← Back
Over six families without stores
609 GRAND AVENUE
BROOKLYN · Crown Heights (North) · BIN 3028607
💬 Discuss this project
1930Year Built
3Stories
C1Building Class
R6BZoning
6,912 sfGross Floor Area
9Units
Rent Stabilized51 Open Violations 49 unresolved · 2 paperwork only ▸FDNY Report ↗
Over six families without stores · Owner of record: CROWN PROSPECT ASSOCIATES LIMITED PARTNE RSHIP · 880 sf lot · 7.85 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRIBECA CONSTRUCTION GROUP804/09/2026
DOUGERT MANAGEMENT404/09/2026
JIMMY G CONSTRUCTION503/22/2026
CROWN PROSPECT ASSOCIATES203/22/2026
CROWN PROSPECT HOUSES HDFC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PHILIBERT ENGINEERING, PC111/26/2024
RIMKUS107/09/2024
SYED ENGINEERING, P.C.103/18/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SYNERGY BUILDING CONSULTANTS103/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRIBECA CONSTRUCTION GROUPGeneral Contractor504/09/2026
JIMMY G CONSTRUCTION CORPGeneral Contractor203/21/2026
HIGH QUALITY ELECTRIC OFElectrical103/22/2026
NEW FEDCO GENERAL CONTRACGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PHILIBERT ENGINEERING, PC223111/26/2024
Building Lifecycle
All (44)Filed (4)Permit Issued (6)Signed Off (2)Violation (26)Objection (2)Special Inspection (4)
05/07/2026
Signed off — Alteration
Installation of suspended scaffold for facade inspection/ repair.
B01369939-I1
03/20/2026
Permit issued — Suspended Scaffold
B01369939-I1-SC
03/10/2026
Filed — Alteration
Installation of suspended scaffold for facade inspection/ repair.
B01369939-I1
03/04/2026
Permit issued — Sidewalk Shed
B01071765-I1-SH
01/15/2026
Permit issued — Structural
B01106884-I1-GC-CX
11/05/2025
Violation issued (ECB, open)
Construction
08/12/2025
Permit issued — Sidewalk Shed
B01071765-I1-SH
02/10/2025
Violation issued (HPD, closed)
C
01/15/2025
Violation issued (HPD, open)
C
12/03/2024
Objection resolved — Addressed
12/02/2024
Objection raised — Scope
11/26/2024
Filed — Alteration
Limited facade repairs to include repairs of rendering / coating, parapet, brick, and precast stone.
B01106884-I1
11/15/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jacky Philibert
11/15/2024
Special inspection requirement — Masonry
Jacky Philibert
11/15/2024
Special inspection requirement — Tenant Protection Plan Compliance
Jacky Philibert
09/05/2024
Special inspection requirement — Final
Jacky Philibert
07/12/2024
Permit issued — Sidewalk Shed
B01071765-I1-SH
07/09/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01071765-I1
06/18/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/17/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/26/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/14/2019
Violation issued (ECB, closed)
Construction
06/03/2019
Signed off — Alteration
B00143116-I1
03/23/2019
Violation issued (ECB, closed)
Construction
03/18/2019
Filed — Alteration
B00143116-I1
03/18/2019
Permit issued — Sidewalk Shed
B00143116-I1-SH
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offSHR3 CONSTRUCTION CORP03/20/2026
DOB NOWSidewalk ShedPermit IssuedTRIBECA CONSTRUCTION GROU03/04/2026
DOB NOWStructuralPermit IssuedNEW FEDCO GENERAL CONTRAC01/15/2026
DOB NOWSidewalk ShedPermit IssuedTRIBECA CONSTRUCTION GROU08/12/2025
DOB NOWSidewalk ShedPermit IssuedTRIBECA CONSTRUCTION GROU07/12/2024
DOB NOWSidewalk ShedSigned-offJIMMY G CONSTRUCTION CORP03/18/2019
2 projects · most recent 06/25/2024
FiledStatusContractorScope
06/25/2024Permit IssuedHIGH QUALITY ELECTRIC OF—
03/18/2019CompleteRICHARD NEU—
1 project · most recent 11/26/2024
Masonry
FiledStatusContractorScope
11/26/2024Permit IssuedNEW FEDCO GENERAL CONTRACMasonry
1 project · most recent 07/09/2024
Sidewalk Shed
FiledStatusContractorScope
07/09/2024Permit IssuedTRIBECA CONSTRUCTION GROUSidewalk Shed
1 project · most recent 03/10/2026
Suspended Scaffold
FiledStatusContractorScope
03/10/2026Signed-offSHR3 CONSTRUCTION CORPSuspended Scaffold
1 project · most recent 03/10/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
03/10/2026Signed-offSHR3 CONSTRUCTION CORPSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
11/15/2024Structural Stability – Alterations of existing buildingsJacky Philibertspecial
11/15/2024MasonryJacky Philibertspecial
11/15/2024Tenant Protection Plan ComplianceJacky Philibertspecial
09/05/2024FinalJacky Philibertprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch3
08/24/2026B01071765-I1Request digital key ↗
08/18/2026B01369939-I1Request digital key ↗
08/14/2026B01106884-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00143116-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/02/2026B00143116-I1Open ↗
08/13/2026B01106884-I1Open ↗
08/13/2026B01071765-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/24/2026B01106884-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026B01106884-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01106884-I1Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/13/2026B01369939-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B01369939-I1Open ↗