Elevator cooperative
61-20 GRAND CENTRAL PARKWAY
QUEENS · Forest Hills · BIN 4445338
💬 Discuss this project
1965Year Built
14Stories
D4Building Class
R4Zoning
428,836 sfGross Floor Area
424Units
LL97 CoveredRent Stabilized51 Open Violations 43 unresolved · 8 paperwork only ▸FISP: UNSAFEFDNY Report ↗
Elevator cooperative · Owner of record: FAIRVIEW OWNERS CORP · 199,965 sf lot · 2.14 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
Roof3p · 2 filings · 6 docs
Floor 11p · 1 filing · 8 docs
CellarUnder Construction16p · 3 filings · 20 docs
Site & exteriorUnder Construction6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FAIRVIEW OWNERS8309/01/2026
ACE GROUP NY707/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAND ENGINEERING & ARCHITECTURE DPC304/11/2026
SKYLINE RIGGING312/15/2025
ASR ENGINEERING PC105/02/2025
EN-POWER GROUP801/09/2025
ASHRAF CORP308/29/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J A EXPEDITING1603/21/2026
JULIAN A. GOMEZ403/21/2026
RIGGINING CONSULTANTS103/21/2026
Rigid Structural Design, LLC303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INTERSYSTEMS INSTAL S&SGeneral Contractor1007/08/2026
INTERSYSTEM INSTALLATIONGeneral Contractor603/21/2026
CC CONTROLLED PLBG CO.,INPlumbing507/08/2026
ACE GROUP NY CORPGeneral Contractor507/22/2026
WINDHAM RESTORATION CORPGeneral Contractor409/01/2026
XINOS CONSTRUCTION CORPGeneral Contractor307/08/2026
INTERSYSTEM CONSTRUCTIONGeneral Contractor209/19/2026
C C CONTROLLED COMBUSTIONGeneral Contractor204/09/2026
CRYSTAL COMFORT INCGeneral Contractor203/21/2026
DELUXE ELECL & MAINT CORPElectrical103/22/2026
JOSEPH ADAMOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RAND ENGINEERING & ARCHIT266304/11/2026
SKYLINE RIGGING7880312/15/2025
AFM INSPECTIONS & ENGINEE4675201/09/2025
GROUP-S LLC52161001/09/2025
Building Lifecycle
All (182)Filed (19)Permit Issued (29)Signed Off (5)Facade (FISP) (18)Violation (60)Inspection (17)Objection (4)Special Inspection (30)
09/18/2026
Permit issued — Construction Fence
Q00925828-I1-FN
08/31/2026
Permit issued — General Construction
Q01166293-I1-GC
08/08/2026
Violation issued (HPD, open)
A
07/27/2026
Violation issued (HPD, closed)
C
07/27/2026
Violation issued (HPD, open)
A
07/27/2026
Violation issued (HPD, open)
B
07/20/2026
Permit issued — Sidewalk Shed
Q01219398-I1-SF
07/15/2026
Violation issued (HPD, open)
B
07/15/2026
Violation issued (HPD, open)
B
07/15/2026
Violation issued (HPD, open)
B
07/15/2026
Violation issued (HPD, open)
C
07/15/2026
Violation issued (HPD, open)
C
07/15/2026
Violation issued (HPD, open)
C
07/14/2026
Cycle 10 facade report submitted
07/14/2026
Cycle 10 facade report signed — UNSAFE
07/02/2026
Violation issued (HPD, open)
B
07/02/2026
Violation issued (HPD, open)
A
07/02/2026
Violation issued (HPD, open)
A
07/02/2026
Violation issued (HPD, open)
B
07/02/2026
Violation issued (HPD, open)
C
06/26/2026
Violation issued (HPD, open)
B
06/26/2026
Violation issued (HPD, closed)
C
06/26/2026
Violation issued (HPD, open)
B
06/26/2026
Violation issued (HPD, open)
C
06/26/2026
Violation issued (HPD, open)
B
06/26/2026
Violation issued (HPD, open)
A
06/24/2026
Cycle 10 facade inspection completed
06/22/2026
Violation issued (HPD, open)
C
06/22/2026
Violation issued (HPD, open)
A
06/22/2026
Violation issued (HPD, open)
A
06/22/2026
Violation issued (HPD, closed)
C
06/22/2026
Violation issued (HPD, open)
B
06/22/2026
Violation issued (HPD, closed)
C
06/22/2026
Violation issued (HPD, open)
A
06/22/2026
Violation issued (HPD, open)
A
06/22/2026
Violation issued (HPD, closed)
C
06/22/2026
Violation issued (HPD, open)
A
06/22/2026
Violation issued (HPD, open)
A
06/22/2026
Violation issued (HPD, open)
A
05/15/2026
Violation issued (HPD, open)
B
05/15/2026
Violation issued (HPD, open)
C
05/15/2026
Violation issued (HPD, open)
B
05/15/2026
Violation issued (HPD, open)
B
05/15/2026
Violation issued (HPD, open)
B
05/15/2026
Violation issued (HPD, open)
C
05/14/2026
Violation issued (HPD, closed)
C
05/01/2026
Signed off — Alteration
Limited Garage & Laundry Room Repair Program, No change to use, occupancy or egress.
