Walk-up apt, over six families with stores
609 45 STREET
BROOKLYN · BIN 3011297
💬 Discuss this project
1923Year Built
5Stories
C7Building Class
R6AZoning
40,397 sfGross Floor Area
51Units
LL97 CoveredRent Stabilized32 Open Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: CHARIS REALITY CORP · 10,000 sf lot · 4.04 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingCivilGeneral
Floor 17p · 3 filings · 20 docs
Cellar4p · 1 filing · 7 docs
1 job · most recent 11/05/2025
Heating and Air Conditioning Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/05/2025Permit IssuedIZZY BEE BEAUTY LLCHeating and Air Conditioning Systems, Refrigeration Systems, Ventilation Systems
Heat / Cool
Daikin 5MXS48TVJU 48,000 BTU · Split System ×4
Ventilation
Greenheck # CUBE-300-20140G3QD-DR2 3,500 CFM · Exhaust Fan ×2
Refrigeration
Embraco NJ9232GK 21 tons · Refrigeration Unit ×2
1 job · most recent 04/08/2025
FiledStatusContractorScope
04/08/2025——3 heads
1 job · most recent 04/08/2025
Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
04/08/2025Signed-offJ. CAIAZZO PLBG & HTG CORPlumbing-Sprinkler, Water/Sanitary
8 jobs · most recent 11/07/2025
General Wiring Boiler Controls
FiledStatusContractorScope
11/07/2025Permit IssuedLIMITLESS ELECT RESOURCESGeneral Wiring
08/06/2024Permit IssuedWCK ELECTRIC CORP.General Wiring
06/27/2023CompletePLATINUM PWR ELECTL CONTGeneral Wiring
03/24/2022CompleteGOTHAM WIRING LICENSEDGeneral Wiring
02/28/2022CompleteL.J.F. & SONS ELECL CONTSBoiler Controls
03/10/2021CompleteL.J.F. & SONS ELECL CONTS—
11/06/2020Permit IssuedRICHARD NEU—
06/28/2019CompleteDELTA PHASE ELEC'L CORP.General Wiring
Building Lifecycle
All (177)Filed (9)Permit Issued (7)Signed Off (4)Violation (60)Inspection (9)Objection (76)Special Inspection (12)
02/17/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/16/2025
Objection resolved — Addressed
11/13/2025
Signed off — Alteration
INSTALLATION OF NEW PLUMBING FIXTURE FOR THE EXISTING COMM. SPACE AS FOLLOW: (2) HAND SINK, (1) 3 COMP. SINK, (1) SINGLE COMP. SINK, (2) FLOOR DRAIN, (5) COMMERCIAL GAS COOKING EQUIPMENT AND AS PER PLANS. NO CHANGE USE EGRESS
B01175015-I1
11/07/2025
Objection raised — Scope
11/05/2025
Filed — Alteration
INTERIOR RENOVATION FOR EXISTING STORE INCLUDING, COMBINED TWO STORE SPACES IN ONE, INSTALLATION OF CERAMIC FLOOR, INTERIOR WALLS, CEILING, ELECTRICAL COOKING EQUIPMENT, AND MECHANICAL WORK AS PER PLANS. NO CHANGE USE AGREES OR OCCUPANCY IN THIS APPL.
