← Back
Walk-up apt, over six families with stores
61-13 UTOPIA PARKWAY
QUEENS · BIN 4623885
💬 Discuss this project
2021Year Built
3Stories
C7Building Class
R3-2Zoning
7,270 sfGross Floor Area
8Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: UNITED 4141 LLC · 12,308 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
Plumbing
Roof1p · 1 filing · 17 docs
Cellar1p · 1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROYAL BUILDERS GROUP807/08/2026
UNITED 41411203/22/2026
TAN DEVELOPMENT403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/29/2019$1.5M—Private party → UNITED 4141 LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PIROOZ ENGINEERING, P.C.710/13/2023
ENTHINK ENGINEERS LLC105/18/2022
ROYAL ENGINEERING, P.C110/07/2019
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TAN DEVELOPMENT, LLCGeneral Contractor1007/08/2026
METRO CONTRACTING NY, INC.General Contractor307/08/2026
PREET & M CONSTRUCTIONGeneral Contractor303/21/2026
YAFE MEOD CORPGeneral Contractor303/21/2026
ALL PRO PLBG & HTG INCFire Protection207/08/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PIROOZ ENGINEERING P.C7177610/13/2023
TRIANGLE INSPECTION & TES7495108/12/2020
Building Lifecycle
All (80)Filed (9)Permit Issued (13)Signed Off (6)Violation (8)Inspection (8)Objection (10)Special Inspection (26)
05/11/2026
Violation issued (HPD, open)
A
11/21/2025
Violation issued (HPD, open)
I
06/16/2025
Violation issued (HPD, open)
A
01/18/2024
Signed off — Alteration
Q00228011-I1
01/16/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q00739476-I1
01/05/2024
Signed off — Alteration
Q00943631-I1
01/04/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/02/2024
Signed off — Alteration
Q00340719-I1
12/26/2023
Permit issued — Curb Cut
Q00943631-I1-CC
11/17/2023
Violation issued (ECB, closed)
Construction
11/14/2023
Signed off — Alteration
APPLICATION FILED FOR MECHANICAL WORK TYPE IN CONJUNCTION WITH NB APPLICATION #421905834
Q00342213-I1
10/25/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/23/2023
Permit issued — Sprinklers
Q00340719-I1-EW-SP
10/23/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/17/2023
Special inspection requirement — Mechanical Systems
PIROOZ SOLTANIZADEH
10/17/2023
Special inspection requirement — Final
JAN PEREZ
10/17/2023
Special inspection requirement — HVAC and service water heating system controls
PIROOZ SOLTANIZADEH
10/17/2023
Special inspection requirement — HVAC and service water heating equipment
PIROOZ SOLTANIZADEH
10/17/2023
Special inspection requirement — Shutoff dampers
PIROOZ SOLTANIZADEH
10/17/2023
Special inspection requirement — HVAC insulation and sealing
PIROOZ SOLTANIZADEH
10/17/2023
Special inspection requirement — Heating Systems
PIROOZ SOLTANIZADEH
10/13/2023
Filed — Alteration
APPLICATION FILED FOR MECHANICAL WORK TYPE IN CONJUNCTION WITH NB APPLICATION #421905834
Q00342213-P2
10/06/2023
Signed off — Alteration
INSTALLATION OF NEW PLUMBING SYSTEM IN CONJUNCTION WITH NB JOB# 421905834
Q00370028-I1
10/05/2023
Special inspection requirement — Mechanical Systems
PIROOZ SOLTANIZADEH
10/05/2023
Special inspection requirement — Final
JAN PEREZ
10/05/2023
Special inspection requirement — Shutoff dampers
PIROOZ SOLTANIZADEH
10/05/2023
Special inspection requirement — HVAC and service water heating system controls
PIROOZ SOLTANIZADEH
10/05/2023
Special inspection requirement — HVAC and service water heating equipment
PIROOZ SOLTANIZADEH
10/05/2023
Special inspection requirement — HVAC insulation and sealing
PIROOZ SOLTANIZADEH
10/05/2023
Special inspection requirement — Heating Systems
PIROOZ SOLTANIZADEH
10/04/2023
Filed — Alteration
Q00943631-I1
10/03/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/22/2023
Permit issued — Construction Fence
Q00228011-I1-FN
09/22/2023
Permit issued — Mechanical Systems
Q00342213-I1-MS
08/29/2023
Permit issued — Sidewalk Shed