Q00790851-I1
04/22/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/20/2026
Violation issued (ECB, open)
Local Law
04/15/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/11/2026
Filed — Alteration
Q01166293-P1
04/07/2026
Violation issued (FDNY_ORDER, closed)
04/07/2026
Violation issued (FDNY_NOV, closed)
04/01/2026
Special inspection requirement — Energy Code Compliance Inspections
John Monroe
04/01/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
John Monroe
04/01/2026
Special inspection requirement — Post-installed Anchors
John Monroe
04/01/2026
Special inspection requirement — Final
John Monroe
04/01/2026
Special inspection requirement — Air barrier - visual inspection
John Monroe
04/01/2026
Special inspection requirement — Masonry
John Monroe
04/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
John Monroe
Latest 60 of 182 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedINTERSYSTEM CONSTRUCTION09/18/2026
DOB NOWGeneral ConstructionPermit IssuedWINDHAM RESTORATION CORP08/31/2026
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP07/20/2026
DOB NOWSuspended ScaffoldPermit IssuedWINDHAM RESTORATION CORP03/30/2026
DOB NOWSidewalk ShedPermit IssuedINTERSYSTEM CONSTRUCTION01/27/2026
DOB NOWBoiler EquipmentPermit IssuedCC CONTROLLED PLBG CO.,IN11/13/2025
DOB NOWGeneral ConstructionPermit IssuedWINDHAM RESTORATION CORP08/14/2025
DOB NOWConstruction FencePermit IssuedINTERSYSTEMS INSTAL S&S08/04/2025
DOB NOWSidewalk ShedPermit IssuedINTERSYSTEMS INSTAL S&S08/04/2025
DOB NOWSuspended ScaffoldPermit IssuedWINDHAM RESTORATION CORP07/15/2025
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP05/06/2025
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP05/06/2025
DOB NOWPlumbingPermit IssuedCC CONTROLLED PLBG CO.,IN01/27/2025
DOB NOWSidewalk ShedPermit IssuedINTERSYSTEMS INSTAL S&S08/28/2024
DOB NOWConstruction FencePermit IssuedINTERSYSTEMS INSTAL S&S08/28/2024
DOB NOWBoiler EquipmentPermit IssuedCC CONTROLLED PLBG CO.,IN07/23/2024
DOB NOWBoiler EquipmentPermit IssuedCC CONTROLLED PLBG CO.,IN03/21/2024
DOB NOWGeneral ConstructionSigned-offC C CONTROLLED COMBUSTION03/12/2024
DOB NOWStructuralSigned-offC C CONTROLLED COMBUSTION03/08/2024
DOB NOWPlumbingPermit IssuedCC CONTROLLED PLBG CO.,IN03/08/2024
DOB NOWStructuralSigned-offXINOS CONSTRUCTION CORP03/05/2024
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM01/08/2024
DOB NOWConstruction FencePermit IssuedINTERSYSTEMS INSTAL S&S08/30/2023
DOB NOWSidewalk ShedPermit IssuedINTERSYSTEMS INSTAL S&S08/30/2023
DOB NOWGeneral ConstructionSigned-offXINOS CONSTRUCTION CORP03/03/2023
DOB NOWGeneral ConstructionSigned-offXINOS CONSTRUCTION CORP02/08/2023
DOB NOWMechanical SystemsSigned-offCRYSTAL COMFORT10/13/2022
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION09/28/2022
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION02/09/2022
BISOTISSUEDXINOS CONSTRUCTION CORP03/09/2022
BISOTISSUEDXINOS CONSTRUCTION CORP04/07/2021
BISPLISSUEDADVANCED PLUMBING MECH04/23/2019
BISOTISSUEDGROUP S LLC10/16/2017
BISOTISSUEDEC ELECTRICAL CONTRACTOR10/10/2017
BISPLISSUEDG.BASSOLINO PLUMBING LTD05/01/2017
BISMHISSUEDGROUP S LLC05/01/2017
BISPLISSUEDVMC PLUMBING & HEATING IN01/13/2017
BISOTISSUEDPRECISION INNOVATIONS NY12/29/2016
BISOTISSUEDMCFAR CONSTRUCTION LTD11/16/2016
BISOTISSUEDMCFAR CONSTRUCTION LTD11/24/2015
+ 17 more permits on file
1 project · most recent 01/09/2025
Gas Water/Sanitary
FiledStatusContractorScope
