← Back
Two family brick
61-23 37 AVENUE
QUEENS · Woodside · BIN 4027445
💬 Discuss this project
1925Year Built
2Stories
B1Building Class
R5Zoning
2,160 sfGross Floor Area
2Units
6 Open Violations ▸
Two family brick · 2,264 sf lot · 0.95 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 22p · 1 filing · 15 docs
Floor 1
Cellar1p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LEVERICH DESIGN STUDIO607/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/28/2021$1.2M—— → —$546/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC101/04/2024
ANTHONY CUCICH ARCHITECT312/08/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
LEVERICH DESIGN STUDIO INC.303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
ALDANA, NEFTALYElectrical103/21/2026
SCHLEISSMAN, BElectrical103/21/2026
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272101/04/2024
ANTHONY CUCICH ARCHITECT6081212/08/2023
AR-TECH ENGINEERING, P.C.6659102/07/2022
Building Lifecycle
All (31)Filed (4)Permit Issued (2)Signed Off (2)Violation (14)Inspection (2)Special Inspection (7)
05/06/2024
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00977698-I1
01/12/2024
Permit issued — Solar
Q00977698-I1-SL
01/04/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00977698-I1
01/04/2024
Signed off — Alteration
Adding 1 (one) three-piece bathroom to 1st floor, 2nd floor, and cellar. Adding washer/ Dryer on 2nd floor.
Q00528894-I1
12/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY CUCICH
12/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
12/15/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
12/15/2023
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
12/15/2023
Special inspection requirement — Final
Walid Abdulla
12/15/2023
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
12/08/2023
Filed — Alteration
Adding 1 (one) three-piece bathroom to 1st floor, 2nd floor, and cellar. Adding washer/ Dryer on 2nd floor.
Q00528894-P2
11/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY CUCICH
08/15/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/11/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/25/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/07/2022
Filed — Alteration
Adding 1 (one) three-piece bathroom to 1st floor, 2nd floor, and cellar. Adding washer/ Dryer on 2nd floor.
Q00528894-P1
01/05/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/18/2021
Permit issued — Plumbing
Q00528894-I1-PL
07/22/2021
Filed — Alteration
Adding 1 (one) three-piece bathroom to 1st floor, 2nd floor, and cellar. Adding washer/ Dryer on 2nd floor.
Q00528894-I1
05/21/2021
Violation issued (ECB, closed)
Construction
07/31/2018
Violation issued (ECB, closed)
Construction
08/06/2014
Violation issued (HPD, open)
B
08/06/2014
Violation issued (HPD, open)
B
08/06/2014
Violation issued (HPD, open)
B
08/06/2014
Violation issued (HPD, open)
B
02/27/2014
Violation issued (HPD, open)
B
02/27/2014
Violation issued (HPD, open)
B
06/18/2009
Violation issued (ECB, closed)
Unknown
06/18/2009
Violation issued (ECB, closed)
Unknown
03/22/2005
Violation issued (ECB, closed)
Quality of Life
03/22/2005
Violation issued (ECB, closed)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC01/12/2024
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING11/18/2021
BISOTISSUEDELITE ILLUSION CONSTRUCT02/02/2023
BISOTISSUEDELITE ILLUSION CONSTRUCT11/19/2021
BISOTISSUEDSUNRUN INSTALLATION SVC08/31/2021
BISOTISSUEDELITE ILLUSION CONSTRUCT07/21/2021
2 projects · most recent 01/03/2024
General Wiring
FiledStatusContractorScope
01/03/2024CompleteSUNRUN SOLAR ELECTL CORP—
06/29/2022CompleteALL-RITE ELECT CORP OF NYGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/25/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/05/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
12/21/2023Fire-Resistant Penetrations and JointsANTHONY CUCICHspecial
12/15/2023Fire-Resistant Penetrations and JointsWalid Abdullaspecial
12/15/2023Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
12/15/2023Energy Code Compliance InspectionsWalid Abdullaprogress
12/15/2023FinalWalid Abdullaprogress
12/15/2023Air barrier - visual inspectionWalid Abdullaenergy_progress
11/06/2023Fire-Resistant Penetrations and JointsANTHONY CUCICHspecial
▾Documents — 94 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026Q00528894-I1Request digital key ↗
08/26/2026Q00528894-P1Request digital key ↗
08/26/2026Q00528894-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION9
09/28/2023440672504Open ↗
09/25/2023440672504Open ↗
07/11/2023440672504Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION3
12/27/2021440672504Open ↗
08/31/2021440687044Open ↗
07/21/2021440672504Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWRestrictive Declaration/Easement 13
08/13/2026Q00528894-I1Open ↗
08/13/2026Q00528894-P2Open ↗
08/13/2026Q00528894-P1Open ↗
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
07/07/2021440672504Open ↗
▸Seals & Professional Certifications15
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q00528894-I1Open ↗
08/29/2026Q00977698-I1Open ↗
08/29/2026Q00977698-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026Q00528894-I1Open ↗
08/26/2026Q00528894-P1Open ↗
08/26/2026Q00528894-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026Q00977698-I1Open ↗
08/29/2026Q00977698-I1Open ↗
08/29/2026Q00977698-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/30/2021440687044Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
06/14/2021440672504Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/30/2021440687044Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/30/2021440687044Open ↗
▸Trade Schedules & Equipment2
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
10/24/2023440672504Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
10/24/2023440672504Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
08/31/2021440687044Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026Q00528894-P1Open ↗
08/26/2026Q00528894-I1Open ↗
08/26/2026Q00528894-P2Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
08/30/2021440687044Open ↗
07/07/2021440672504Open ↗
04/21/2021440672504Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
08/17/2023440672504Open ↗
06/06/2023440672504Open ↗
05/26/2023440672504Open ↗
Showing 3 of 7 on file for this type
▸BISINTERIOR LIGHTING POWER1
10/24/2023440672504Open ↗
▸BISNYCECC ANALYSIS1
08/30/2021440687044Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
08/30/2021440687044Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
10/24/2023440672504Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/24/2023440672504Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
10/24/2023440672504Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/30/2021440687044Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
10/24/2023440672504Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
04/21/2021440672504Open ↗
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY9
08/17/2023440672504Open ↗
08/17/2023440672504Open ↗
06/06/2023440672504Open ↗
Showing 3 of 9 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
10/24/2023440672504Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
10/24/2023440672504Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
10/24/2023440672504Open ↗
▸BISMASONRY1
10/24/2023440672504Open ↗
▸BISDOB FINAL INSPECTION REQUIRED1
10/24/2023440672504Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
10/24/2023440672504Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION3
08/30/2021440687044Open ↗
07/07/2021440672504Open ↗
07/07/2021440672504Open ↗
▸BISSUPERSEDING LETTER1
08/04/2023440672504Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/25/2023440672504Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q00977698-I1Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
06/06/2023440672504Open ↗
08/30/2021440687044Open ↗
06/14/2021440672504Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
10/24/2023440672504Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION6
10/25/2023440672504Open ↗
10/25/2023440672504Open ↗
10/25/2023440672504Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
08/30/2021440687044Open ↗
06/14/2021440672504Open ↗