Two family brick
60-68 PALMETTO STREET
QUEENS · Ridgewood · BIN 4084884
💬 Discuss this project
1920Year Built
2Stories
B1Building Class
R5BZoning
3,492 sfGross Floor Area
2Units
Two family brick · 2,000 sf lot · 1.75 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 16p · 2 filings · 20 docs
CellarUnder Construction7p · 3 filings · 20 docs
BasementUnder Construction2p · 2 filings · 8 docs
Sub-BasementUnder Construction3p · 2 filings · 12 docs
Site & exteriorUnder Construction1p · 1 filing · 5 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/06/2022$1.0M—Private party → Private party$289/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LUKE LICALZI, P.E., P.C.408/14/2026
NMI ARCHITECTURE, PLLC611/08/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NMI ARCHITECTURE PLLC1203/21/2026
DYNAMIC BUILDING CONSULTANTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AKROB INCGeneral Contractor303/21/2026
BOXWOOD CONSTRUCTION LLCGeneral Contractor209/18/2026
EH PLUMBING & HEATING CORPlumbing107/08/2026
STARLITE PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JON LIBASCI3068408/14/2026
NMI ARCHITECTURE, PLLC6825611/08/2023
BLACK BOX ENGINEERING7196406/14/2023
Building Lifecycle
All (54)Filed (10)Permit Issued (5)Signed Off (2)Inspection (6)Objection (20)Special Inspection (11)
09/17/2026
Permit issued — Mechanical Systems
Q01417946-I1-MS
08/14/2026
Filed — Alteration
Respectfully request to relocate washer/dryer, laundry sink & install new shower. Replace toilet & bathroom sink. No change in use, egress, or occupancy.
Q01357469-P2
08/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
jon libasci
07/22/2026
Objection resolved — Resolved
07/21/2026
Objection resolved — Resolved
07/21/2026
Objection resolved — Resolved
07/21/2026
Objection resolved — Resolved
07/21/2026
Objection resolved — Resolved
07/16/2026
Objection raised — Other
07/16/2026
Objection raised — Other
07/16/2026
Objection raised — Other
07/16/2026
Objection raised — Other
07/16/2026
Objection raised — Other
07/07/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/30/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/22/2026
Filed — Alteration
Respectfully request to install mini spilt system as indicated on drawings. No change in use, egress, or occupancy.
Q01417946-I1
06/16/2026
Special inspection requirement — Mechanical Systems
jon libasci
06/16/2026
Special inspection requirement — Final
PAUL SELETSKY
06/05/2026
Permit issued — Plumbing
Q01357469-I1-PL
05/27/2026
Objection resolved — Addressed
05/13/2026
Permit issued — General Construction
Q01348923-I1-GC
05/08/2026
Objection resolved — Addressed
02/24/2026
Objection resolved — Addressed
02/24/2026
Objection resolved — Addressed
02/24/2026
Objection resolved — Addressed
02/22/2026
Objection raised — Inspections
02/22/2026
Objection raised — Mechanical
02/22/2026
Objection raised — Other
02/22/2026
Objection raised — Admin
02/22/2026
Objection raised — Scope
02/11/2026
Filed — Alteration
Respectfully request to relocate washer/dryer, laundry sink & install new shower. Replace toilet & bathroom sink. No change in use, egress, or occupancy.
Q01357469-I1
02/05/2026
Filed — Alteration
Q01348923-I1
02/16/2024
Signed off — Alteration
Q00807639-I1
02/15/2024
Signed off — Alteration
This job is filed to Legalize two fix bathroom, cap and remove the existing Tub as per RCA # 4918408 no change of use egress or occupancy
Q00886957-I1
02/15/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/18/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NASHAT IBRAHIM
11/08/2023
Filed — Alteration
This job is filed to Legalize two fix bathroom, cap and remove the existing Tub as per RCA # 4918408 no change of use egress or occupancy
Q00886957-P1
11/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NASHAT IBRAHIM
10/25/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/10/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/20/2023
Permit issued — Plumbing
Q00886957-I1-PL
06/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NASHAT IBRAHIM
06/29/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
David Bueno
06/27/2023
Filed — Alteration
This job is filed to Legalize two fix bathroom, cap and remove the existing Tub as per RCA # 4918408 no change of use egress or occupancy
Q00886957-I1
06/14/2023
Filed — Alteration
Q00807639-P3
04/03/2023
Filed — Alteration
Q00807639-P2
03/31/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
David Bueno
03/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NASHAT IBRAHIM
03/20/2023
Filed — Alteration
Q00807639-P1
03/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NASHAT IBRAHIM
03/16/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
David Bueno
03/06/2023
Permit issued — General Construction
Q00807639-I1-GC
01/19/2023
Filed — Alteration
Q00807639-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedBOXWOOD CONSTRUCTION LLC09/17/2026
DOB NOWPlumbingPermit IssuedSTARLITE PLUMBING CORP06/05/2026
DOB NOWGeneral ConstructionPermit IssuedBOXWOOD CONSTRUCTION LLC05/13/2026
DOB NOWPlumbingSigned-offEH PLUMBING & HEATING COR07/20/2023
DOB NOWGeneral ConstructionSigned-offAKROB INC03/06/2023
1 project · most recent 06/22/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/22/2026Permit IssuedBOXWOOD CONSTRUCTION LLCAir Conditioning Systems
Cooling
Mitsubishi Electric Mitsubishi MSZ-GX09NL 208 CFM · Split System ×3
1 project · most recent 08/14/2026
Water/Sanitary
FiledStatusContractorScope
08/14/2026Permit IssuedB-EZ PLUMBING & HTG CORPWater/Sanitary
3 projects · most recent 04/30/2024
General Wiring
FiledStatusContractorScope
04/30/2024CompleteE & M ELECTRICAL NY CORPGeneral Wiring
09/22/2023CompleteE & M ELECTRICAL NY CORPGeneral Wiring
02/20/2023CancelledE & M ELECTRICAL NY CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/07/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/30/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/15/2024Pass-Final General Construction Non-Directive 14PassView ↗
01/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
08/13/2026Fire-Resistant Penetrations and Jointsjon libascispecial
06/16/2026Mechanical Systemsjon libascispecial
06/16/2026FinalPAUL SELETSKYprogress
11/09/2023Fire-Resistant Penetrations and JointsNASHAT IBRAHIMspecial
11/08/2023Fire-Resistant Penetrations and JointsNASHAT IBRAHIMspecial
06/29/2023Fire-Resistant Penetrations and JointsNASHAT IBRAHIMspecial
06/29/2023Structural Stability – Alterations of existing buildingsDavid Buenospecial
03/31/2023Structural Stability – Alterations of existing buildingsDavid Buenospecial
03/31/2023Fire-Resistant Penetrations and JointsNASHAT IBRAHIMspecial
03/16/2023Fire-Resistant Penetrations and JointsNASHAT IBRAHIMspecial
03/16/2023Structural Stability – Alterations of existing buildingsDavid Buenospecial
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/25/2026Q00807639-P3Request digital key ↗
08/25/2026Q00807639-P2Request digital key ↗
08/25/2026Q00807639-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/25/2026Q00807639-P1Open ↗
08/25/2026Q00807639-P3Open ↗
08/25/2026Q00807639-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
08/31/2026Q01357469-P2Open ↗
08/30/2026Q00886957-I1Open ↗
08/28/2026Q00886957-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026Q01417946-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/25/2026Q00807639-P1Open ↗
08/25/2026Q00807639-P2Open ↗
08/25/2026Q00807639-I1Open ↗
Showing 3 of 10 on file for this type