—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT106/01/2026
Building Lifecycle
All (29)Filed (1)Objection (1)Special Inspection (27)
06/04/2026
Objection raised — Scope
06/04/2026
Special inspection requirement — Ventilation and air distribution system
06/01/2026
Filed — New Building
PROPOSED ONE-FAMILY DWELLING WITH ACCESSORY OPEN OFF-STREET PARKING FOR ONE CAR.
S01408953-I1
05/29/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
05/28/2026
Special inspection requirement — Concrete - Cast-In-Place
05/28/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
05/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/28/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
05/28/2026
Special inspection requirement — Subgrade Inspections
05/28/2026
Special inspection requirement — Final
05/28/2026
Special inspection requirement — Energy Code Compliance Inspections
05/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
05/28/2026
Special inspection requirement — Structural Wood Frame
05/28/2026
Special inspection requirement — Air barrier — testing
05/28/2026
Special inspection requirement — Insulation placement and R values
05/28/2026
Special inspection requirement — Fenestration air leakage
05/28/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/28/2026
Special inspection requirement — Interior lighting power
05/28/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/28/2026
Special inspection requirement — Air barrier - visual inspection
05/28/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
05/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/28/2026
Special inspection requirement — Maintenance information
05/28/2026
Special inspection requirement — Fenestration areas
05/28/2026
Special inspection requirement — Metering
05/28/2026
Special inspection requirement — Permanent certificate
05/28/2026
Special inspection requirement — Footing and Foundation
05/28/2026
Special inspection requirement — Protection of exposed foundation insulation
05/28/2026
Special inspection requirement — Mechanical Systems
Nothing on file for this building.
1 project · most recent 06/01/2026
Concrete Wood
FiledStatusContractorScope
06/01/2026——Concrete, Wood
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
06/04/2026Ventilation and air distribution system—energy_progress
05/29/2026Subsurface Investigations (Borings/Test Pits)—special
05/28/2026Concrete - Cast-In-Place—special
05/28/2026Exterior Insulation and Finish Systems (EIFS)—special
05/28/2026Fire-Resistant Penetrations and Joints—special
05/28/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
05/28/2026Subgrade Inspections—special
05/28/2026Final—progress
05/28/2026Energy Code Compliance Inspections—progress
05/28/2026Fire-Resistance Rated Construction—progress
05/28/2026Structural Wood Frame—progress
05/28/2026Air barrier — testing —energy_progress
05/28/2026Insulation placement and R values—energy_progress
05/28/2026Fenestration air leakage—energy_progress
05/28/2026HVAC-R and service water heating equipment—energy_progress
05/28/2026Interior lighting power—energy_progress
05/28/2026HVAC-R and service water heating system controls—energy_progress
05/28/2026Air barrier - visual inspection—energy_progress
05/28/2026Fenestration and door U-factor and product ratings—energy_progress
05/28/2026HVAC-R and service water piping design and insulation—energy_progress
05/28/2026Maintenance information—energy_progress
05/28/2026Fenestration areas—energy_progress
05/28/2026Metering—energy_progress
05/28/2026Permanent certificate—energy_progress
05/28/2026Footing and Foundation—progress
Latest 25 of 27.
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/14/2026S01408953-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/14/2026S01408953-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026S01408953-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026S01408953-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/14/2026S01408953-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/14/2026S01408953-I1Open ↗
▸DOB NOWSOIL REPORT1
08/14/2026S01408953-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/14/2026S01408953-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026S01408953-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/14/2026S01408953-I1Open ↗