01/09/2025Permit IssuedCC CONTROLLED PLBG CO.,INGas, Water/Sanitary
8 projects · most recent 07/21/2026
General Wiring Boiler Controls
FiledStatusContractorScope
07/21/2026CompleteKRAFT ELECTRIC CORPBoiler Controls
06/03/2026Permit IssuedICON ELECTRIC INC—
05/05/2025Permit IssuedICON ELECTRIC INCGeneral Wiring
01/09/2025CompleteS.A.L. ELECTRIC CO INC.—
11/27/2024Permit IssuedHYLAN DATACOM & ELECL LLC1 meters, 1 new_meters
08/17/2023Permit IssuedAUR0RA ELECL CONTG INC—
01/28/2022CompleteSTEVEN FARKAS—
01/18/2018CompleteDELUXE ELECL & MAINT CORPGeneral Wiring
1 project · most recent 01/09/2025
Steel Concrete
FiledStatusContractorScope
01/09/2025Permit IssuedCC CONTROLLED PLBG CO.,INSteel, Concrete
3 projects · most recent 05/02/2025
Sidewalk Shed Scaffold Fence
FiledStatusContractorScope
05/02/2025Permit IssuedACE GROUP NY CORPScaffold, Sidewalk Shed
08/29/2023Permit IssuedINTERSYSTEM CONSTRUCTIONSidewalk Shed
08/29/2023Permit IssuedINTERSYSTEM CONSTRUCTIONFence
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
04/22/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/15/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/16/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
10/03/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/03/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/30/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/25/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
06/25/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
06/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/12/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/22/2025Fail-Final Boiler Equipment InspectionFailView ↗
02/04/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
10/31/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 68
DateRequirementInspectorRole
04/01/2026MasonryJohn Monroespecial
04/01/2026Alternative Materials - OTCR Buildings Bulletin NumberJohn Monroespecial
04/01/2026Air barrier - visual inspectionJohn Monroeenergy_progress
04/01/2026FinalJohn Monroeprogress
04/01/2026Energy Code Compliance InspectionsJohn Monroeprogress
04/01/2026Tenant Protection Plan ComplianceJohn Monroespecial
04/01/2026Structural Stability – Alterations of existing buildingsJohn Monroespecial
04/01/2026Post-installed AnchorsJohn Monroespecial
12/15/2025Post-installed AnchorsZELJKO STEVANOVICspecial
12/12/2025Post-installed AnchorsZELJKO STEVANOVICspecial
07/15/2025Post-installed AnchorsZELJKO STEVANOVICspecial
01/15/2025Structural Steel - High Strength BoltingAnthony Marmospecial
01/15/2025FinalMICHAEL SCORRANOprogress
01/15/2025Tenant Protection Plan ComplianceMICHAEL SCORRANOspecial
01/15/2025Structural Steel - DetailsAnthony Marmospecial
01/15/2025Chimneys and ventsMICHAEL SCORRANOspecial
01/15/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)MICHAEL SCORRANOspecial
01/15/2025Structural Steel - WeldingAnthony Marmospecial
01/14/2025HVAC-R and service water heating system controlsMICHAEL SCORRANOenergy_progress
01/14/2025Tenant Protection Plan ComplianceMICHAEL SCORRANOspecial
01/14/2025Heating SystemsMICHAEL SCORRANOspecial
01/14/2025Fire-Resistant Penetrations and JointsMICHAEL SCORRANOspecial
01/14/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)MICHAEL SCORRANOspecial
01/14/2025HVAC-R and service water piping design and insulationMICHAEL SCORRANOenergy_progress
01/14/2025HVAC-R and service water heating equipmentMICHAEL SCORRANOenergy_progress
Latest 25 of 68.
