← Back
Elevator cooperative
Park City Estates
61-15 98 STREET · Rego Park · BIN 4431962
💬 Discuss this project
1960Year Built
16Stories
D4Building Class
R7-1Zoning
580,800 sfGross Floor Area
420Units
LL97 CoveredRent Stabilized81 Open Violations 77 unresolved · 4 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: PARK CITY ESTATES TENANTS CORP · 184,356 sf lot · 3.15 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY509/15/2026
ROCK GROUP NY507/08/2026
AKAM ASSOCIATES1004/09/2026
CENTRAL CONST MANAGEMENT304/09/2026
HOBO CONSTRUCTION CO103/22/2026
PARK CITY ESTATES TENANTS CORP1903/22/2026
ELM MANAGEMENT ASSOC.303/22/2026
PARK CITY ESTATES503/21/2026
STEEL INDUSTRIES303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALWAYS FAST SERVICES CORP103/17/2026
CRUICKSHANKS ENGINEERING & CONSULTI206/24/2025
O'DONNELL ARCHITECTS, LLC103/19/2025
ASIF JAMIL, RA109/18/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIERARCH-E203/21/2026
CH BUILDING CONSULTANTS203/21/2026
HS DESIGN STUDIO203/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLATINUM SERVICES NY LLCGeneral Contractor309/13/2026
JIMENEZ LUISElectrical103/21/2026
JOHN JR MARIElectrical103/21/2026
LUIS JIMENEZElectrical103/21/2026
MAGUIRE, SHAWNElectrical103/21/2026
SUTTON, ALEXElectrical103/21/2026
WEISS, NORMANElectrical103/21/2026
CENTRAL CONSTRUCTION MANAGEMENTGeneral Contractor104/09/2026
POFI CONSTRUCTION CORPGeneral Contractor104/09/2026
COLE, VINCENTElectrical103/21/2026
ROCK GROUP NY CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
O'DONNELL ARCHITECTS LLC9012103/19/2025
Building Lifecycle
All (92)Filed (6)Permit Issued (8)Signed Off (3)Facade (FISP) (13)Violation (60)Special Inspection (2)
09/11/2026
Permit issued — Sidewalk Shed
Q01372161-I1-SH
06/08/2026
Permit issued — Sidewalk Shed
Q01372161-I1-SH
04/17/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT
Q01211387-I1
03/23/2026
Permit issued — General Construction
Q01192502-I1-GC
03/18/2026
Permit issued — Sidewalk Shed
Q01372161-I1-SH
03/17/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q01372161-I1
03/09/2026
Permit issued — Suspended Scaffold
Q01192502-S1-SC
03/06/2026
Signed off — Alteration
Installation of a heavy duty sidewalk shed to include storage.
Q01237124-I1
03/02/2026
Filed — Alteration
EXTERIOR REPAIRS CONSISTING OF POINTING, BRICK REPLACEMENT, STONE POINTING, BRICK PINNING, PARAPET REBUILDING, BALCONY CONCRETE PATCHING, BALCONY EDGE AND CEILING SCRAPING AND COATING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01192502-S1
02/26/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
George Xerakias
02/26/2026
Special inspection requirement — Post-installed anchors in masonry
George Xerakias
11/21/2025
Violation issued (HPD, closed)
I
06/24/2025
Filed — Alteration
Installation of a heavy duty sidewalk shed to include storage.
