RoofUnder Construction2p · 2 filings · 20 docs
ArchitectureStructural
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT.
On file for this project
23 documents · 1 drawing sheet
Floor 36Under Construction8p · 1 filing · 20 docs
Plumbing
Issued Permit Scope
Plumbing
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents
Floor 35Under Construction15p · 2 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents · 2 drawing sheets
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Floor 34Under Construction13p · 2 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Floor 33Under Construction16p · 2 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents · 3 drawing sheets
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Floor 32Under Construction13p · 2 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Floor 31Under Construction13p · 2 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Floor 30Under Construction13p · 2 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Floor 29Under Construction13p · 2 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Floor 28Under Construction16p · 2 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents · 3 drawing sheets
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Floor 27Under Construction17p · 3 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents · 3 drawing sheets
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Structural work for Renovation on all Building Floors, Structural work is to create a New Floor Opening, includes installation of New Steel Reinforcement to frame out the New Proposed Floor Opening being created.
On file for this project
23 documents · 1 drawing sheet
Floor 26Under Construction16p · 2 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents · 3 drawing sheets
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Floor 25Under Construction16p · 2 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents · 3 drawing sheets
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Floor 24Under Construction15p · 2 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents · 2 drawing sheets
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Floor 23Under Construction15p · 2 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents · 2 drawing sheets
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Floor 22Under Construction16p · 3 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents · 2 drawing sheets
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Structural work for Renovation on all Building Floors, Structural work is to create a New Floor Opening, includes installation of New Steel Reinforcement to frame out the New Proposed Floor Opening being created.
On file for this project
23 documents · 1 drawing sheet
Floor 21Under Construction17p · 3 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents · 3 drawing sheets
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Structural work for Renovation on all Building Floors, Structural work is to create a New Floor Opening, includes installation of New Steel Reinforcement to frame out the New Proposed Floor Opening being created.
On file for this project
23 documents · 1 drawing sheet
Floor 20Under Construction18p · 2 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents · 5 drawing sheets
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Floor 19Under Construction15p · 2 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents · 2 drawing sheets
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Floor 18Under Construction13p · 2 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Floor 17Under Construction13p · 2 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Floor 16Under Construction16p · 3 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
No filed description on record for this project.
On file for this project
36 documents · 3 drawing sheets
Floor 15Under Construction15p · 3 filings · 20 docs
ArchitectureFire ProtectionGeneralPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
No filed description on record for this project.
On file for this project
18 documents · 2 drawing sheets
Floor 14Under Construction13p · 2 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Floor 13Under Construction13p · 2 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Floor 12Under Construction13p · 2 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Floor 11Under Construction13p · 2 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Floor 10Under Construction13p · 2 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Floor 9Under Construction13p · 2 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Floor 8Under Construction13p · 2 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Floor 7Under Construction13p · 2 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Floor 6Under Construction13p · 2 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Floor 5Under Construction13p · 2 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Floor 4Under Construction13p · 2 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Floor 3Under Construction18p · 3 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents · 4 drawing sheets
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Structural work for Renovation on all Building Floors, Structural work is to create a New Floor Opening, includes installation of New Steel Reinforcement to frame out the New Proposed Floor Opening being created.
On file for this project
23 documents · 1 drawing sheet
Floor 2Under Construction18p · 3 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents · 4 drawing sheets
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Structural work for Renovation on all Building Floors, Structural work is to create a New Floor Opening, includes installation of New Steel Reinforcement to frame out the New Proposed Floor Opening being created.
On file for this project
23 documents · 1 drawing sheet
Floor 1Under Construction19p · 3 filings · 20 docs
ArchitectureDMMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents · 5 drawing sheets
9th Cycle FISP repairs. No change to use, occupancy or egress.
On file for this project
7 documents
Structural work for Renovation on all Building Floors, Structural work is to create a New Floor Opening, includes installation of New Steel Reinforcement to frame out the New Proposed Floor Opening being created.
On file for this project
23 documents · 1 drawing sheet
CellarUnder Construction12p · 5 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
Plumbing
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents · 2 drawing sheets
Structural work for Renovation on all Building Floors, Structural work is to create a New Floor Opening, includes installation of New Steel Reinforcement to frame out the New Proposed Floor Opening being created.
On file for this project
23 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Sub-CellarUnder Construction15p · 5 filings · 20 docs
ArchitectureDMGeneralMechanicalPlumbing
Issued Permit Scope
Plumbing
Replacement of AIR HANDLING UNIT AT FIRST FLOOR LOBBY, PROVIDE ACCESS PANELS AS NEEDED, REPAIR CEILING, PLASTER, PRIME AND PAINT AS NEEDED. THIS APPLICATION IS BEING FILED IN CONJUNCTION TO M01001302-l1-GC & M01001302-S1-PL
On file for this project
25 documents · 3 drawing sheets
REMOVE ONE ABOVE-GROUND FUEL OIL STORAGE TANK AND PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
INSTALL TWO (2) REPLACEMENT GAS/OIL BURNER ON TWO (2) EXISTING LOW PRESSURE BOILERS. INSTALL REPLACEMENT BOILER FEED UNIT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
9 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.