▾Documents — 355 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/26/2026Q00674889-I1Request digital key ↗
08/25/2026Q00790851-I1Request digital key ↗
08/25/2026Q00786806-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits54
▸BISPLAN / WORK APPROVAL APPLICATION28
12/22/2022440430295Open ↗
12/22/2022440401735Open ↗
11/16/2022440430295Open ↗
Showing 3 of 28 on file for this type
▸BISWORK PERMIT APPLICATION25
04/24/2019421662597Open ↗
10/22/2017421527994Open ↗
10/16/2017440430295Open ↗
Showing 3 of 25 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
07/19/2017440370554Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISFLOOD ZONE COMPLIANCE2
11/10/2022440401735Open ↗
04/07/2021440652688Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION2
08/30/2017440430295Open ↗
04/28/2017440401735Open ↗
▸Seals & Professional Certifications93
▸DOB NOWSpecial Inspector Seal & Signature25
09/23/2026Q00911340-S2Open ↗
09/23/2026Q00911340-S2Open ↗
09/23/2026Q00911340-S1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/25/2026Q00786806-I1Open ↗
08/25/2026Q00786806-P1Open ↗
08/24/2026Q00925812-I1Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
03/19/2020421662597Open ↗
05/08/2019421527994Open ↗
05/04/2019421662597Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026Q00911340-S2Open ↗
09/23/2026Q00911340-S1Open ↗
09/23/2026Q00911340-S1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
05/04/2019421662597Open ↗
04/28/2017440401735Open ↗
12/15/2016440370554Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
12/14/2020440652688Open ↗
04/28/2017440401735Open ↗
12/15/2016440370554Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
04/28/2017440401735Open ↗
12/15/2016440370554Open ↗
11/04/2015440265259Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
05/04/2019421662597Open ↗
06/16/2015421175855Open ↗
Showing 2 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
12/14/2020440652688Open ↗
08/30/2017440430295Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment26
▸BISSCHEDULE B - PLUMBING8
04/28/2017440401735Open ↗
12/15/2016440370554Open ↗
07/20/2010420200259Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT7
03/07/2011420200259Open ↗
10/15/2010420200259Open ↗
09/24/2010420200259Open ↗
Showing 3 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
06/08/2011420200259Open ↗
05/25/2011420200259Open ↗
04/25/2011420200259Open ↗
Showing 3 of 6 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION3
05/25/2011420200259Open ↗
09/15/2010420115663Open ↗
09/15/2010420115663Open ↗
▸BISWATER METER PERMIT : DEP-METER2
05/25/2011420200259Open ↗
05/25/2011420200259Open ↗
▸Safety & Tenant Protection5
▸BISTENANT PROTECTION PLAN AND NOTES3
04/28/2017440401735Open ↗
12/15/2016440370554Open ↗
08/30/2017440430295Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
04/07/2021440652688Open ↗
▸Environmental & Asbestos26
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/25/2026Q00786806-P1Open ↗
08/25/2026Q00786806-I1Open ↗
08/21/2026Q00911340-P3Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
12/14/2020440652688Open ↗
05/04/2019421662597Open ↗
08/30/2017440430295Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/25/2026Q00790851-I1Open ↗
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
05/08/2019421527994Open ↗
05/04/2019421662597Open ↗
07/19/2017440370554Open ↗
Showing 3 of 5 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS3
02/22/2023440430295Open ↗
11/10/2022440401735Open ↗
03/30/2021440652688Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
12/14/2020440652688Open ↗