Q00739476-I1-SH
11/29/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/09/2022
Permit issued — Construction Fence
Q00228011-I1-FN
11/07/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/13/2022
Violation issued (ECB, closed)
Construction
10/06/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/06/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/30/2022
Permit issued — Mechanical Systems
Q00342213-I1-MS
08/22/2022
Violation issued (ECB, closed)
Unknown
08/22/2022
Violation issued (ECB, closed)
Construction
08/17/2022
Permit issued — Plumbing
Q00370028-I1-PL
08/15/2022
Permit issued — Sprinklers
Q00340719-I1-EW-SP
07/15/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
07/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
07/15/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PIROOZ SOLTANIZADEH
07/15/2022
Special inspection requirement — HVAC insulation and sealing
PIROOZ SOLTANIZADEH
07/15/2022
Special inspection requirement — HVAC and service water heating system controls
PIROOZ SOLTANIZADEH
07/15/2022
Special inspection requirement — HVAC and service water heating equipment
PIROOZ SOLTANIZADEH
07/09/2022
Filed — Alteration
INSTALLATION OF NEW PLUMBING SYSTEM IN CONJUNCTION WITH NB JOB# 421905834
Q00370028-P2
06/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
06/16/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PIROOZ SOLTANIZADEH
06/16/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
06/16/2022
Special inspection requirement — HVAC and service water heating equipment
PIROOZ SOLTANIZADEH
06/16/2022
Special inspection requirement — HVAC and service water heating system controls
PIROOZ SOLTANIZADEH
06/16/2022
Special inspection requirement — HVAC insulation and sealing
PIROOZ SOLTANIZADEH
06/01/2022
Permit issued — Sidewalk Shed
Q00739476-I1-SH
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offYAFE MEOD CORP12/26/2023
DOB NOWSprinklersSigned-offALL PRO PLBG & HTG INC10/23/2023
DOB NOWConstruction FenceSigned-offTAN DEVELOPMENT, LLC09/22/2023
DOB NOWMechanical SystemsSigned-offTAN DEVELOPMENT, LLC09/22/2023
DOB NOWSidewalk ShedSigned-offMETRO CONTRACTING NY, INC.08/29/2023
DOB NOWConstruction FenceSigned-offTAN DEVELOPMENT, LLC11/09/2022
DOB NOWMechanical SystemsSigned-offTAN DEVELOPMENT, LLC08/30/2022
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC08/17/2022
DOB NOWSprinklersSigned-offALL PRO PLBG & HTG INC08/15/2022
DOB NOWSidewalk ShedSigned-offMETRO CONTRACTING NY, INC.06/01/2022
DOB NOWSidewalk ShedSigned-offPREET & M CONSTRUCTION05/18/2022
DOB NOWConstruction FenceSigned-offTAN DEVELOPMENT, LLC09/28/2021
DOB NOWConstruction FenceSigned-offTAN DEVELOPMENT, LLC08/25/2021
BIS—ISSUEDYAFE MEOD CORP09/20/2023
BISOTRE-ISSUEDAMERGY SOLAR INC01/19/2023
BIS—ISSUEDTAN DEVELOPMENT, LLC08/30/2022
BIS—ISSUEDTAN DEVELOPMENT, LLC08/30/2022
BIS—ISSUEDTAN DEVELOPMENT, LLC03/28/2022
BIS—ISSUEDTAN DEVELOPMENT, LLC03/18/2022
4 projects · most recent 02/27/2024
General Wiring
FiledStatusContractorScope
02/27/2024CompleteSKY ELECTRIC LLCGeneral Wiring
04/06/2023CompleteI.P. ELECTRIC INC—
09/28/2022CompleteSKY ELECTRIC LLCGeneral Wiring
05/18/2022CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
01/04/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
10/25/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/23/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/03/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/29/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/07/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/06/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/06/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
10/17/2023Mechanical SystemsPIROOZ SOLTANIZADEHspecial
10/17/2023FinalJAN PEREZprogress
10/17/2023HVAC and service water heating system controls PIROOZ SOLTANIZADEHenergy_progress
