| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 10/17/2023 | $984K | — | — → — | — not available |
| Firm | Filings | Most Recent |
|---|---|---|
| BAYSIDE ENGINEERING PC | 4 | 02/16/2024 |
| TIMES BUILDINGS ENGINEERING SERVICE | 1 | 10/25/2023 |
| Representative | Filings | Most Recent |
|---|---|---|
| ZHENG & ASSOCIATES LLC | 8 | 03/21/2026 |
| MEIYUN CHEN | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| L2 CONSTRUCTION INC | General Contractor | 9 | 07/08/2026 |
| WASOFF PLBG & UTILITY CO | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| SD TESTING & INSPECTION S | 7010 | 2 | 02/16/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Curb Cut | Signed-off | L2 CONSTRUCTION INC | 06/25/2025 |
| DOB NOW | Plumbing | Signed-off | WASOFF PLBG & UTILITY CO | 08/14/2024 |
| DOB NOW | General Construction | Permit Issued | L2 CONSTRUCTION INC | 04/25/2024 |
| DOB NOW | Full Demolition | Signed-off | L2 CONSTRUCTION INC | 04/03/2024 |
| DOB NOW | Construction Fence | Signed-off | L2 CONSTRUCTION INC | 04/03/2024 |
| DOB NOW | Construction Fence | Signed-off | L2 CONSTRUCTION INC | 03/26/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 02/16/2024 | Signed-off | L2 CONSTRUCTION INC | Associated Ducts and Piping, Heating Systems | Heating A.O. Smith XCG 50 400 50,000 BTU · Water Heater ×2 Williamson GWA-100-N-T 100,000 BTU · Boiler ×2 Ducts & Piping Delta Breeze SLIM50 20 CFM · Exhaust Fan ×7 Air King EB30BL 130 CFM · Kitchen Exhaust ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/16/2024 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/16/2024 | Signed-off | WASOFF PLBG & UTILITY CO | Gas, Plumbing-Sprinkler, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/26/2024 | Complete | ERIC & NG ELEC'L, INC. | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/16/2024 | Signed-off | L2 CONSTRUCTION INC | Steel, Concrete, Wood |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/16/2024 | Signed-off | L2 CONSTRUCTION INC | Fence |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/16/2024 | Signed-off | L2 CONSTRUCTION INC | Earthwork |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/07/2025 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 05/14/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 04/25/2025 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 09/06/2024 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 09/06/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/22/2024 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 08/22/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 07/30/2024 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 02/16/2024 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | XIUCHENG LI | special |
| 02/16/2024 | Maintenance information | XIUCHENG LI | energy_progress |
| 02/16/2024 | HVAC-R and service water heating system controls | XIUCHENG LI | energy_progress |
| 02/16/2024 | Metering | XIUCHENG LI | energy_progress |
| 02/16/2024 | HVAC-R and service water heating equipment | XIUCHENG LI | energy_progress |
| 02/16/2024 | Fenestration areas | XIUCHENG LI | energy_progress |
| 02/16/2024 | Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities | XIUCHENG LI | special |
| 02/16/2024 | Sprinkler Systems | XIUCHENG LI | special |
| 02/16/2024 | Chimneys and vents | XIUCHENG LI | special |
| 02/16/2024 | HVAC-R and service water piping design and insulation | XIUCHENG LI | energy_progress |
| 12/20/2023 | Protection of exposed foundation insulation | XIUCHENG LI | energy_progress |
| 11/25/2023 | Duct leakage testing, insulation and design | XIUCHENG LI | energy_progress |
| 11/25/2023 | Concrete - Cast-In-Place | XIUCHENG LI | special |
| 11/25/2023 | Excavations - Sheeting, Shoring, and Bracing | XIUCHENG LI | special |
| 11/25/2023 | Fire-Resistant Penetrations and Joints | XIUCHENG LI | special |
| 11/25/2023 | Heating Systems | XIUCHENG LI | special |
| 11/25/2023 | Masonry | XIUCHENG LI | special |
| 11/25/2023 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | XIUCHENG LI | special |
| 11/25/2023 | Structural Steel - High Strength Bolting | XIUCHENG LI | special |
| 11/25/2023 | Structural Steel - Welding | XIUCHENG LI | special |
| 11/25/2023 | Subgrade Inspections | XIUCHENG LI | special |
| 11/25/2023 | Subsurface Investigations (Borings/Test Pits) | TONY ONYEAGORO | special |
| 11/25/2023 | Interior lighting power | XIUCHENG LI | energy_progress |
| 11/25/2023 | Fenestration air leakage | XIUCHENG LI | energy_progress |
| 11/25/2023 | Maintenance information | XIUCHENG LI | energy_progress |