← Back
BuildNYC
Shopping center, with or without parking
Fresh Meadows Place Campus Parent
61-49 188TH STREET · BIN 4444049
💬 Discuss this project
1950Year Built
2Stories
K6Building Class
C4-2Zoning
136,500 sfGross Floor Area
26Units
LL97 Covered0 Active Violations 2 old, status unconfirmed ▸FDNY Report ↗
Shopping center, with or without parking · Owner of record: Street Retail · 364,775 sf lot · 0.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofDave's Hot Chicken, Starbucks14p · 2 filings · 20 docs
Floor 1Starbucks, Dave's Hot Chicken49p · 4 filings · 20 docs
CellarDave's Hot Chicken30p · 1 filing · 20 docs
Site & exteriorStarbucks, Dave's Hot Chicken +15p · 7 filings · 20 docs
Filed — no permit issuedErect illuminated sign for business establishment1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Federal Realty Investment Trust5510/13/2026
Street Retail603/22/2026
The Hutensky Group503/21/2026
LMW Joint Venture LLC Red Mango403/21/2026
Fresh Meadows Associates203/21/2026
Starbucks Coffee Company103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Catapano Engineering306/09/2026
Case Engineering1004/14/2026
Youn Design111/17/2024
Bianca V. Skvirsky, PE210/29/2024
Lingle Design Group107/12/2024
Leon Skvirsky PE410/02/2023
Emtec Consultants202/01/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Just Architecture2003/21/2026
Building Brothers803/21/2026
Bohler Engineering203/21/2026
Catapano Engineering403/21/2026
Louis Striar403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sdbov ConstructionGeneral Contractor707/08/2026
Capitol Awning Cospecialty_contractor307/08/2026
L.S. Sign CoSign hanger207/08/2026
Ultimate Signs & Designs CoSign hanger207/08/2026
Airtemp Mechanical Servicesspecialty_contractor107/08/2026
JCT Development NYGeneral Contractor104/09/2026
JCT Development NYScaffold107/08/2026
Bluewater Plumbing & HeatingPlumbing107/08/2026
National MaintenanceElectrical103/21/2026
John Fitzgerald Plumbing & HeatingPlumbing107/11/2026
R. Castaldo Electrical Cont IElectrical103/21/2026
Stat ElectricElectrical103/21/2026
Off Shore ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Hansen Engineering81741004/14/2026
Eti Consultants7694202/01/2022
Building Lifecycle
All (104)Filed (23)Permit Issued (14)Signed Off (12)Violation (9)Inspection (8)Objection (8)Special Inspection (30)
09/15/2026
Signed off — Alteration
Remove gas hot water heater (under application #421565764) and show installed Electric Hot Water Heater.
Q01408329-I1
09/02/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/28/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/15/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/10/2026
Permit issued — Plumbing
Q01408329-I1-PL
06/09/2026
Filed — Alteration
Remove gas hot water heater (under application #421565764) and show installed Electric Hot Water Heater.
