ECB09/01/200650A/50B/50C/18A/50D/50E/1987 FULTON NB 59891/50A-STEAM LINE TO WATER COLUME IS BY PASSED REPAIR STEAM LINE & REMOVE BY PASS/50B-POSITION THEBLOWDOWN BOTTOM LINE VALVES SO THE QUICK VALVE IS CLOSEST TO THE BOILNothing owed — awaiting certificate of correction
Primarily 1 family with 1 store or office · 2,000 sf lot · 1.12 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.