← Back
One family attached or semi-detached
609 OAK TERRACE
BRONX · BIN 2102466
💬 Discuss this project
2000Year Built
2Stories
A5Building Class
R6Zoning
—Gross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 0.8 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC106/06/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272106/06/2024
Building Lifecycle
All (10)Filed (1)Permit Issued (1)Signed Off (1)Violation (2)Special Inspection (5)
03/06/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01057698-I1
06/20/2024
Permit issued — Solar
X01057698-I1-SL
06/06/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01057698-I1
05/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
05/28/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
05/28/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
05/28/2024
Special inspection requirement — Final
Walid Abdulla
05/28/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
01/09/2009
Violation issued (HPD, closed)
B
01/09/2009
Violation issued (HPD, closed)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC06/20/2024
BISPLISSUEDDUO PLUMBING & HTG CORP.04/24/2000
BIS—ISSUEDFORESITE CONSTRUCTION CORP.04/18/2000
2 projects · most recent 06/27/2024
General Wiring
FiledStatusContractorScope
06/27/2024CompleteAQUATECH MECH,PLBG & ELEC1 meters
06/06/2024Permit IssuedSUNRUN SOLAR ELECTL CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/28/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
05/28/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
05/28/2024Energy Code Compliance InspectionsWalid Abdullaprogress
05/28/2024FinalWalid Abdullaprogress
05/28/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026X01057698-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026X01057698-I1Open ↗
08/27/2026X01057698-I1Open ↗
08/27/2026X01057698-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026X01057698-I1Open ↗
08/27/2026X01057698-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026X01057698-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01057698-I1Open ↗