Q01408329-I1
06/04/2026
Special inspection requirement — Maintenance information
JOHN CATAPANO
06/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN CATAPANO
06/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
JOHN CATAPANO
06/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOHN CATAPANO
05/27/2026
Special inspection requirement — Energy Code Compliance Inspections
JOHN CATAPANO
05/15/2026
Signed off — Alteration
Tenant buildout at cellar and first floor for Dave's Hot Chicken
Q01075386-S2
05/13/2026
Signed off — Alteration
Tenant buildout at cellar and first floor for Dave's Hot Chicken
Q01075386-S1
04/14/2026
Filed — Alteration
Tenant buildout at cellar and first floor for Dave's Hot Chicken
Q01075386-P7
04/08/2026
Special inspection requirement — Duct leakage testing, insulation and design
Ryan Hansen
04/08/2026
Special inspection requirement — Final
Ryan Hansen
04/08/2026
Special inspection requirement — Energy Code Compliance Inspections
Ryan Hansen
04/08/2026
Special inspection requirement — Mechanical Systems
Ryan Hansen
04/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
04/08/2026
Special inspection requirement — Maintenance information
Ryan Hansen
04/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
Ryan Hansen
04/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
Ryan Hansen
04/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Ryan Hansen
10/24/2025
Signed off — Alteration
Q00456851-I1
10/24/2025
Signed off — Alteration
Q00456975-I1
10/15/2025
Permit issued — Construction Fence
Q00456975-I1-FN
10/15/2025
Permit issued — General Construction
Q00456851-I1-GC
05/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Ryan Hansen
05/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
Ryan Hansen
05/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
05/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Ryan Hansen
05/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
Ryan Hansen
05/20/2025
Filed — Alteration
Tenant buildout at cellar and first floor for Dave's Hot Chicken
Q01075386-P6
05/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Ryan Hansen
05/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
Ryan Hansen
05/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Ryan Hansen
05/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
Ryan Hansen
05/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
02/12/2025
Filed — Alteration
Tenant buildout at cellar and first floor for Dave's Hot Chicken
Q01075386-P4
02/11/2025
Filed — Alteration
Tenant buildout at cellar and first floor for Dave's Hot Chicken
Q01075386-P5
01/07/2025
Signed off — Alteration
Q01118390-I1
01/07/2025
Signed off — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - DAVE'S HOT CHICKEN. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01118389-I1
12/11/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/17/2024
Filed — Alteration
Q01136650-I1
11/14/2024
Filed — Alteration
Tenant buildout at cellar and first floor for Dave's Hot Chicken
Q01075386-P3
11/13/2024
Permit issued — Sign
Q01118390-I1-SG
11/13/2024
Permit issued — Sign
Q01118389-I1-SG
11/07/2024
Special inspection requirement — HVAC-R and service water heating system controls
Ryan Hansen
11/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
11/07/2024
Special inspection requirement — Energy Code Compliance Inspections
Ryan Hansen
11/07/2024
Special inspection requirement — HVAC-R and service water heating equipment
Ryan Hansen
11/07/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Ryan Hansen
10/29/2024
Filed — Alteration
Q01118390-I1
10/29/2024
Filed — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - DAVE'S HOT CHICKEN. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01118389-I1
10/28/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ryan Hansen
10/21/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/21/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/14/2024
Filed — Alteration
Tenant buildout at cellar and first floor for Dave's Hot Chicken
Q01075386-P2
