← Back
Two family brick
61-33 PALMETTO STREET
QUEENS · Ridgewood · BIN 4087658
💬 Discuss this project
1920Year Built
2Stories
B1Building Class
R5BZoning
3,492 sfGross Floor Area
2Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Two family brick · Owner of record: A&J MANAGEMENT GROUP, LLC · 2,000 sf lot · 1.75 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalGeneral
Filed — no permit issued5p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Gramer103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHEUNG SHOWMAN ARCHITECTS101/29/2025
Building Lifecycle
All (18)Filed (1)Violation (6)Objection (2)Special Inspection (9)
11/25/2025
Violation issued (HPD, open)
I
02/27/2025
Objection resolved — Addressed
02/10/2025
Objection raised — Other
01/29/2025
Filed — Alteration
INTERIOR RENOVATION OF EXIST. 2-STORY + CELLAR 2-FAMILY DWELLING. REPLACE INTERIOR FINISHES AND CABINETRY THROUGHOUT. NEW SPLIT SYSTEM AC AND HEATING SYSTEM WITH NEW HEAT PUMPS INSTALLED IN REAR YARD. NO CHANGE TO EGRESS, USE, OCCUPANCY OR BULK.
Q01168340-I1
01/29/2025
Special inspection requirement — Maintenance information
01/29/2025
Special inspection requirement — Metering
01/29/2025
Special inspection requirement — Permanent certificate
01/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
01/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
01/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
01/16/2025
Special inspection requirement — Lighting in dwelling units
01/16/2025
Special inspection requirement — Final
Esther Cheung
01/16/2025
Special inspection requirement — Mechanical Systems
12/04/2024
Violation issued (HPD, closed)
I
09/22/2023
Violation issued (HPD, closed)
I
09/20/2023
Violation issued (HPD, closed)
B
09/20/2023
Violation issued (HPD, closed)
B
09/20/2023
Violation issued (HPD, open)
C
Nothing on file for this building.
1 project · most recent 01/29/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/29/2025——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-3C24NA 24,000 BTU · Heat Pump Outdoor ×1
MXZ-3C30NAHZ3 30,000 BTU · Heat Pump Outdoor ×1
MXZ-SM36NAMHZ 36,000 BTU · Heat Pump Outdoor ×1
1 project · most recent 04/13/2025
General Wiring
FiledStatusContractorScope
04/13/2025CompleteGREENTECH ELECTRIC CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
01/29/2025Maintenance information—energy_progress
01/29/2025Metering—energy_progress
01/29/2025Permanent certificate—energy_progress
01/29/2025HVAC-R and service water heating equipment—energy_progress
01/29/2025HVAC-R and service water piping design and insulation—energy_progress
01/29/2025HVAC-R and service water heating system controls—energy_progress
01/16/2025Lighting in dwelling units—energy_progress
01/16/2025FinalEsther Cheungprogress
01/16/2025Mechanical Systems—special
▾Documents — 5 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026Q01168340-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWProgress Inspector Seal & Signature2
08/31/2026Q01168340-I1Open ↗
08/31/2026Q01168340-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/21/2026Q01168340-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026Q01168340-I1Open ↗