B01152772-P1
10/30/2025
Special inspection requirement — Mechanical Systems
IRVING PRUS
10/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IRVING PRUS
10/30/2025
Special inspection requirement — Lighting controls
IRVING PRUS
10/30/2025
Special inspection requirement — Final
IRVING PRUS
10/30/2025
Special inspection requirement — Interior lighting power
IRVING PRUS
10/29/2025
Violation issued (HPD, closed)
C
10/29/2025
Violation issued (HPD, closed)
B
10/29/2025
Violation issued (HPD, closed)
B
10/29/2025
Violation issued (HPD, closed)
C
10/29/2025
Violation issued (HPD, closed)
B
10/29/2025
Violation issued (HPD, closed)
B
10/29/2025
Violation issued (HPD, closed)
A
10/29/2025
Violation issued (HPD, closed)
C
10/29/2025
Violation issued (HPD, closed)
B
10/28/2025
Signed off — Alteration
INSTALLATION OF NEW PLUMBING FIXTURE FOR THE EXISTING COMM. SPACE AS FOLLOW: (1) HAND SINK, (1) 3 COMP. SINK AS PER PLANS. AND 3 SPRINKLER HEADS FROM THE DOMESTIC WATER LINE. NO CHANGE USE EGRESS
B01092442-S1
09/29/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/29/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/16/2025
Objection resolved — Addressed
09/12/2025
Objection raised — Admin
09/05/2025
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURE FOR THE EXISTING COMM. SPACE AS FOLLOW: (2) HAND SINK, (1) 3 COMP. SINK, (1) SINGLE COMP. SINK, (2) FLOOR DRAIN, (5) COMMERCIAL GAS COOKING EQUIPMENT AND AS PER PLANS. NO CHANGE USE EGRESS
B01175015-P1
09/04/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IRVING PRUS
08/05/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/01/2025
Permit issued — Mechanical Systems
B01152772-I1-GC
08/01/2025
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
08/01/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/29/2025
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
06/20/2025
Permit issued — Plumbing
B01092442-S1-PL
06/06/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/19/2025
Objection resolved — Addressed
05/19/2025
Objection resolved — Addressed
05/19/2025
Objection resolved — Addressed
04/30/2025
Objection resolved — Addressed
04/30/2025
Objection resolved — Addressed
04/30/2025
Objection resolved — Addressed
04/25/2025
Objection resolved — Addressed
04/25/2025
Objection resolved — Addressed
04/25/2025
Objection resolved — Addressed
04/25/2025
Objection resolved — Addressed
04/22/2025
Objection raised — Scope
04/22/2025
Objection raised — Fire_Protection
04/22/2025
Objection raised — Structural
04/22/2025
Objection raised — Fire_Protection
04/22/2025
Objection raised — Fire_Protection
04/22/2025
Objection raised — Fire_Protection
04/22/2025
Objection raised — Structural
04/17/2025
Objection raised — Plumbing
04/17/2025
Objection raised — Scope
04/17/2025
Objection raised — Plumbing
04/10/2025
Objection resolved — Addressed
04/08/2025
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURE FOR THE EXISTING COMM. SPACE AS FOLLOW: (1) HAND SINK, (1) 3 COMP. SINK AS PER PLANS. AND 3 SPRINKLER HEADS FROM THE DOMESTIC WATER LINE. NO CHANGE USE EGRESS
B01092442-S1
04/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/06/2025
Permit issued — Plumbing
B01175015-I1-PL
03/05/2025
Violation issued (HPD, closed)
A
03/05/2025
Violation issued (HPD, closed)
B
Latest 60 of 177 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BROOKLYN PROPERTY MANAGERS507/08/2026
J G CONSTRUCTION SRVCS407/08/2026
CHARIS REALITY CORP1703/22/2026
ISLAND STRONG CONSTRU INC103/22/2026
J&G CONSTRUCTION SERVICES103/22/2026
T-MOBILE303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DD DESIGN GROUP INC.611/05/2025
NEW YORK ENGINEERING ASSOC., P.C.201/26/2021
SYED ENGINEERING, P.C.111/18/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P403/21/2026
EB STUDIO EXP1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J. CAIAZZO PLBG & HTG CORPlumbing407/08/2026
ACS ENVIRONMENTAL & CONSTGeneral Contractor303/21/2026
VIALVA, JOSEPHElectrical203/21/2026
BECKER, CHARLESElectrical203/21/2026
FILARDI, JAMESElectrical203/21/2026
ARCO PLBG AND HTG INCPlumbing207/08/2026
NEW YORK HEATING CORPPlumbing207/08/2026
J & G CONSTRUCTION SVCSGeneral Contractor107/08/2026
IZZY BEE BEAUTY LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IRVING B. PRUS6993611/05/2025