08/30/2017440430295Open ↗
04/28/2017440401735Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
05/08/2019421527994Open ↗
11/17/2017421175855Open ↗
07/19/2017440370554Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
12/14/2020440652688Open ↗
12/15/2016440370554Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
02/22/2023440430295Open ↗
11/10/2022440401735Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
04/06/2023440430295Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
02/22/2023440430295Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
11/04/2015440265259Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
08/30/2017440430295Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY7
03/30/2021440652688Open ↗
12/14/2020440652688Open ↗
08/30/2017440430295Open ↗
Showing 3 of 7 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
02/22/2023440430295Open ↗
11/10/2022440401735Open ↗
▸BISPOST-INSTALLED ANCHORS1
03/17/2021440652688Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
02/22/2023440430295Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
03/31/2021440652688Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
03/10/2021440652688Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
03/31/2021440652688Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
03/17/2021440652688Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
03/17/2021440652688Open ↗
▸BISNOTIF-PROPOSED STEAM-HOT WATER INSPECTION1
05/25/2011420200259Open ↗
▸Approvals, Objections & Sign-offs24
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
04/07/2023440430295Open ↗
11/14/2022440401735Open ↗
05/08/2019421527994Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFINAL3
02/22/2023440430295Open ↗
11/10/2022440401735Open ↗
03/17/2021440652688Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
11/17/2017421175855Open ↗
12/15/2011420200259Open ↗
02/15/2011420181403Open ↗
▸BISPTA4: TAX ABATEMENT ELIGIBILITY APPROVAL1
02/22/2023440430295Open ↗
▸BISFINAL ELECTRICAL SIGNOFF1
04/07/2023440430295Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026Q00790851-I1Open ↗
▸Cost, Insurance & Ownership24
▸BISCOST AFFIDAVIT18
12/14/2020440652688Open ↗
05/08/2019421527994Open ↗
05/04/2019421662597Open ↗
Showing 3 of 18 on file for this type
▸BISLL58/88-CIVIL PENALTY AFFIDAVIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
02/22/2023440430295Open ↗
11/10/2022440401735Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
12/15/2016440370554Open ↗
▸Filing & Intake Forms25
▸BISADDITIONAL INFORMATION9
01/09/2023440430295Open ↗
04/07/2021440652688Open ↗
01/02/2019421527994Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET8
05/04/2019421662597Open ↗
07/13/2017421527994Open ↗
06/16/2015421175855Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
12/14/2020440652688Open ↗
08/30/2017440430295Open ↗
04/28/2017440401735Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM2
04/08/2019421527994Open ↗
11/17/2017421175855Open ↗
▸Other Documents13
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS3
12/14/2020440652688Open ↗
08/30/2017440430295Open ↗
04/28/2017440401735Open ↗
▸DOB NOWManufacturer's Specifications3
08/13/2026Q01255815-P2Open ↗
08/13/2026Q01255815-P1Open ↗
08/13/2026Q01255815-I1Open ↗
▸DOB NOWCalculations3
08/13/2026Q01255815-P2Open ↗
08/13/2026Q01255815-P1Open ↗
08/13/2026Q01255815-I1Open ↗
▸DOB NOWDHCR Document2
08/17/2026Q01166293-P1Open ↗
08/13/2026Q01166293-I1Open ↗
▸BISEMERGENCY & STANDBY POWER SYSTEMS (GENERATORS)1
11/10/2022440401735Open ↗
▸DOB NOWIRA Certification1
08/13/2026Q00969133-I1Open ↗