| Owner | Filings | Most Recent |
|---|---|---|
| 200 WEST END AVE | 19 | 07/08/2026 |
| AURORA | 3 | 03/22/2026 |
| 100 WEST 18 ST CONDO | 7 | 03/22/2026 |
| HRH CONSTRUCTION | 13 | 03/22/2026 |
| GB DEVELOPMENT II | 9 | 03/22/2026 |
| GB DEVELOPMENT GROUP II | 30 | 03/22/2026 |
| 108 REALTY OF NY CORP | 3 | 03/22/2026 |
| 151 READE ST PARKINGCP | 9 | 03/22/2026 |
| PALYESS SHOESOURCE INC. | 1 | 03/22/2026 |
| BMW GARAGE INC. | 3 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| VALERIO ARCHITECTS | 2 | 08/21/2026 |
| KATZ ARCHITECTURE | 3 | 05/13/2026 |
| SCHNACKEL ENGINEERS | 5 | 04/17/2026 |
| ALAN R SCHWARTZ PE CONS ENG | 2 | 03/11/2026 |
| IW ARCHITECTURE, PLLC | 1 | 01/14/2026 |
| THE EIPEL ENGINEERING GROUP, D.P.C. | 1 | 01/06/2026 |
| T. LAPORTA ARCHITECT | 5 | 10/07/2025 |
| JT ENGINEERING, PC | 2 | 10/07/2025 |
| HC ARCHITECT, PC | 7 | 09/13/2023 |
| CUSTOM DESIGNING & ENGINEERING | 3 | 08/29/2023 |
| CAPITOL FIRE SPRINKLER CO. | 1 | 07/31/2023 |
| SARGENTI ARCHITECTS | 2 | 05/23/2023 |
| EP ENGINEERING LLC | 3 | 04/12/2023 |
| KOHN ARCHITECTURE, PLLC | 2 | 10/26/2021 |
| SHAABAN ENGINEERING, LLC | 3 | 06/11/2021 |
| GEA CONSULTING ENGINEERS | 1 | 10/27/2020 |
| Representative | Filings | Most Recent |
|---|---|---|
| MUNICIPAL BUILDING CONSULTANTS | 10 | 03/21/2026 |
| KATZ ARCHITECTURE & PROJECT MANAGEM | 4 | 03/21/2026 |
| NEW YORK SIGN CONSULTANTS | 2 | 03/21/2026 |
| JP EXPEDITE | 14 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 10 | 03/21/2026 |
| VALERIO ARCHITECTS | 4 | 03/21/2026 |
| KAZAM CONSULTANTS | 6 | 03/21/2026 |
| CAPITOL FIRE SPRINKLER | 2 | 03/21/2026 |
| WILLIAM VITACCO ASSOCIATES | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| KANARIS CONTRACTING CORP | General Contractor | 7 | 07/08/2026 |
| SIGNS CAD | Scaffold | 5 | 07/08/2026 |
| DARTOM CABINETRY CORP | General Contractor | 4 | 07/16/2026 |
| COMMERCIAL CONSTRUCTION M | General Contractor | 3 | 07/08/2026 |
| NATIONAL MAINTENANCE | Scaffold | 3 | 07/08/2026 |
| MID DEVELOPERS INC | General Contractor | 3 | 03/21/2026 |
| JKT CONSTRUCTION INC | General Contractor | 3 | 07/08/2026 |
| WESBUILT CONSTRUCTION MAN | General Contractor | 2 | 04/09/2026 |
| VILLAGE P & H NY INC | Plumbing | 2 | 06/27/2026 |
| ANESIS SERVICES CORP | Fire Protection | 1 | 07/08/2026 |
| AURA PLUMBING INC | Fire Protection | 1 | 07/08/2026 |
| CAPITOL FIRE SPRINKLER CO | Fire Protection | 1 | 07/08/2026 |
| VILLAGE P & H NY INC | Fire Protection | 1 | 07/08/2026 |
| ARCO PLBG AND HTG INC | Plumbing | 1 | 07/08/2026 |
| HYDROKINETIC PLBG & HTG I | Plumbing | 1 | 07/08/2026 |
| ANTHONY MATRONE | Electrical | 1 | 03/21/2026 |
| VALLESIGNS AWNINGS | Scaffold | 1 | 07/08/2026 |
| AXCEL ELECTRIC CO., INC. | Electrical | 1 | 03/22/2026 |
| BELLA CRUISE ELECTRICAL | Electrical | 1 | 03/22/2026 |
| BIRNBAUM, ALAN | Electrical | 1 | 03/21/2026 |
| BORRESS, HOWARD | Electrical | 1 | 03/21/2026 |
| MATRONE ANTHONY | Electrical | 1 | 03/21/2026 |
| PETERSON, TAYLOR | Electrical | 1 | 03/21/2026 |
| SCHWARTZ, IRVING | Electrical | 1 | 03/21/2026 |
| TOUGH STALLION LLC | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| DOMANI INSPECTION SERVICE | 843 | 8 | 08/21/2026 |
