sheet
Underground plumbing work as shown on plans in conjunction with NB # 121204874.
On file for this project
8 documents · 1 drawing sheet