10/08/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
09/30/2024
Inspection — Fail-Final PL - Underground
Fail
View inspection ↗
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJohn Fitzgerald Plumbing & Heating07/10/2026
DOB NOWConstruction FenceSigned-offJCT Development NY10/15/2025
DOB NOWGeneral ConstructionSigned-offJCT Development NY10/15/2025
DOB NOWSignSigned-offWeinfeld, Elliot11/13/2024
DOB NOWSignSigned-offWeinfeld, Elliot11/13/2024
DOB NOWGeneral ConstructionSigned-offSdbov Construction08/05/2024
DOB NOWPlumbingSigned-offBluewater Plumbing & Heating07/31/2024
DOB NOWStructuralPermit IssuedSdbov Construction07/30/2024
DOB NOWMechanical SystemsSigned-offSdbov Construction07/30/2024
DOB NOWSignSigned-offUltimate Signs & Designs Co11/08/2023
DOB NOWSignSigned-offUltimate Signs & Designs Co11/08/2023
DOB NOWGeneral ConstructionSigned-offCapitol Awning Co10/26/2023
DOB NOWGeneral ConstructionSigned-offCapitol Awning Co10/24/2023
DOB NOWMechanical SystemsSigned-offAirtemp Mechanical Services01/12/2022
BISPLISSUEDVillage P & H NY03/13/2019
BISMHISSUEDNew York Community Bancor03/07/2019
BISMHISSUEDKerzner Contracting02/27/2019
BISOTISSUEDKerzner Contracting02/27/2019
BISPLISSUEDBranch Plumbing09/10/2018
BISPLISSUEDThe Plumbing & Heating Specialist02/21/2018
BISOTISSUEDAmerican Jersey Improve12/21/2017
BISMHISSUEDAirtemp Mechanical Services09/13/2017
BISMHISSUEDInterstate Mechanical Services04/10/2017
BISOTISSUEDInterstate Mechanical Services04/10/2017
BIS—ISSUEDNational Maintenance10/22/2015
BISOTISSUEDFive Star Awnings03/13/2013
BIS—ISSUEDNational Maintenance03/13/2013
BISPLISSUEDSchumacher & Farley P&H02/09/2012
BISOTISSUEDCustom Commercial Construction01/18/2012
BISOTISSUEDBerger Sign10/07/2010
BIS—ISSUEDL.S. Sign Co07/02/2010
BISPLISSUEDS & L Plumbing05/25/2010
BISOTISSUEDRichwood Interior05/19/2010
BISPLISSUEDAdvantage Plumbing & Amp; Mechanical09/24/2007
BISMHISSUEDPiece Management06/29/2007
BISOTISSUEDPiece Management06/29/2007
BISOTISSUEDFerrandino & Son07/21/2006
BIS—ISSUEDFive Town Neon Services02/18/1998
BISEQISSUEDAcc Construction02/05/1998
BISPLISSUEDArista PLG Heating & Piping08/04/1997
+ 11 more permits on file
1 project · most recent 04/14/2026
Air Conditioning Systems Heating and Air Conditioning Systems Others Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/14/2026Signed-offSdbov ConstructionAir Conditioning Systems, Heating and Air Conditioning Systems, Others, Refrigeration Systems
Cooling
Trane 4TTR4036 32,600 BTU · Condensing Unit ×4
Heat / Cool
Lennox LGH120H4M 4,000 CFM · Rooftop Unit ×6
Trane S9X1B040U3 800 CFM · Ahu ×4
Carrier 48FCEM12A3 4,000 CFM · Rooftop Unit ×2
48FCEA04A 960 CFM · Rooftop Unit ×1
Ventilation
Captiveaire A2-D.250-20D-MPU 2,400 CFM · Makeup Air ×4
Refrigeration
N/A n/a 1 CFM · Refrigeration Unit ×2
Other
Captiveaire DU180HFA 3,000 CFM · Exhaust Fan ×4
Greenheck G-090-VG 400 CFM · Exhaust Fan ×4
1 project · most recent 04/14/2026
FiledStatusContractorScope
04/14/2026——1 heads
2 projects · most recent 06/09/2026
Gas Water/Sanitary Plumbing-Sprinkler
FiledStatusContractorScope
06/09/2026Signed-offJohn Fitzgerald Plumbing & HeatingGas, Water/Sanitary
04/14/2026Signed-offBluewater Plumbing & HeatingGas, Plumbing-Sprinkler, Water/Sanitary
9 projects · most recent 07/12/2026
General Wiring
FiledStatusContractorScope
07/12/2026CompleteLebo ElectricGeneral Wiring
10/10/2024CompleteJoseph Weinstein ElectricGeneral Wiring
08/28/2024CompleteQueue Electrical ContractorsGeneral Wiring
08/15/2024CompleteQueue Electrical Contractors—
04/09/2024CompleteRainbow Electric Co—
04/09/2024CompleteRainbow Electric Co—
07/24/2019Permit IssuedOff Shore ElectricGeneral Wiring
06/26/2019Permit IssuedOff Shore Electric—
02/12/2018CompleteMaximum ElectricGeneral Wiring
1 project · most recent 04/14/2026
FiledStatusContractorScope
04/14/2026Signed-offSdbov Construction2 scope_items
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/02/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/28/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/15/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/21/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/21/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/08/2024Pass-Final PL - UndergroundPassView ↗
