← Back
Three families
61-01 MENAHAN STREET
QUEENS · Ridgewood · BIN 4084589
💬 Discuss this project
1925Year Built
2Stories
C0Building Class
R5BZoning
2,386 sfGross Floor Area
3Units
1 Open Violation ▸
Three families · 2,400 sf lot · 0.99 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Floor 25p · 2 filings · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar5p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/11/2022$1.1M—— → —$482/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRANK J QUATELA ARCHITECT P.C509/26/2024
SIDERIS KEFALAS ENGINEERS PC102/06/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Manetta architecture design pllc1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JONAS RENOVATION CORPGeneral Contractor707/08/2026
AJC SPRINKLER CORPFire Protection207/08/2026
AMN PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WORLD DESIGN ARCHITECTURE9323409/26/2024
DOYUN KIM; RA7415207/26/2024
Building Lifecycle
All (82)Filed (6)Permit Issued (6)Signed Off (2)Violation (2)Inspection (10)Objection (26)Special Inspection (30)
02/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/05/2024
Signed off — Alteration CO
FILING FOR CONVERSION FROM A 2 TO A 3 FAMILY. INTERIOR GUT RENOVATION AT CELLAR, FIRST AND SECOND FLOOR. NEW PARTITIONS, STEEL BEAM IN CELLAR, FINISHES, DOORS, WINDOWS, KITCHEN CABINETS, NEW HVAC. NO CHANGE TO THE EXISTING BULK OF THE BUILDING.
Q00980896-S1
10/21/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/26/2024
Filed — Alteration CO
FILING FOR CONVERSION FROM A 2 TO A 3 FAMILY. INTERIOR GUT RENOVATION AT CELLAR, FIRST AND SECOND FLOOR. NEW PARTITIONS, STEEL BEAM IN CELLAR, FINISHES, DOORS, WINDOWS, KITCHEN CABINETS, NEW HVAC. NO CHANGE TO THE EXISTING BULK OF THE BUILDING.
Q00980896-P3
09/26/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
09/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
09/25/2024
Special inspection requirement — Energy Code Compliance Inspections
JEFFREY BELL
09/25/2024
Special inspection requirement — HVAC-R and service water heating system controls
JEFFREY BELL
09/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JEFFREY BELL
09/25/2024
Special inspection requirement — Permanent certificate
JEFFREY BELL
09/25/2024
Special inspection requirement — Maintenance information
JEFFREY BELL
09/25/2024
Special inspection requirement — HVAC-R and service water heating equipment
JEFFREY BELL
09/13/2024
Signed off — Alteration
Herewith filing for the installation of a new sprinkler system throughout the building in conjunction with the conversion to 3-family occupancy. This application filed in conjunction with alteration application #Q00980896-I1.
Q01001173-I1
08/28/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/27/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/27/2024
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
08/26/2024
Permit issued — Sprinklers
Q01001173-I1-EW-SP
08/26/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/26/2024
Filed — Alteration CO
FILING FOR CONVERSION FROM A 2 TO A 3 FAMILY. INTERIOR GUT RENOVATION AT CELLAR, FIRST AND SECOND FLOOR. NEW PARTITIONS, STEEL BEAM IN CELLAR, FINISHES, DOORS, WINDOWS, KITCHEN CABINETS, NEW HVAC. NO CHANGE TO THE EXISTING BULK OF THE BUILDING.
Q00980896-P2
07/26/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
JEFFREY BELL
07/26/2024
Special inspection requirement — Air barrier - visual inspection
JEFFREY BELL
07/26/2024
Special inspection requirement — Maintenance information
JEFFREY BELL
07/26/2024
Special inspection requirement — Duct leakage testing, insulation and design
JEFFREY BELL
07/26/2024
Special inspection requirement — Heating Systems
WILLIAM ALICEA
07/26/2024
Special inspection requirement — Metering
JEFFREY BELL
07/26/2024
Special inspection requirement — Fenestration air leakage
JEFFREY BELL
07/26/2024
Special inspection requirement — Fenestration areas
JEFFREY BELL
07/26/2024
Special inspection requirement — Structural Steel - Details
WILLIAM ALICEA
07/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM ALICEA
07/26/2024
Special inspection requirement — Mechanical Systems
WILLIAM ALICEA
07/26/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
WILLIAM ALICEA
07/26/2024
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM ALICEA
07/26/2024
Special inspection requirement — Final
JEFFREY BELL
07/26/2024
Special inspection requirement — Energy Code Compliance Inspections
JEFFREY BELL
07/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
JEFFREY BELL
07/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
JEFFREY BELL
07/26/2024
Special inspection requirement — Permanent certificate
JEFFREY BELL
07/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JEFFREY BELL
07/26/2024
Special inspection requirement — Interior lighting power
JEFFREY BELL
07/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
JEFFREY BELL
07/26/2024
Special inspection requirement — Insulation placement and R values
JEFFREY BELL
07/10/2024
Permit issued — Structural
Q00980896-I1-MS
06/26/2024
Objection resolved — Addressed
06/26/2024
Objection resolved — Addressed
06/26/2024
Objection resolved — Addressed
06/07/2024
Objection raised — Other
06/07/2024
Objection raised — Other
06/07/2024
Objection raised — Scope
06/04/2024
Filed — Alteration CO
FILING FOR CONVERSION FROM A 2 TO A 3 FAMILY. INTERIOR GUT RENOVATION AT CELLAR, FIRST AND SECOND FLOOR. NEW PARTITIONS, STEEL BEAM IN CELLAR, FINISHES, DOORS, WINDOWS, KITCHEN CABINETS, NEW HVAC. NO CHANGE TO THE EXISTING BULK OF THE BUILDING.