Q01237124-I1
06/24/2025
Permit issued — Sidewalk Shed
Q01237124-I1-SH
05/05/2025
Permit issued — Suspended Scaffold
Q01211387-I1-SC
05/02/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT
Q01211387-I1
03/19/2025
Filed — Alteration
EXTERIOR REPAIRS CONSISTING OF POINTING, BRICK REPLACEMENT, STONE POINTING, BRICK PINNING, PARAPET REBUILDING, BALCONY CONCRETE PATCHING, BALCONY EDGE AND CEILING SCRAPING AND COATING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01192502-I1
02/21/2024
Cycle 9 facade report submitted
02/21/2024
Cycle 9 facade report signed — SWARMP
02/16/2024
Cycle 9 facade inspection completed
02/23/2023
Violation issued (HPD, closed)
C
02/23/2023
Violation issued (HPD, open)
A
02/23/2023
Violation issued (HPD, open)
C
01/21/2023
Signed off — Alteration
Q00074742-I1
11/28/2022
Violation issued (HPD, open)
C
11/28/2022
Violation issued (HPD, closed)
C
11/28/2022
Violation issued (HPD, closed)
C
11/28/2022
Violation issued (HPD, closed)
C
11/28/2022
Violation issued (HPD, closed)
C
11/28/2022
Violation issued (HPD, closed)
C
11/28/2022
Violation issued (HPD, closed)
C
07/23/2022
Violation issued (HPD, open)
C
03/31/2021
Violation issued (HPD, open)
B
03/31/2021
Violation issued (HPD, open)
B
11/06/2019
Violation issued (HPD, closed)
I
04/19/2019
Violation issued (ECB, closed)
Construction
02/21/2019
Cycle 8 facade report submitted
02/14/2019
Cycle 8 facade report signed — SWARMP
02/05/2019
Cycle 8 facade inspection completed
09/21/2018
Permit issued — Sidewalk Shed
Q00074742-I1-SH
09/18/2018
Filed — Alteration
Q00074742-I1
10/11/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/11/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/27/2017
Violation issued (FDNY_NOV, closed)
01/19/2017
Violation issued (ECB, open)
Construction
06/19/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/19/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/01/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/01/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/14/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/14/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/14/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/14/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/15/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/18/2012
Cycle 7 facade report submitted
04/03/2012
Cycle 7 facade report signed — SAFE
03/08/2012
Cycle 7 facade inspection completed
02/07/2012
Cycle 6 facade report submitted
09/23/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/23/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC09/11/2026
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC06/08/2026
DOB NOWGeneral ConstructionPermit IssuedPOFI CONSTRUCTION CORP03/23/2026
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC03/18/2026
DOB NOWSuspended ScaffoldPermit IssuedPOFI CONSTRUCTION CORP03/09/2026
DOB NOWSidewalk ShedSigned-offCENTRAL CONSTRUCTION MANAGEMENT06/24/2025
DOB NOWSuspended ScaffoldPermit IssuedCENTRAL CONSTRUCTION MGMT05/05/2025
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP09/21/2018
BISOTISSUEDHOBO CONSTRUCTION CO02/14/2019
BISOTISSUEDHOBO CONSTRUCTION CO09/28/2018
BISEQISSUEDYATES REST GROUP LTD05/13/2011
BISEQISSUEDSTEEL INSUSTRIES, INC04/27/2011
BISEQISSUEDYATES REST GROUP LTD08/23/2010
BISEQISSUEDSTEEL INSUSTRIES, INC11/27/2009
BISOTISSUEDYATES REST GROUP LTD10/01/2009
BISEQISSUEDSTEEL INSUSTRIES, INC09/10/2009
BISOTISSUEDQUALITY BUILDING CONSTRUTION12/24/2007
BISEQISSUEDSTEEL INDUSTRIES INC12/11/2007
BISEQISSUEDSTEEL INDUSTRIES INC10/04/2007
BISOTISSUEDCIRIETTI-TOLISANO ASSOC. INC09/18/2003
BISMHISSUEDCIRIETTI-TOLISANO ASSOC. INC07/01/2003
BISOTISSUEDCIRIETTI-TOLISANO ASSOC. INC07/01/2003
BISOTISSUEDQUALITY BUILDING CONTRACTOR10/23/2002
BIS—ISSUEDALL COUNTY RESTORATION07/14/1992
9 projects · most recent 03/17/2026
General Wiring
FiledStatusContractorScope
03/17/2026Permit IssuedRICHARD NEU—
06/24/2025Permit IssuedTOP SHELF ELECTRIC CORP—
