ECB07/24/2026Failure to maintain building in code compliant manner. Service elevator equipment as per BC3001.2 & 27-987. Upon inspection, the device is found to be out of service, creating a hazardous condition per 1RCNY 11$6K due
ECB06/25/2026Failure to maintain device in code compliant manner. Service elevator equipment as per BC3001.2 & 27-987. Upon inspection, the only device in the section of the building is found to be out of service, creating$1K due
ECB04/24/2026At time of inspection, observed the HVAC system in 1ST lobby, 11 and 12 floor hall way is not functional, not throwing out cold air nor giving out heat, building maintenance manager turned it on waited for abou$6K due
ECB03/30/2026Failure to install grounding electrode conductor in accordance with section. Observed in the main electrical rm in the sub cellar that no electrode ground was not installed. Potential for shock and lost of grou$24K due
ECB03/30/2026Electrical closet not dedicated to electrical distribution equipment only. Observed on 10TH, 7TH, 3RD fls that the electrical closet was telephone, wifi, data equipment installed. All electrical closets/ rms sh$6K due
ECB03/11/2025Failure to maintain building in code-compliant manner: no fire stopping per bc 712.3 (2014 code); 27-345; bc 711.2.4 (2022 code. At time of inspection observed ac unit installed into wall, and hole penetrationNothing owed — awaiting certificate of correction