Two family brick
61-41 161ST STREET
QUEENS · BIN 4146903
💬 Discuss this project
1935Year Built
2Stories
B1Building Class
R4Zoning
2,062 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family brick · 4,000 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof3p · 2 filings · 20 docs
Attic1p · 1 filing · 20 docs
Floor 27p · 1 filing · 20 docs
Floor 128p · 1 filing · 20 docs
Cellar10p · 2 filings · 20 docs
Site & exterior28p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
6141 Realty2607/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/30/2024$2.2M—6141 Realty → Private party$1,062/sf building
05/03/2023$1.2M—Private party → 6141 Realty$563/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ameriland Brook705/20/2024
Synergic Design Architects104/11/2024
Gino O. Longo, Architect303/03/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L&L Construction DevelopmentGeneral Contractor303/21/2026
Vitello Sewer W.M. H&P ServicesPlumbing207/08/2026
Zaq ConstructionGeneral Contractor107/08/2026
L&L Construction DevelopmentScaffold107/08/2026
Accord Powerspecialty_contractor107/08/2026
DPH Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ameriland Brook1506505/20/2024
Synergic Design8561104/11/2024
Building Lifecycle
10/10/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALL 8' CONSTRUCTION FENCE AT THE ABOVE ADDRESS.
Q00907730-I1
09/04/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALL 8' CONSTRUCTION FENCE AT THE ABOVE ADDRESS.
Q00907730-S4
09/04/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALL 8' CONSTRUCTION FENCE AT THE ABOVE ADDRESS.
Q00907730-S2
07/16/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/12/2024
Signed off — Alteration
Q01025455-I1
75 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offZaq Construction06/10/2024
DOB NOWSolarSigned-offAccord Power04/19/2024
DOB NOWPlumbingSigned-offDPH Plumbing & Heating10/30/2023
DOB NOWEarth WorkPermit IssuedL&L Construction Development10/17/2023
DOB NOWConstruction FenceSigned-offL&L Construction Development10/12/2023
DOB NOWPlumbingSigned-offVitello Sewer W.M. H&P Services03/14/2023
DOB NOWPlumbingSigned-offVitello Sewer W.M. H&P Services01/09/2023
1 project · most recent 05/20/2024
Associated Ducts and Piping Heating Systems
FiledStatusContractorScope
05/20/2024Signed-offZaq ConstructionAssociated Ducts and Piping, Heating Systems
1 project · most recent 05/20/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/20/2024Signed-offDPH Plumbing & HeatingGas, Storm, Water/Sanitary
2 projects · most recent 06/27/2024
General Wiring
FiledStatusContractorScope
06/27/2024CompletePower Surge Electric—
10/23/2023CompleteKJK ElectricGeneral Wiring
1 project · most recent 05/20/2024
Steel Masonry Wood
FiledStatusContractorScope
05/20/2024Signed-offZaq ConstructionSteel, Masonry, Wood
1 project · most recent 05/20/2024
Fence
FiledStatusContractorScope
05/20/2024Signed-offZaq ConstructionFence
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
07/16/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
07/10/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
07/02/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/02/2024Pass-Final Fence Non-Directive 14PassView ↗
05/09/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/22/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/26/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/26/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/26/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/16/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/06/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/31/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/24/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
05/20/2024Interior lighting powerXIAOHONG ZHAOenergy_progress
05/20/2024Air barrier — testing XIAOHONG ZHAOenergy_progress
05/20/2024Fenestration air leakageXIAOHONG ZHAOenergy_progress
05/20/2024Fenestration and door U-factor and product ratingsXIAOHONG ZHAOenergy_progress
05/20/2024HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
05/20/2024Air barrier - visual inspectionXIAOHONG ZHAOenergy_progress
05/20/2024HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
05/20/2024MeteringXIAOHONG ZHAOenergy_progress
05/20/2024Ventilation and air distribution systemXIAOHONG ZHAOenergy_progress
05/20/2024Electric vehicle service equipment requirementsXIAOHONG ZHAOenergy_progress
05/20/2024HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
05/20/2024Permanent certificateXIAOHONG ZHAOenergy_progress
05/20/2024Fenestration areasXIAOHONG ZHAOenergy_progress
05/20/2024Maintenance informationXIAOHONG ZHAOenergy_progress
05/20/2024Duct leakage testing, insulation and designXIAOHONG ZHAOenergy_progress
05/20/2024Protection of exposed foundation insulationXIAOHONG ZHAOenergy_progress
05/20/2024Concrete - Cast-In-PlaceXIAOHONG ZHAOspecial
05/20/2024Excavations - Sheeting, Shoring, and BracingXIAOHONG ZHAOspecial
05/20/2024Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
05/20/2024Heating SystemsXIAOHONG ZHAOspecial
05/20/2024MasonryXIAOHONG ZHAOspecial
05/20/2024Mechanical SystemsXIAOHONG ZHAOspecial
05/20/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIAOHONG ZHAOspecial
05/20/2024Structural Stability – Alterations of existing buildingsXIAOHONG ZHAOspecial
05/20/2024Structural Steel - DetailsXIAOHONG ZHAOspecial
Latest 25 of 60.
82 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account