| KATZ ARCHITECTURE | 1371 | 4 | 05/13/2026 |
| SCHNACKEL ENGINEERS | 1821 | 4 | 04/17/2026 |
| RYAN SPECIAL ENGINEERING | 2018 | 2 | 03/11/2026 |
| THE EIPEL ENGINEERING GRO | 2714 | 1 | 01/06/2026 |
| FENAGH, INC | 6942 | 9 | 10/07/2025 |
| 360 ENGINEERING P.C. | 7496 | 3 | 10/06/2025 |
| MEP INSPECTIONS, INC | 1102 | 1 | 07/31/2023 |
| CATALPA SPECIAL INSPECTIO | 2004 | 5 | 07/31/2023 |
| ALAN MARGOLIN & ASSOC | 423 | 1 | 10/27/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Mechanical Systems | Permit Issued | DARTOM CABINETRY CORP | 07/15/2026 |
| DOB NOW | General Construction | Permit Issued | DARTOM CABINETRY CORP | 07/15/2026 |
| DOB NOW | Sprinklers | Permit Issued | ANESIS SERVICES CORP | 04/20/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | DARTOM CABINETRY CORP | 03/27/2026 |
| DOB NOW | Sprinklers | Signed-off | VILLAGE P & H NY INC | 01/30/2026 |
| DOB NOW | Plumbing | Signed-off | VILLAGE P & H NY INC | 01/30/2026 |
| DOB NOW | Mechanical Systems | Signed-off | JKT CONSTRUCTION INC | 01/29/2026 |
| DOB NOW | Structural | Signed-off | JKT CONSTRUCTION INC | 01/28/2026 |
| DOB NOW | General Construction | Permit Issued | JKT CONSTRUCTION INC | 01/27/2026 |
| DOB NOW | Sign | Signed-off | VALLESIGNS & AWNINGS INC | 01/23/2026 |
| DOB NOW | Plumbing | Permit Issued | HYDROKINETIC PLBG & HTG I | 11/25/2025 |
| DOB NOW | General Construction | Permit Issued | DARTOM CABINETRY CORP | 10/27/2025 |
| DOB NOW | Structural | Signed-off | KANARIS CONTRACTING CORP | 10/20/2025 |
| DOB NOW | General Construction | Signed-off | KANARIS CONTRACTING CORP | 09/10/2025 |
| DOB NOW | General Construction | Signed-off | KANARIS CONTRACTING CORP | 06/05/2024 |
| DOB NOW | Sprinklers | Signed-off | CAPITOL FIRE SPRINKLER CO | 08/11/2023 |
| DOB NOW | Mechanical Systems | Permit Issued | COMMERCIAL CONSTRUCTION M | 05/17/2023 |
| DOB NOW | Plumbing | Signed-off | ARCO PLBG AND HTG INC | 05/17/2023 |
| DOB NOW | General Construction | Permit Issued | COMMERCIAL CONSTRUCTION M | 05/17/2023 |
| DOB NOW | Sprinklers | Signed-off | AURA PLUMBING INC | 05/10/2023 |
| DOB NOW | Mechanical Systems | Permit Issued | KANARIS CONTRACTING CORP | 04/12/2023 |
| DOB NOW | General Construction | Signed-off | KANARIS CONTRACTING CORP | 04/11/2023 |
| DOB NOW | General Construction | Signed-off | WESBUILT CONSTRUCTION MAN | 03/14/2023 |
| DOB NOW | Sign | Signed-off | SIGNS CAD CORP | 01/27/2023 |
| DOB NOW | Sign | Signed-off | FRANK ZANFARDINO | 01/27/2023 |
| DOB NOW | Sign | Signed-off | SIGNS CAD CORP | 01/27/2023 |
| DOB NOW | Sign | Signed-off | SIGNS CAD CORP | 01/27/2023 |
| DOB NOW | Sign | Signed-off | SIGNS CAD CORP | 01/27/2023 |
| DOB NOW | General Construction | Signed-off | WESBUILT CONSTRUCTION MAN | 01/03/2023 |
| DOB NOW | Sign | Signed-off | NATIONAL MAINTENANCE, INC | 06/11/2021 |
| DOB NOW | Sign | Signed-off | NATIONAL MAINTENANCE, INC | 06/11/2021 |
| DOB NOW | Sign | Signed-off | NATIONAL MAINTENANCE, INC | 06/11/2021 |
| DOB NOW | Mechanical Systems | Signed-off | MID DEVELOPERS INC | 11/04/2020 |
| BIS | PL | ISSUED | NICE PLUMBING CORP | 03/03/2020 |
| BIS | PL | ISSUED | DNA PLUMBING CONTR. INC | 03/21/2019 |
