← Back
One story - permanent living quarter
61 DELAWARE AVENUE
STATEN ISLAND · BIN 5048498
💬 Discuss this project
1920Year Built
1.5Stories
A2Building Class
R3XZoning
906 sfGross Floor Area
1Units
One story - permanent living quarter · 3,975 sf lot · 0.23 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof3p · 2 filings · 20 docs
Floor 11p · 2 filings · 20 docs
Cellar6p · 2 filings · 20 docs
Basement1p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
IJKIM ARCHITECT PLLC407/29/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IJKIM ARCHITECT PLLC2508205/02/2023
Building Lifecycle
All (38)Filed (4)Objection (4)Special Inspection (30)
07/29/2025
Filed — Alteration CO
Subsequent filing to perform plumbing work relevant to ALT-CO (Job # S00867306), which is an existing single-family house enlargement/ addition with interior renovation work. Scope includes relocate/ replace the existing and installing new fixtures.
S00867306-S1
07/29/2025
Special inspection requirement — Energy Code Compliance Inspections
iljoong kim
07/15/2025
Filed — Alteration CO
Subsequent filing to perform plumbing work relevant to ALT-CO (Job # S00867306), which is an existing single-family house enlargement/ addition with interior renovation work. Scope includes relocate/ replace the existing and installing new fixtures.
S00867306-S2
01/10/2025
Objection resolved — Addressed
09/05/2024
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
08/12/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
06/12/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
iljoong kim
07/24/2023
Special inspection requirement — HVAC-R and service water heating equipment
iljoong kim
07/24/2023
Special inspection requirement — HVAC-R and service water heating system controls
iljoong kim
07/24/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
iljoong kim
07/24/2023
Special inspection requirement — Maintenance information
iljoong kim
05/15/2023
Objection raised — Zoning
05/02/2023
Filed — Alteration CO
Subsequent filing to perform plumbing work relevant to ALT-CO (Job # S00867306), which is an existing single-family house enlargement/ addition with interior renovation work. Scope includes relocate/ replace the existing and installing new fixtures.
S00867306-I1
04/30/2023
Special inspection requirement — Lighting in dwelling units
iljoong kim
04/30/2023
Special inspection requirement — Structural Steel - Details
iljoong kim
04/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
iljoong kim
04/30/2023
Special inspection requirement — Insulation placement and R values
iljoong kim
04/30/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
iljoong kim
04/30/2023
Special inspection requirement — HVAC-R and service water heating system controls
iljoong kim
04/30/2023
Special inspection requirement — Air barrier - visual inspection
iljoong kim
04/30/2023
Special inspection requirement — Fenestration areas
iljoong kim
04/28/2023
Special inspection requirement — Footing and Foundation
iljoong kim
04/28/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
iljoong kim
04/28/2023
Special inspection requirement — Mechanical Systems
iljoong kim
04/28/2023
Special inspection requirement — Final
iljoong kim
04/12/2023
Objection raised — Zoning
04/12/2023
Objection raised — Structural
04/04/2023
Filed — Alteration
Vertical and horizontal enlargements with interior renovation for an existing single family house. Proposed scope of work includes General Construction, Structural, and Mechanical.
S00844131-I1
03/23/2023
Special inspection requirement — Wood – Seismic Resistance
03/23/2023
Special inspection requirement — Structural Steel - Details
03/15/2023
Special inspection requirement — Concrete - Cast-In-Place
iljoong kim
03/15/2023
Special inspection requirement — Vertical Masonry Foundation Elements
iljoong kim
03/15/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
iljoong kim
03/14/2023
Special inspection requirement — Insulation placement and R values
iljoong kim
03/14/2023
Special inspection requirement — Lighting in dwelling units
iljoong kim
03/14/2023
Special inspection requirement — Air barrier - visual inspection
iljoong kim
03/14/2023
Special inspection requirement — Fenestration areas
iljoong kim
03/14/2023
Special inspection requirement — HVAC-R and service water heating equipment
iljoong kim
Nothing on file for this building.