09/30/2024Fail-Final PL - UndergroundFailView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
06/04/2026Maintenance informationJOHN CATAPANOenergy_progress
06/04/2026HVAC-R and service water piping design and insulationJOHN CATAPANOenergy_progress
06/04/2026HVAC-R and service water heating system controlsJOHN CATAPANOenergy_progress
06/04/2026HVAC-R and service water heating equipmentJOHN CATAPANOenergy_progress
05/27/2026Energy Code Compliance InspectionsJOHN CATAPANOprogress
04/08/2026Duct leakage testing, insulation and designRyan Hansenenergy_progress
04/08/2026FinalRyan Hansenprogress
04/08/2026Energy Code Compliance InspectionsRyan Hansenprogress
04/08/2026Mechanical SystemsRyan Hansenspecial
04/08/2026Fire-Resistant Penetrations and JointsRyan Hansenspecial
04/08/2026Maintenance informationRyan Hansenenergy_progress
04/08/2026HVAC-R and service water heating equipmentRyan Hansenenergy_progress
04/08/2026HVAC-R and service water heating system controlsRyan Hansenenergy_progress
04/08/2026HVAC-R and service water piping design and insulationRyan Hansenenergy_progress
05/22/2025HVAC-R and service water piping design and insulationRyan Hansenenergy_progress
05/22/2025HVAC-R and service water heating system controlsRyan Hansenenergy_progress
05/22/2025Fire-Resistant Penetrations and JointsRyan Hansenspecial
05/22/2025Energy Code Compliance InspectionsRyan Hansenprogress
05/22/2025HVAC-R and service water heating equipmentRyan Hansenenergy_progress
05/16/2025Energy Code Compliance InspectionsRyan Hansenprogress
05/16/2025HVAC-R and service water heating equipmentRyan Hansenenergy_progress
05/16/2025HVAC-R and service water piping design and insulationRyan Hansenenergy_progress
05/16/2025HVAC-R and service water heating system controlsRyan Hansenenergy_progress
05/16/2025Fire-Resistant Penetrations and JointsRyan Hansenspecial
11/07/2024HVAC-R and service water heating system controlsRyan Hansenenergy_progress
Latest 25 of 52.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
StarbucksRestaurant / Food ServiceFloor 1
Project Q01408329 Alteration · LOC Issued · 06/09/2026
Project Q00456851 Alteration · LOC Issued · 02/18/2021
Project Q00456975 Alteration · LOC Issued · 02/18/2021
Project Q00373879 Alteration · LOC Issued · 09/10/2020
Dave's Hot ChickenRestaurant / Food ServiceCellar, Floor 1, Roof
Project Q01118389 Alteration · LOC Issued · 10/29/2024
Project Q01118390 Alteration · LOC Issued · 10/29/2024
Project Q01075386 Alteration · Permit Entire · 07/12/2024
Flagstar BankBank / Financial branchFloor 1
Project Q00923498 Alteration · LOC Issued · 10/02/2023
Project Q00923509 Alteration · LOC Issued · 10/02/2023
Project Q00924523 Alteration · LOC Issued · 10/02/2023
Project Q00924531 Alteration · LOC Issued · 10/02/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 334 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch19
08/24/2026Q00924523-I1Request digital key ↗
08/24/2026Q00923509-I1Request digital key ↗
08/24/2026Q00923498-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/28/2026Q00373879-I1Request digital key ↗
08/15/2026Q00373879-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00456975-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/27/2026Q00456851-I1Request digital key ↗
▸Applications & Permits50
▸BISPLAN / WORK APPROVAL APPLICATION26
01/29/2026421565764Open ↗
01/15/2026421565764Open ↗
08/13/2020421929747Open ↗
Showing 3 of 26 on file for this type
▸BISWORK PERMIT APPLICATION23
12/20/2019421929747Open ↗
03/14/2019421897200Open ↗
03/12/2019421929747Open ↗
Showing 3 of 23 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
04/17/2018440431873Open ↗
▸Seals & Professional Certifications119
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION34
03/23/2020421929747Open ↗
03/23/2020421929747Open ↗
03/01/2019421720454Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/27/2026Q00456851-I1Open ↗
