← Back
Two family converted from one family
61-28 183 STREET
QUEENS · BIN 4152771
💬 Discuss this project
1950Year Built
2Stories
B3Building Class
R3-2Zoning
2,664 sfGross Floor Area
2Units
Two family converted from one family · 4,500 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMERILAND BROOK LLC211/21/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XH&RC PLUMBING AND HEATING INC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TGC CONSTRUCTION INCGeneral Contractor903/21/2026
Building Lifecycle
All (8)Filed (2)Permit Issued (3)Signed Off (2)Special Inspection (1)
11/27/2020
Signed off — Alteration
NEW 18.0' PAIRED DROP CURB WITH 1.5' SPLAY ON EACH SIDE.
Q00169016-I1
11/24/2020
Permit issued — Curb Cut
Q00169016-I1-CC
11/21/2020
Filed — Alteration
NEW 18.0' PAIRED DROP CURB WITH 1.5' SPLAY ON EACH SIDE.
Q00169016-I1
11/19/2020
Signed off — Alteration
FILE CONSTRUCTION FENCE AT ABOVE ADDRESS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00153059-I1
12/11/2019
Permit issued — Construction Fence
Q00153059-I1-FN
08/22/2019
Permit issued — Construction Fence
Q00153059-I1-FN
08/21/2019
Filed — Alteration
FILE CONSTRUCTION FENCE AT ABOVE ADDRESS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00153059-I1
04/10/2019
Special inspection requirement — Final
XIAOHONG ZHAO
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offTGC CONSTRUCTION INC11/24/2020
DOB NOWConstruction FenceSigned-offTGC CONSTRUCTION INC12/11/2019
DOB NOWConstruction FenceSigned-offTGC CONSTRUCTION INC08/22/2019
BISPLISSUEDWASOFF PLBG & UTILITY CO06/30/2021
BIS—ISSUEDTT&T CONSTRUCTION INC12/23/2020
BIS—ISSUEDTGC CONSTRUCTION INC12/10/2019
BISPLISSUEDWASOFF PLBG & UTILITY CO11/01/2019
BIS—ISSUEDT&S HOME IMPROVEMENT INC08/23/2019
2 projects · most recent 10/01/2019
General Wiring
FiledStatusContractorScope
10/01/2019CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
10/01/2019CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
04/10/2019FinalXIAOHONG ZHAOprogress
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Curb Cut1
08/27/2026Q00169016-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00153059-I1Request digital key ↗
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION6
05/07/2021421740673Open ↗
04/19/2021421740673Open ↗
02/18/2020421740673Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION6
01/21/2021421740673Open ↗
12/13/2019421740673Open ↗
11/07/2019421740673Open ↗
Showing 3 of 6 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
05/03/2019421948539Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/21/2021421740673Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISZONING DIAGRAM1
07/25/2019421740673Open ↗
▸BISVERIFY TAX LOT1
09/08/2021421740673Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/08/2021421740673Open ↗
▸Seals & Professional Certifications8
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
08/28/2019421740673Open ↗
08/28/2019421740673Open ↗
07/24/2019421740673Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/28/2026Q00153059-I1Open ↗
08/13/2026Q00169016-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026Q00153059-I1Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING2
05/07/2021421740673Open ↗
04/19/2021421740673Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
08/15/2019421740673Open ↗
03/27/2019421740673Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
05/03/2019421948539Open ↗
03/27/2019421740673Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
08/28/2019421740673Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/28/2019421740673Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/24/2019421740673Open ↗
05/06/2019421740673Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/28/2019421740673Open ↗
03/27/2019421740673Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/21/2021421740673Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/06/2022421740673Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
05/26/2021421740673Open ↗
04/21/2021421740673Open ↗
▸BISSOIL PERC. TEST-STORM WATER SYSTEM (DRYWELL)1
04/21/2021421740673Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
07/24/2019421740673Open ↗
▸Approvals, Objections & Sign-offs10
▸BISSCHEDULE A - OCCUPANCY / USE4
05/07/2021421740673Open ↗
04/19/2021421740673Open ↗
12/30/2019421740673Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
05/26/2021421740673Open ↗
06/01/2020421948539Open ↗
▸BISSUPERSEDING LETTER2
01/21/2021421740673Open ↗
12/13/2019421740673Open ↗
▸BIS1 CAR DETACHED GARAGE SIGNOFF.1
01/12/2022421740673Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
09/09/2021421948539Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT1
03/27/2019421740673Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/06/2022421740673Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
01/21/2021421740673Open ↗
▸Filing & Intake Forms10
▸BISADDITIONAL INFORMATION6
09/15/2021421740673Open ↗
09/08/2021421740673Open ↗
06/17/2021421740673Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET2
05/03/2019421948539Open ↗
03/27/2019421740673Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
05/03/2019421948539Open ↗
▸BISBOROUGH INTAKE FORM1
01/21/2021421740673Open ↗
▸Other Documents3
▸BISPLOT DIAGRAM3
09/08/2021421740673Open ↗
07/24/2019421740673Open ↗
03/27/2019421740673Open ↗