| BIS | SP | ISSUED | AMOK INC | 01/30/2019 |
| BIS | OT | ISSUED | LD DESIGN CONTRUCTION INC | 01/15/2019 |
| BIS | PL | ISSUED | NICE PLUMBING CORP | 05/19/2018 |
| BIS | SP | ISSUED | AMOK INC | 12/11/2017 |
| BIS | PL | ISSUED | NICE PLUMBING CORP | 04/27/2017 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/13/2026 | Permit Issued | DARTOM CABINETRY CORP | Heating and Air Conditioning Systems | Heat / Cool Mitsubishi Electric SEZ-AD12NL 317 CFM · Ahu ×3 MXZ-SM60NL 5 tons · Heat Pump Outdoor ×1 SEZ-AD15NL 441 CFM · Vrf Indoor ×1 SEZ-AD18NL 653 CFM · Ahu ×1 |
| 04/17/2026 | Signed-off | JKT CONSTRUCTION INC | Refrigeration Systems, Ventilation Systems | Ventilation Greenheck Greenheck ERV-20-15H 1,200 CFM · Erv ×3 Refrigeration Samsung Samsung AM048FEHDCG 48,000 BTU · Vrf Indoor ×12 Samsung AM036FEHDCG 36,000 BTU · Vrf Indoor ×3 Samsung AM240HCVGFS 240,000 BTU · Vrf Outdoor ×3 Sigma Sigma SDH-D.1-120 126,300 BTU · Fan Coil Indoor ×6 Sigma SDSH-D.1-120 120,000 BTU · Condensing Unit ×6 Carrier Carrier 37MHRAC12AA3 12,000 BTU · Condensing Unit ×6 |
| 04/05/2023 | Permit Issued | COMMERCIAL CONSTRUCTION M | Heating and Air Conditioning Systems | Heat / Cool Mitsubishi Electric PLFY-P36NBMU-E 3 tons · Vrf Indoor ×1 Trane TPLFYP024EM140B 24,000 BTU · Vrf Indoor ×13 TPLFYP018EM141B 18,000 BTU · Vrf Indoor ×5 TPEFYP015MA144A 15,000 BTU · Ahu ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/08/2026 | Signed-off | PARAMOUNT SERVICES, LLC | 66 heads |
| 07/31/2023 | Signed-off | CAPITOL FIRE SPRINKLER CO | 118 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/13/2026 | Permit Issued | HYDROKINETIC PLBG & HTG I | Gas, Water/Sanitary |
| 01/08/2026 | — | — | — |
| 01/08/2026 | Signed-off | PARAMOUNT SERVICES, LLC | Water/Sanitary |
| 07/31/2023 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/25/2026 | Complete | TUXEDO ELEC'L CONTR'G INC | — |
| 03/25/2026 | Complete | SPECTRUM ON BROADWAY-ELEC | — |
| 02/12/2026 | Permit Issued | JANON ELECTRIC CORP | General Wiring |
| 10/23/2025 | Complete | IKAROS ELECTRICAL ENT INC | General Wiring |
| 11/20/2024 | Complete | AXCEL ELECTRIC CO., INC. | — |
| 12/08/2023 | Complete | SIGNS CAD CORP | — |
| 12/08/2023 | Complete | SIGNS CAD CORP | — |
| 12/08/2023 | Complete | SIGNS CAD CORP | — |
| 05/18/2023 | Complete | BELLA CRUISE ELECTRICAL | General Wiring |
| 04/11/2023 | Complete | IKAROS ELECTRICAL ENT INC | General Wiring |
| 02/21/2022 | Permit Issued | ROBERT CHIMENTI | 11 meters, 1 new_meters |
| 01/05/2022 | Complete | P & Z ELECTRIC CORP | General Wiring |
| 07/23/2021 | Complete | NATIONAL MAINT. INC | — |
| 07/23/2021 | Complete | NATIONAL MAINT. INC | — |
| 07/23/2021 | Complete | NATIONAL MAINT. INC | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/06/2026 | Signed-off | JKT CONSTRUCTION INC | 2 scope_items |
| 05/23/2023 | Permit Issued | COMMERCIAL CONSTRUCTION M | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/17/2026 | Signed-off | JKT CONSTRUCTION INC | Tenant Protection Plan 72 Hour |
| 01/08/2026 | Signed-off | PARAMOUNT SERVICES, LLC | Tenant Protection Plan 72 Hour |
| 01/08/2026 | Signed-off | PARAMOUNT SERVICES, LLC | Tenant Protection Plan 72 Hour |