Q00980896-P1
06/03/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JEFFREY BELL
05/23/2024
Violation issued (ECB, closed)
Construction
05/17/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/17/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/24/2024
Permit issued — Sprinklers
Q01001173-I1-EW-SP
04/09/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/29/2024
Permit issued — Plumbing
Q00980896-S1-PL
03/19/2024
Objection resolved — Addressed
03/19/2024
Objection resolved — Addressed
03/19/2024
Objection resolved — Addressed
03/19/2024
Objection resolved — Addressed
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offAJC SPRINKLER CORP08/26/2024
DOB NOWStructuralSigned-offJONAS RENOVATION CORP07/10/2024
DOB NOWSprinklersSigned-offAJC SPRINKLER CORP04/24/2024
DOB NOWPlumbingSigned-offAMN PLUMBING CORP03/29/2024
DOB NOWStructuralSigned-offJONAS RENOVATION CORP03/14/2024
DOB NOWMechanical SystemsPermit IssuedJONAS RENOVATION CORP03/13/2024
1 project · most recent 09/26/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/26/2024Signed-offJONAS RENOVATION CORPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Fujitsu AOU36RLXFZ 3 tons · Condensing Unit ×2
Mitsubishi Electric MXZ-4C36NA3-U1 3 tons · Condensing Unit ×2
Ventilation
Panasonic FV-0511VF1 50 CFM · Exhaust Fan ×10
Broan-Nutone SAHALE BKDEG1 300 CFM · Kitchen Exhaust ×6
1 project · most recent 09/26/2024
Gas Water/Sanitary
FiledStatusContractorScope
09/26/2024Signed-offAMN PLUMBING CORPGas, Water/Sanitary
1 project · most recent 04/07/2024
General Wiring
FiledStatusContractorScope
04/07/2024CompleteSMART ELECTRIC SERVICESGeneral Wiring
1 project · most recent 09/26/2024
Wood
FiledStatusContractorScope
09/26/2024Signed-offJONAS RENOVATION CORPWood
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
02/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/21/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/26/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/28/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/27/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/27/2024No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
08/26/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/17/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/09/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
09/25/2024Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
09/25/2024Energy Code Compliance InspectionsJEFFREY BELLprogress
09/25/2024HVAC-R and service water heating system controlsJEFFREY BELLenergy_progress
09/25/2024HVAC-R and service water piping design and insulationJEFFREY BELLenergy_progress
09/25/2024Permanent certificateJEFFREY BELLenergy_progress
09/25/2024Maintenance informationJEFFREY BELLenergy_progress
09/25/2024HVAC-R and service water heating equipmentJEFFREY BELLenergy_progress
07/26/2024Fenestration and door U-factor and product ratingsJEFFREY BELLenergy_progress
07/26/2024Air barrier - visual inspectionJEFFREY BELLenergy_progress
07/26/2024Maintenance informationJEFFREY BELLenergy_progress
07/26/2024Duct leakage testing, insulation and designJEFFREY BELLenergy_progress
07/26/2024Heating SystemsWILLIAM ALICEAspecial
07/26/2024MeteringJEFFREY BELLenergy_progress
07/26/2024Fenestration air leakageJEFFREY BELLenergy_progress
07/26/2024Fenestration areasJEFFREY BELLenergy_progress
07/26/2024Structural Steel - DetailsWILLIAM ALICEAspecial
07/26/2024Fire-Resistant Penetrations and JointsWILLIAM ALICEAspecial
07/26/2024Mechanical SystemsWILLIAM ALICEAspecial
07/26/2024Structural Stability – Alterations of existing buildingsWILLIAM ALICEAspecial
07/26/2024Concrete - Cast-In-PlaceWILLIAM ALICEAspecial
07/26/2024FinalJEFFREY BELLprogress
07/26/2024Energy Code Compliance InspectionsJEFFREY BELLprogress
07/26/2024Fire-Resistance Rated ConstructionJEFFREY BELLprogress
07/26/2024HVAC-R and service water heating equipmentJEFFREY BELLenergy_progress
07/26/2024Permanent certificateJEFFREY BELLenergy_progress
Latest 25 of 53.
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/23/2026Q00980896-I1Request digital key ↗
08/23/2026Q00980896-P3Request digital key ↗
08/23/2026Q00980896-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026Q00980896-P1Open ↗
08/13/2026Q00980896-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00980896-I1Open ↗
▸Seals & Professional Certifications36
▸DOB NOWProgress Inspector Seal & Signature21
08/31/2026Q00980896-I1Open ↗
08/31/2026Q00980896-I1Open ↗
08/31/2026Q00980896-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/31/2026Q00980896-I1Open ↗
08/27/2026Q00980896-P3Open ↗
08/25/2026Q00980896-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/23/2026Q00980896-P3Open ↗
08/23/2026Q00980896-P2Open ↗
08/23/2026Q00980896-P1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00980896-I1Open ↗
08/13/2026Q00980896-P1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/23/2026Q00980896-P2Open ↗
08/23/2026Q00980896-S1Open ↗
08/23/2026Q00980896-I1Open ↗
Showing 3 of 6 on file for this type
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/23/2026Q00980896-I1Open ↗
08/14/2026Q00980896-P1Open ↗