08/27/2026Q00456975-I1Open ↗
08/24/2026Q00924523-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature21
09/01/2026Q01075386-S3Open ↗
09/01/2026Q00923509-I1Open ↗
09/01/2026Q00923498-I1Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST18
01/29/2026421565764Open ↗
01/15/2026421565764Open ↗
08/13/2020421929747Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
03/01/2019421897200Open ↗
03/01/2019421720454Open ↗
01/22/2019421929747Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026Q01075386-S3Open ↗
09/01/2026Q00373879-P1Open ↗
08/31/2026Q01075386-P1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
03/08/2013420809655Open ↗
01/18/2012420524276Open ↗
Showing 2 of 4 on file for this type
▸BISProfessional and Owner Certification (POC3)2
10/07/2010420259909Open ↗
10/07/2010420259892Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/12/2017440431873Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/12/2017440431873Open ↗
▸Trade Schedules & Equipment14
▸BISSELF-CERT PLUMBING NOTICE4
04/17/2012420524276Open ↗
03/23/2012420524276Open ↗
03/05/2012420524276Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING3
01/18/2012420524276Open ↗
Showing 1 of 3 on file for this type
▸BISEQUIPMENT USE PERMITS2
04/17/2018440431873Open ↗
04/17/2018440431873Open ↗
▸BISSIGN HANGER CERTIFICATE2
10/23/2015421195682Open ↗
03/16/2013420809655Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
03/01/2019421897200Open ↗
12/26/2017421565764Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
04/17/2018440431873Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
12/26/2017421565764Open ↗
▸Environmental & Asbestos31
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
08/27/2026Q00456851-I1Open ↗
08/24/2026Q00923498-I1Open ↗
08/21/2026Q01118390-I1Open ↗
Showing 3 of 18 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
01/22/2019421929747Open ↗
12/26/2017421565764Open ↗
04/14/2017421379608Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
01/18/2012420524276Open ↗
Showing 1 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
10/07/2010420259909Open ↗
10/07/2010420259892Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
03/01/2019421897200Open ↗
03/01/2019421720454Open ↗
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
03/23/2020421929747Open ↗
03/01/2019421897200Open ↗
03/01/2019421897200Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
03/23/2020421929747Open ↗
02/07/2019421379608Open ↗
04/17/2018440431873Open ↗
Showing 3 of 4 on file for this type
▸BISNYCECC ANALYSIS1
09/12/2017440431873Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/12/2017440431873Open ↗
▸BISTECHNICAL REPORT: ENERGY1
01/18/2012420524276Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/12/2017440431873Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00456851-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY3
01/28/2026421565764Open ↗
01/14/2026421565764Open ↗
09/12/2017440431873Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/15/2020421929747Open ↗
▸Approvals, Objections & Sign-offs23
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
08/17/2020421929747Open ↗
03/23/2020421929747Open ↗
03/06/2019421379608Open ↗
Showing 3 of 11 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
10/23/2015421195682Open ↗
03/08/2013420809646Open ↗
03/08/2013420809655Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/03/2013420809655Open ↗
04/03/2013420809646Open ↗
▸BISSUPERSEDING LETTER1
10/29/2018421565764Open ↗
▸Cost, Insurance & Ownership27
▸BISCOST AFFIDAVIT27
03/23/2020421929747Open ↗
03/01/2019421897200Open ↗
03/01/2019421720454Open ↗
Showing 3 of 27 on file for this type
▸Filing & Intake Forms21
▸BISEFILING COVER SHEET15
03/01/2019421897200Open ↗
03/01/2019421720454Open ↗
01/22/2019421929747Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION3
08/15/2020421929747Open ↗
06/15/2020421929747Open ↗
01/31/2019421379608Open ↗
▸BISBOROUGH INTAKE FORM2
01/17/2018420524276Open ↗
11/24/2017440431873Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/12/2017440431873Open ↗