← Back
BuildNYC
Walk-up apt, over six families with stores
608 WEST 192ND STREET
MANHATTAN · BIN 1064027
💬 Discuss this project
1940Year Built
5Stories
C7Building Class
R7-2Zoning
27,055 sfGross Floor Area
40Units
LL97 CoveredRent Stabilized20 Active Violations ▸
Walk-up apt, over six families with stores · Owner of record: 608 GV · 7,500 sf lot · 3.61 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof608 GV6p · 1 filing · 13 docs
Floor 1Heavy duty sidewalk shed installation4p · 1 filing · 2 docs
Basement608 GV1p · 1 filing · 13 docs
Site & exteriorRusted window lintels and cracks repair3p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Empire R General Construction503/22/2026
608 GV407/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/12/2023$3.2M—JABAR REALTY CORP. → 608 GV$120/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY Building Associates104/15/2024
Mje Professional Services108/28/2023
Asr Engineering108/23/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S R Solar Design203/21/2026
Expediting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Empire & R General ConstructionGeneral Contractor303/21/2026
B.P. ElectricElectrical103/22/2026
Voltair SolarGeneral Contractor107/08/2026
Reliable EnterprisesScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM Engineering6244104/15/2024
Syed Engineering7054108/23/2023
Building Lifecycle
All (82)Filed (3)Permit Issued (3)Signed Off (2)Violation (60)Objection (6)Special Inspection (8)
05/29/2026
Violation issued (HPD, closed)
A
05/29/2026
Violation issued (HPD, closed)
A
05/29/2026
Violation issued (HPD, open)
C
05/29/2026
Violation issued (HPD, closed)
B
05/29/2026
Violation issued (HPD, closed)
B
05/29/2026
Violation issued (HPD, closed)
A
05/29/2026
Violation issued (HPD, open)
C
05/29/2026
Violation issued (HPD, open)
C
05/29/2026
Violation issued (HPD, open)
C
05/22/2026
Violation issued (HPD, closed)
A
05/22/2026
Violation issued (HPD, closed)
C
05/22/2026
Violation issued (HPD, open)
C
05/22/2026
Violation issued (HPD, closed)
A
11/28/2025
Violation issued (HPD, closed)
B
11/28/2025
Violation issued (HPD, closed)
B
11/28/2025
Violation issued (HPD, closed)
B
11/28/2025
Violation issued (HPD, closed)
B
11/28/2025
Violation issued (HPD, closed)
C
11/28/2025
Violation issued (HPD, closed)
A
11/28/2025
Violation issued (HPD, closed)
B
11/28/2025
Violation issued (HPD, closed)
B
11/28/2025
Violation issued (HPD, closed)
B
11/28/2025
Violation issued (HPD, closed)
B
11/28/2025
Violation issued (HPD, closed)
B
11/28/2025
Violation issued (HPD, closed)
C
11/17/2025
Violation issued (HPD, closed)
I
11/06/2025
Violation issued (HPD, closed)
C
11/06/2025
Violation issued (HPD, closed)
C
11/06/2025
Violation issued (HPD, closed)
C
10/15/2025
Violation issued (HPD, closed)
C
10/15/2025
Violation issued (HPD, closed)
B
10/15/2025
Violation issued (HPD, closed)
B
08/21/2025
Violation issued (HPD, closed)
B
08/21/2025
Violation issued (HPD, closed)
A
08/21/2025
Violation issued (HPD, closed)
B
08/21/2025
Violation issued (HPD, closed)
B
08/21/2025
Violation issued (HPD, closed)
C
08/21/2025
Violation issued (HPD, closed)
B
07/23/2025
Violation issued (HPD, open)
B
07/23/2025
Violation issued (HPD, closed)
B
07/23/2025
Violation issued (HPD, closed)
B
07/23/2025
Violation issued (HPD, closed)
B
07/23/2025
Violation issued (HPD, closed)
B
07/23/2025
Violation issued (HPD, open)
B
07/23/2025
Violation issued (HPD, closed)
B
07/23/2025
Violation issued (HPD, closed)
C
07/23/2025
Violation issued (HPD, closed)
A
07/23/2025
Violation issued (HPD, closed)
B
07/23/2025
Violation issued (HPD, closed)
B
07/23/2025
Violation issued (HPD, closed)
B
07/23/2025
Violation issued (HPD, closed)
B
07/23/2025
Violation issued (HPD, closed)
B
06/08/2025
Violation issued (HPD, closed)
B
06/08/2025
Violation issued (HPD, closed)
C
06/08/2025
Violation issued (HPD, open)
B
06/08/2025
Violation issued (HPD, open)
B
06/08/2025
Violation issued (HPD, closed)
B
06/08/2025
Violation issued (HPD, open)
C
05/21/2025
Violation issued (HPD, closed)
A
05/21/2025
Violation issued (HPD, closed)
C
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedVoltair Solar05/22/2024
DOB NOWGeneral ConstructionSigned-offEmpire & R General Construction08/30/2023
DOB NOWSidewalk ShedSigned-offReliable Enterprises08/29/2023
BISFSISSUEDG. Bauer10/09/1991
BISBLISSUEDG.bauer02/05/1991
3 projects · most recent 03/13/2025
General Wiring
FiledStatusContractorScope
03/13/2025CompleteB.P. ElectricGeneral Wiring
01/16/2024CompleteB.P. Electric—
08/25/2023CompleteRichard Neu—
1 project · most recent 04/15/2024
FiledStatusContractorScope
04/15/2024Permit IssuedVoltair Solar70 panels, 33.95 kw, 4,803 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
12/28/2023Air barrier - visual inspectionNARESH MAHANGUenergy_progress
12/28/2023Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
12/28/2023Energy Code Compliance InspectionsNARESH MAHANGUprogress
12/28/2023FinalNARESH MAHANGUprogress
12/28/2023Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
08/22/2023MasonryRAFI HAMIDspecial
08/21/2023Tenant Protection Plan ComplianceRAFI HAMIDspecial
08/21/2023FinalRAFI HAMIDprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
608 GVResidentialRoof
Project M00983036 Alteration · Permit Entire · 04/15/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/29/2026M00922161-I1Request digital key ↗
08/29/2026M00925335-I1Request digital key ↗
08/27/2026M00983036-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature5
09/18/2026M00983036-P1Open ↗
09/18/2026M00983036-P1Open ↗
09/01/2026M00983036-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/29/2026M00922161-I1Open ↗
08/29/2026M00925335-I1Open ↗
08/27/2026M00983036-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/18/2026M00983036-P1Open ↗
09/01/2026M00983036-I1Open ↗
08/23/2026M00922161-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/15/2026M00983036-I1Open ↗
08/13/2026M00983036-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026M00983036-I1Open ↗