NEW YORK ENGINEERING ASSO851101/26/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedIZZY BEE BEAUTY08/01/2025
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR06/20/2025
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC03/06/2025
DOB NOWMechanical SystemsPermit IssuedACS ENVIRONMENTAL & CONST12/13/2024
DOB NOWBoiler EquipmentSigned-offHIGH RISE PLBG & HTG CORP03/10/2021
DOB NOWPlumbingSigned-offHIGH RISE PLBG & HTG CORP03/08/2021
DOB NOWSidewalk ShedPermit IssuedJ & G CONSTRUCTION SVCS11/18/2020
BISOTISSUEDISLAND STRONG CONSTRC INC08/23/2018
BISOTISSUEDLEVEST ELECTRIC CORP10/17/2017
BISOTISSUEDTELCOM ENGINEERING GP INC02/15/2006
BISOTISSUEDCHARTER COMMUNICATIONS, INC.01/15/2004
BISOTRE-ISSUEDBRIGHTON INSTALLATION CO03/24/2000
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
09/29/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/04/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/01/2025Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
08/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/29/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
06/06/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
10/30/2025Mechanical SystemsIRVING PRUSspecial
10/30/2025Fire-Resistant Penetrations and JointsIRVING PRUSspecial
10/30/2025Lighting controlsIRVING PRUSenergy_progress
10/30/2025FinalIRVING PRUSprogress
10/30/2025Interior lighting powerIRVING PRUSenergy_progress
09/04/2025Fire-Resistant Penetrations and JointsIRVING PRUSspecial
08/07/2024Lighting controlsMICHAEL CALVIenergy_progress
08/07/2024Interior lighting powerMICHAEL CALVIenergy_progress
01/15/2021Heating SystemsLOUIS ARENAspecial
01/15/2021HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
01/15/2021Maintenance informationLOUIS ARENAenergy_progress
01/15/2021HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch6
08/22/2026B01092442-S1Request digital key ↗
08/22/2026B01092442-I1Request digital key ↗
08/20/2026B01175015-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/01/2026B00454936-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/01/2026B00452081-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/15/2026B00424689-I1Request digital key ↗
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION3
06/28/2019321807764Open ↗
08/24/2018321807764Open ↗
10/17/2017321113969Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION3
07/24/2018321807764Open ↗
10/03/2017321113969Open ↗
05/08/2015321113969Open ↗
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/02/2026B00424689-I1Open ↗
09/01/2026B00454936-I1Open ↗
09/01/2026B00452081-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/25/2026B01092442-I1Open ↗
09/25/2026B01092442-I1Open ↗
09/23/2026B00454936-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026B00454936-I1Open ↗
08/31/2026B01152772-P1Open ↗
08/31/2026B01152772-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
08/24/2018321807764Open ↗
07/24/2018321807764Open ↗
10/17/2017321113969Open ↗
▸Trade Schedules & Equipment2
▸BISFA - FDNY APPROVAL : FD-FAA1
10/10/2017321113969Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/24/2018321807764Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
07/24/2018321807764Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00424689-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/01/2026B00454936-I1Open ↗
09/01/2026B00452081-I1Open ↗
08/20/2026B01175015-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/24/2018321807764Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
08/24/2018321807764Open ↗
07/24/2018321807764Open ↗
10/24/2017321113969Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00454936-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
09/01/2026B00454936-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION2
10/03/2017321113969Open ↗
10/03/2017321113969Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
07/24/2018321807764Open ↗
05/08/2015321113969Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
07/24/2018321807764Open ↗
05/08/2015321113969Open ↗
▸BISADDITIONAL INFORMATION1
06/05/2019321807764Open ↗
▸BISBOROUGH INTAKE FORM1
10/24/2017321113969Open ↗
▸Other Documents3
▸DOB NOWDHCR Document2
09/01/2026B00454936-I1Open ↗
08/13/2026B00452081-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
10/03/2017321113969Open ↗