DOB11/09/2013DUE TO HURRICANE SANDY BOILER & HOTWATER HEATER WAS REPLACED REMEDY: FILE LAA WITHIN 60 DAYS TO COVER WORK DONE
HPD11/23/1987D26-17.10 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDING'S HEATING SYSTEM 1 STY PUB HALL AND ON BOILER ROOM DOOR.
Three families · 2,205 sf lot · 1.32 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.