3 Open Violations 0 unresolved · 3 paperwork only▸
ECB07/05/2005PLUMBING WORK PERFORMED IS REQUIRED TO BE PERFORMED BY A LICENSED MASTER PLUMBER. NEW INSTALLATION OF A HOT WATER HEATER IN BASEMENT WITH ALL RELATED WATER, EXHAUST, AND GAS PIPING. ALSO NEW PVC PIPING FOR WASTNothing owed — awaiting certificate of correction
ECB07/05/2005FAILURE TO HAVE NEW OR ALTERED PLUMBING SYSTEM TESTED. NEW INSTALLATION OF A HOT WATER HEATER IN BASEMENT WITH ALL RELATED WATER,EXHAUST AND GAS PIPING. ALSO NEW PVC PIPING FOR WASTE USED FOR KITCHENS ON 1ST &Nothing owed — awaiting certificate of correction
ECB07/05/2005PLUMBING FIXTURE NOT PROPERLY TRAPPED AND/OR VENTED. THERE IS NO VENT PROVIDED FOR THE KITCHEN SINK ON 1ST FLOOR. REMEDY: HAVE PROPER VENT INSTALLED ON LINE.Nothing owed — awaiting certificate of correction
Two family frame · 2,500 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.