10/17/2023HVAC and service water heating equipment PIROOZ SOLTANIZADEHenergy_progress
10/17/2023Shutoff dampersPIROOZ SOLTANIZADEHenergy_progress
10/17/2023HVAC insulation and sealing PIROOZ SOLTANIZADEHenergy_progress
10/17/2023Heating SystemsPIROOZ SOLTANIZADEHspecial
10/05/2023Mechanical SystemsPIROOZ SOLTANIZADEHspecial
10/05/2023FinalJAN PEREZprogress
10/05/2023Shutoff dampersPIROOZ SOLTANIZADEHenergy_progress
10/05/2023HVAC and service water heating system controls PIROOZ SOLTANIZADEHenergy_progress
10/05/2023HVAC and service water heating equipment PIROOZ SOLTANIZADEHenergy_progress
10/05/2023HVAC insulation and sealing PIROOZ SOLTANIZADEHenergy_progress
10/05/2023Heating SystemsPIROOZ SOLTANIZADEHspecial
07/15/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
07/15/2022Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
07/15/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
07/15/2022HVAC insulation and sealing PIROOZ SOLTANIZADEHenergy_progress
07/15/2022HVAC and service water heating system controls PIROOZ SOLTANIZADEHenergy_progress
07/15/2022HVAC and service water heating equipment PIROOZ SOLTANIZADEHenergy_progress
06/16/2022Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
06/16/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
06/16/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
06/16/2022HVAC and service water heating equipment PIROOZ SOLTANIZADEHenergy_progress
06/16/2022HVAC and service water heating system controls PIROOZ SOLTANIZADEHenergy_progress
Latest 25 of 26.
▾Documents — 221 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch - Plumbing3
08/28/2026Q00370028-I1Request digital key ↗
08/15/2026Q00370028-P1Request digital key ↗
08/15/2026Q00370028-P2Request digital key ↗
▸DOB NOWPlans/Sketch2
08/26/2026Q00739476-I1Request digital key ↗
08/24/2026Q00943631-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/28/2026Q00342213-P2Request digital key ↗
08/15/2026Q00342213-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00228011-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/28/2026Q00340719-I1Request digital key ↗
▸Applications & Permits34
▸BISPLAN / WORK APPROVAL APPLICATION25
05/11/2023440764317Open ↗
02/21/2023421779757Open ↗
01/18/2023440764317Open ↗
Showing 3 of 25 on file for this type
▸BISWORK PERMIT APPLICATION6
01/24/2024421905834Open ↗
12/20/2023421905834Open ↗
01/19/2023440764317Open ↗
Showing 3 of 6 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
11/03/2023421779757Open ↗
12/23/2019421779757Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
02/20/2024421779757Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISZONING DIAGRAM2
03/16/2022421905834Open ↗
05/10/2021421905834Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
05/10/2021421905834Open ↗
▸BISVERIFY TAX LOT1
04/11/2024421905834Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
05/10/2021421905834Open ↗
▸Seals & Professional Certifications37
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026Q00342213-P2Open ↗
09/01/2026Q00342213-P2Open ↗
09/01/2026Q00342213-P2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/28/2026Q00342213-P2Open ↗
08/28/2026Q00342213-I1Open ↗
08/28/2026Q00340719-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026Q00342213-P2Open ↗
09/01/2026Q00342213-P2Open ↗
09/01/2026Q00342213-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
05/31/2022421905834Open ↗
11/14/2019421905834Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/18/2023440764317Open ↗
▸Trade Schedules & Equipment3
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
04/11/2024421905834Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
04/11/2024421905834Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
04/11/2024421905834Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST4
05/10/2021421905834Open ↗
02/15/2021421905834Open ↗
12/23/2019421779757Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE SIGNOFF2