07/20/2022CompleteS.A.L. ELECTRIC CO INC.—
12/10/2021CompleteSHUIR ELEC'L CONTR'S CORPGeneral Wiring
12/10/2021CompleteSHUIR ELEC'L CONTR'S CORPGeneral Wiring
12/10/2021CompleteSHUIR ELEC'L CONTR'S CORPGeneral Wiring
03/17/2021CompleteCENTENNIAL ELEVATOR INDUSGeneral Wiring
08/28/2020CompleteOMAS ELECTRIC INC—
08/24/2018CompleteTOP SHELF ELECTRIC CORP—
1 project · most recent 03/17/2026
Sidewalk Shed
FiledStatusContractorScope
03/17/2026Permit IssuedPLATINUM SERVICES NY LLCSidewalk Shed
1 project · most recent 03/02/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
03/02/2026Permit IssuedPOFI CONSTRUCTION CORPSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
02/26/2026Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
02/26/2026Post-installed anchors in masonryGeorge Xerakiasspecial
▾Documents — 115 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/28/2026Q00074742-I1Request digital key ↗
08/20/2026Q01211387-I1Request digital key ↗
08/19/2026Q01237124-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits24
▸BISWORK PERMIT APPLICATION13
11/01/2019421912434Open ↗
02/15/2019421676760Open ↗
12/12/2018421676760Open ↗
Showing 3 of 13 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION11
02/10/2020421676760Open ↗
11/01/2019421912434Open ↗
02/04/2019421676760Open ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications33
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
01/30/2020421912434Open ↗
11/01/2019421912434Open ↗
10/25/2018421676760Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
11/01/2019421912434Open ↗
10/25/2018421676760Open ↗
05/04/2011420349331Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/28/2026Q00074742-I1Open ↗
08/19/2026Q01237124-I1Open ↗
08/17/2026Q01192502-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
05/04/2011420349331Open ↗
08/24/2010420237327Open ↗
09/10/2009420077231Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
11/01/2019421912434Open ↗
10/25/2018421676760Open ↗
▸BISPC FULL REPORT2
12/03/2007410042458Open ↗
10/01/2007410009734Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026Q01192502-S1Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
11/01/2019421912434Open ↗
12/01/2018421676760Open ↗
10/25/2018421676760Open ↗
▸Environmental & Asbestos9
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
09/10/2009420077231Open ↗
12/03/2007410042458Open ↗
10/01/2007410009734Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
05/04/2011420349331Open ↗
08/24/2010420237327Open ↗
06/30/2009420043410Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/01/2019421912434Open ↗
10/25/2018421676760Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026Q01192502-I1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
01/30/2020421912434Open ↗
11/01/2019421912434Open ↗
10/25/2018421676760Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/30/2020421912434Open ↗
▸Inspections & Test Reports1
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
01/30/2020421912434Open ↗
▸Approvals, Objections & Sign-offs13
▸BISADMINISTRATIVE OBJECTIONS6
05/04/2011420349331Open ↗
08/24/2010420237327Open ↗
09/10/2009420077231Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
01/30/2020421912434Open ↗
01/24/2012420043410Open ↗
11/05/2009410009734Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
11/05/2009410009734Open ↗
01/30/2009410042458Open ↗
▸BISSHED LETTER1
12/18/2010420077231Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT9
01/30/2020421912434Open ↗
11/01/2019421912434Open ↗
10/25/2018421676760Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET6
11/01/2019421912434Open ↗
10/25/2018421676760Open ↗
05/04/2011420349331Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION3
01/13/2020421912434Open ↗
12/01/2018421676760Open ↗
11/26/2010420043410Open ↗
▸Other Documents4
▸DOB NOWManufacturer's Specifications2
08/13/2026Q01192502-S1Open ↗
08/13/2026Q01211387-I1Open ↗
▸DOB NOWCalculations2
08/13/2026Q01192502-S1Open ↗
08/13/2026Q01211387-I1Open ↗