← Back
BuildNYC
Other college and university
Brooks Hall
607 WEST 116TH STREET · Morningside Heights · BIN 1091056
💬 Discuss this project
1901Year Built
14Stories
W6Building Class
R8Zoning
698,122 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized0 Active ViolationsFDNY Report ↗
Other college and university · Owner of record: Barnard College · 151,100 sf lot · 4.62 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofBarnard College1p · 1 filing · 2 docs
CellarBarnard College10p · 2 filings · 17 docs
Sub-BasementBarnard College1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Barnard College - Columbia Universi1410/04/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Loring Consulting Engineers207/28/2026
Integrated Design Group107/27/2026
RLM Engineering401/15/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Smep Design & Consultation203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Satellite East PlumbingPlumbing107/03/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Socotec Engineering4983307/28/2026
RLM Engineering6913401/15/2026
Building Lifecycle
All (34)Filed (8)Permit Issued (4)Signed Off (1)Violation (2)Inspection (4)Objection (4)Special Inspection (11)
08/26/2026
Objection resolved — Resolved
08/06/2026
Objection resolved — Resolved
07/31/2026
Objection raised — Scope
07/28/2026
Filed — Alteration
Application filed for plumbing work to support MEP equipment. No change to use, egress or occupancy.
M01405806-S3
07/28/2026
Filed — Alteration
Application filed for plumbing work to support MEP equipment. No change to use, egress or occupancy.
M01405806-S2
07/28/2026
Objection raised — Scope
07/27/2026
Filed — Alteration
Application filed for plumbing work to support MEP equipment. No change to use, egress or occupancy.
M01405806-I1
06/30/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
M01151112-I1
06/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/09/2026
Special inspection requirement — Energy Code Compliance Inspections
06/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/21/2026
Special inspection requirement — Energy Code Compliance Inspections
05/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/21/2026
Special inspection requirement — Final
05/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
04/20/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/19/2026
Permit issued — Suspended Scaffold
M01151112-I1-SC
02/25/2026
Permit issued — Boiler Equipment
M01147380-I1-BE
02/12/2026
Violation issued (ECB, closed)
Construction
02/12/2026
Violation issued (ECB, closed)
Construction
02/11/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/15/2026
Filed — Alteration
THIS APPLICATION IS FOR FILING PURPOSES ONLY. THE GAS PIPING SERVING BOILERS UNDER BIN #1091056 WITH LOCATION BEING 607 W 116TH STREET, NY, NY 10027 WAS INCORRECTLY FILED UNDER 3009 BROADWAY UNDER #101928853.
M01147380-P2
12/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ronald Merhige
12/23/2025
Special inspection requirement — Energy Code Compliance Inspections
Ronald Merhige
12/23/2025
Special inspection requirement — Tenant Protection Plan Compliance
Ronald Merhige
12/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/19/2025
Filed — Alteration
THIS APPLICATION IS FOR FILING PURPOSES ONLY. THE GAS PIPING SERVING BOILERS UNDER BIN #1091056 WITH LOCATION BEING 607 W 116TH STREET, NY, NY 10027 WAS INCORRECTLY FILED UNDER 3009 BROADWAY UNDER #101928853.
M01147380-P1
11/18/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/01/2025
Permit issued — Plumbing
M01147380-S1-PL
12/24/2024
Permit issued — Suspended Scaffold
M01151112-I1-SC
12/17/2024
Filed — Alteration
THIS APPLICATION IS FOR FILING PURPOSES ONLY. THE GAS PIPING SERVING BOILERS UNDER BIN #1091056 WITH LOCATION BEING 607 W 116TH STREET, NY, NY 10027 WAS INCORRECTLY FILED UNDER 3009 BROADWAY UNDER #101928853.
M01147380-S1
12/17/2024
Filed — Alteration
THIS APPLICATION IS FOR FILING PURPOSES ONLY. THE GAS PIPING SERVING BOILERS UNDER BIN #1091056 WITH LOCATION BEING 607 W 116TH STREET, NY, NY 10027 WAS INCORRECTLY FILED UNDER 3009 BROADWAY UNDER #101928853.
M01147380-I1
12/12/2024
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
M01151112-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System03/19/2026
DOB NOWBoiler EquipmentSigned-offTotal Boiler Care02/25/2026
DOB NOWPlumbingPermit IssuedSatellite East Plumbing08/01/2025
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System12/24/2024
BISBLISSUEDC C Controlled Combustion02/06/2019
BISOTISSUEDC C Controlled Combustion02/13/2018
BISPLISSUEDG.bassolino Plumbing09/16/1998
BISMHISSUEDC C Controlled Combustion09/16/1998
1 project · most recent 07/28/2026
Others
FiledStatusContractorScope
07/28/2026——Others
2 projects · most recent 07/28/2026
Water/Sanitary Gas
FiledStatusContractorScope
07/28/2026——Water/Sanitary
01/15/2026Permit IssuedSatellite East PlumbingGas
1 project · most recent 12/12/2024
FiledStatusContractorScope
12/12/2024Signed-offStructural Preservation System—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/20/2026Pass-Final Boiler Equipment InspectionPassView ↗
02/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/18/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
06/09/2026HVAC-R and service water piping design and insulation—energy_progress
06/09/2026Energy Code Compliance Inspections—progress
06/09/2026HVAC-R and service water heating system controls—energy_progress
06/09/2026Fire-Resistant Penetrations and Joints—special
05/21/2026Energy Code Compliance Inspections—progress
05/21/2026Fire-Resistant Penetrations and Joints—special
05/21/2026Final—progress
05/21/2026Fire-Resistance Rated Construction—progress
12/23/2025Fire-Resistant Penetrations and JointsRonald Merhigespecial
12/23/2025Energy Code Compliance InspectionsRonald Merhigeprogress
12/23/2025Tenant Protection Plan ComplianceRonald Merhigespecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Barnard CollegeEducationCellar, Sub-basement
Project M01405806 Alteration · Approved · 07/27/2026
Project M01147380 Alteration · Permit Entire · 12/17/2024
Project M01151112 Alteration · LOC Issued · 12/12/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/25/2026M01151112-I1Request digital key ↗
08/25/2026M01147380-I1Request digital key ↗
08/25/2026M01147380-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION4
03/12/2018101928853Open ↗
03/12/2018101928853Open ↗
03/12/2018101928853Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
02/09/2018101928853Open ↗
02/09/2018101928853Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/25/2026M01147380-P2Open ↗
08/25/2026M01147380-P1Open ↗
08/25/2026M01147380-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026M01147380-P2Open ↗
08/29/2026M01147380-P2Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
02/09/2018101928853Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/29/2026M01147380-P2Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/25/2026M01147380-P1Open ↗
08/25/2026M01147380-S1Open ↗
08/25/2026M01147380-I1Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs8
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/25/2026M01147380-P2Open ↗
08/25/2026M01147380-P1Open ↗
08/25/2026M01147380-S1Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms1
▸BISBOROUGH INTAKE FORM1
02/09/2018101928853Open ↗
▸Other Documents1
▸DOB NOWIRA Certification1
08/13/2026M01151112-I1Open ↗