04/11/2024421905834Open ↗
02/17/2024421779757Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
02/22/2022421905834Open ↗
▸Energy Compliance23
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
09/24/2023440764317Open ↗
01/18/2023440764317Open ↗
02/25/2022421905834Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
04/11/2024421905834Open ↗
09/24/2023440764317Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
04/11/2024421905834Open ↗
▸BISINTERIOR LIGHTING POWER1
04/11/2024421905834Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
04/11/2024421905834Open ↗
▸BISFENESTRATION AREAS1
04/11/2024421905834Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
04/11/2024421905834Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
01/18/2023440764317Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
09/24/2023440764317Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
04/11/2024421905834Open ↗
▸BISLIGHTING IN DWELLING UNITS1
04/11/2024421905834Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/11/2024421905834Open ↗
▸BISELECTRIC MOTORS1
04/11/2024421905834Open ↗
▸BISLIGHTING CONTROLS1
04/11/2024421905834Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00342213-I1Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY4
04/11/2024421905834Open ↗
09/24/2023440764317Open ↗
01/18/2023440764317Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
04/22/2024421905834Open ↗
05/31/2022421905834Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
02/24/2024421905834Open ↗
02/22/2022421905834Open ↗
▸BISBPP - Inspection Appointment Form1
02/20/2024421779757Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
04/11/2024421905834Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
04/11/2024421905834Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
04/11/2024421905834Open ↗
▸BISMASONRY1
04/11/2024421905834Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
04/11/2024421905834Open ↗
▸Approvals, Objections & Sign-offs18
▸BISSCHEDULE A - OCCUPANCY / USE11
03/07/2022421905834Open ↗
02/28/2022421905834Open ↗
02/25/2022421905834Open ↗
Showing 3 of 11 on file for this type
▸BISSUPERSEDING LETTER2
01/24/2024421905834Open ↗
12/20/2023421905834Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/25/2023440764317Open ↗
12/23/2019421779757Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/25/2023440764317Open ↗
▸BISBPP-UTILITY APPROVAL TO RELOCATE POLE1
04/17/2020421779757Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
02/15/2021421905834Open ↗
▸Cost, Insurance & Ownership5
▸BISPROJECT-SPECIFIC GL INSURANCE2
01/24/2024421905834Open ↗
05/31/2022421905834Open ↗
▸BISCOST AFFIDAVIT1
01/18/2023440764317Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
02/20/2024421779757Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
09/24/2023440764317Open ↗
▸Filing & Intake Forms23
▸BISADDITIONAL INFORMATION18
04/24/2024421905834Open ↗
04/24/2024421905834Open ↗
04/24/2024421905834Open ↗
Showing 3 of 18 on file for this type
▸BISBOROUGH INTAKE FORM2
04/23/2025421905834Open ↗
01/24/2024421905834Open ↗
▸BISEFILING COVER SHEET2
12/23/2019421779757Open ↗
11/14/2019421905834Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
12/23/2019421779757Open ↗
▸Other Documents17
▸BISBPP - SUPPORTING DOCUMENTATION5
02/20/2024421779757Open ↗
02/20/2024421779757Open ↗
04/17/2020421779757Open ↗
Showing 3 of 5 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION5
04/24/2024421905834Open ↗
10/02/2021421905834Open ↗
10/02/2021421905834Open ↗
Showing 3 of 5 on file for this type
▸BISPLOT DIAGRAM3
05/10/2021421905834Open ↗
05/10/2021421905834Open ↗
11/14/2019421905834Open ↗
▸BISSHUTOFF DAMPERS1
04/11/2024421905834Open ↗
▸BISLOWEST FLOOR ELEVATION1
04/11/2024421905834Open ↗
▸BISMAINTENANCE INFORMATION1
04/11/2024421905834Open ↗
▸BISPERMANENT CERTIFICATE1
04/11/2024421905834Open ↗