2 projects · most recent 07/29/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/29/2025——Heating and Air Conditioning Systems
Heat / Cool
04/04/2023——Heating and Air Conditioning Systems
Heat / Cool
1 project · most recent 07/29/2025
Gas Water/Sanitary
FiledStatusContractorScope
07/29/2025——Gas, Water/Sanitary
2 projects · most recent 07/29/2025
Steel Concrete Wood
FiledStatusContractorScope
07/29/2025——Steel, Concrete, Wood
04/04/2023——Steel, Concrete, Wood
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
07/29/2025Energy Code Compliance Inspectionsiljoong kimprogress
09/05/2024Construction Utilizing CLT or SCL, Type IV—special
08/12/2024Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
06/12/2024HVAC-R and service water piping design and insulationiljoong kimenergy_progress
07/24/2023HVAC-R and service water heating equipmentiljoong kimenergy_progress
07/24/2023HVAC-R and service water heating system controlsiljoong kimenergy_progress
07/24/2023HVAC-R and service water piping design and insulationiljoong kimenergy_progress
07/24/2023Maintenance informationiljoong kimenergy_progress
04/30/2023Lighting in dwelling unitsiljoong kimenergy_progress
04/30/2023Structural Steel - Detailsiljoong kimspecial
04/30/2023HVAC-R and service water heating equipmentiljoong kimenergy_progress
04/30/2023Insulation placement and R valuesiljoong kimenergy_progress
04/30/2023Fenestration and door U-factor and product ratingsiljoong kimenergy_progress
04/30/2023HVAC-R and service water heating system controlsiljoong kimenergy_progress
04/30/2023Air barrier - visual inspectioniljoong kimenergy_progress
04/30/2023Fenestration areasiljoong kimenergy_progress
04/28/2023Footing and Foundationiljoong kimprogress
04/28/2023Structural Stability – Alterations of existing buildingsiljoong kimspecial
04/28/2023Mechanical Systemsiljoong kimspecial
04/28/2023Finaliljoong kimprogress
03/23/2023Wood – Seismic Resistance—special
03/23/2023Structural Steel - Details—special
03/15/2023Concrete - Cast-In-Placeiljoong kimspecial
03/15/2023Vertical Masonry Foundation Elementsiljoong kimspecial
03/15/2023Fenestration and door U-factor and product ratingsiljoong kimenergy_progress
Latest 25 of 36.
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/18/2026S00867306-S2Request digital key ↗
08/18/2026S00867306-S1Request digital key ↗
08/18/2026S00867306-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
06/10/2024540256131Open ↗
▸BISBPP-16 - Application for waiver of curb alignment and/or sidewalk and curb1
05/10/2024540256131Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S00867306-I1Open ↗
08/13/2026S00844131-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00867306-I1Open ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature8
08/29/2026S00867306-I1Open ↗
08/29/2026S00867306-I1Open ↗
08/29/2026S00867306-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026S00867306-I1Open ↗
08/29/2026S00867306-I1Open ↗
08/29/2026S00867306-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026S00867306-S2Open ↗
08/13/2026S00867306-S1Open ↗
08/13/2026S00867306-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/10/2024540256131Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/10/2024540256131Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026S00867306-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026S00844131-I1Open ↗
08/13/2026S00867306-S1Open ↗
08/13/2026S00867306-I1Open ↗
▸Inspections & Test Reports2
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
05/10/2024540256131Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S00867306-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
06/10/2024540256131Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
05/10/2024540256131Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
05/10/2024540256131Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial2
08/13/2026S00867306-I1Open ↗
08/13/2026S00844131-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00844131-I1Open ↗
08/13/2026S00867306-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026S00867306-I1Open ↗
08/13/2026S00844131-I1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
05/30/2024540256131Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026S00867306-I1Open ↗