| 01/06/2026 | Signed-off | JKT CONSTRUCTION INC | Tenant Protection Plan 72 Hour |
| 07/31/2023 | Signed-off | CAPITOL FIRE SPRINKLER CO | Tenant Protection Plan 72 Hour |
| Date | Type | Result | Report |
|---|---|---|---|
| 04/22/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/22/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/21/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/02/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 04/02/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/13/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/13/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/03/2026 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 02/19/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/03/2026 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 01/23/2026 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 01/13/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 01/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/12/2026 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 12/12/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/12/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/25/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/11/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/07/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/29/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/22/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/17/2026 | Tenant Protection Plan Compliance | JOHN MCMONAGLE | special |
| 08/14/2026 | Fire-Resistant Penetrations and Joints | JOHN MCMONAGLE | special |
| 05/26/2026 | Fire-Resistant Penetrations and Joints | David Katz | special |
| 04/30/2026 | Fire-Resistant Penetrations and Joints | David Katz | special |
| 04/20/2026 | Final | Gregory Schnackel | progress |
| 04/20/2026 | Mechanical Systems | Gregory Schnackel | special |
| 04/20/2026 | Tenant Protection Plan Compliance | JOHN MCMONAGLE | special |
| 04/16/2026 | Final | Gregory Schnackel | progress |
| 04/16/2026 | Tenant Protection Plan Compliance | JOHN MCMONAGLE | special |
| 04/16/2026 | Mechanical Systems | Gregory Schnackel | special |
| 04/07/2026 | Final | Gregory Schnackel | progress |
| 04/07/2026 | Mechanical Systems | Gregory Schnackel | special |
| 04/07/2026 | Tenant Protection Plan Compliance | JOHN MCMONAGLE | special |
| 01/13/2026 | Final | Israel Wertentheil | progress |
| 01/06/2026 | Tenant Protection Plan Compliance | JOHN MCMONAGLE | special |
| 01/06/2026 | Tenant Protection Plan Compliance | JOHN MCMONAGLE | special |
| 01/06/2026 | Sprinkler Systems | Gregory Schnackel | special |
| 01/06/2026 | Structural Cold-Formed Steel | Bix Ellenbecker | special |
| 01/06/2026 | Tenant Protection Plan Compliance | JOHN MCMONAGLE | special |
| 01/06/2026 | Post-installed Anchors | Bix Ellenbecker | special |
| 01/06/2026 | Final | Bix Ellenbecker | progress |
| 01/05/2026 | Tenant Protection Plan Compliance | JOHN MCMONAGLE | special |
| 01/05/2026 | Final | Niccolo Valerio | progress |
| 01/05/2026 | Fire-Resistant Penetrations and Joints | JOHN MCMONAGLE | special |
| 09/18/2025 | Fire-Resistance Rated Construction | David Katz | progress |