Office with commercial, 1-6 stories
610 DEAN STREET
BROOKLYN · BIN 3027861
💬 Discuss this project
1930Year Built
5Stories
O5Building Class
M1-1Zoning
15,187 sfGross Floor Area
5Units
2 Open Violations ▸FDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: 610 DEAN LLC · 39,359 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof3p · 2 filings · 20 docs
Floor 5Under Construction25p · 4 filings · 20 docs
Floor 4Under Construction34p · 5 filings · 20 docs
Floor 3Under Construction26p · 4 filings · 20 docs
Floor 2Under Construction35p · 6 filings · 20 docs
Floor 1Under Construction42p · 6 filings · 20 docs
CellarUnder Construction31p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UTAH COMPANY OF NEW YORK303/22/2026
LORAGE OPERATING CORP103/22/2026
LORAGE OPERATION CORP103/22/2026
ULANO803/22/2026
VILANO CORP103/22/2026
DIAGRAVURE FILM MFG CO103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/22/2022$1.9M—— → —$122/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GARY H SILVER ARCHITECTS PC2403/21/2026
ARC-HI-TECT ASSOCIATE203/21/2026
SHEIKH EXPEDITING203/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KM CONSTRUCTION GROUP INCGeneral Contractor2607/08/2026
UNITED KING CONSTRUCTIONGeneral Contractor603/21/2026
M.M CONSTRUCTION & BUILDERSGeneral Contractor507/08/2026
DOUG'S PLBG & HTG SERV COFire Protection107/08/2026
GO PRO FIRE PROTECTION CFire Protection107/08/2026
SIGNORE & SONS PLBG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EP INSPECTIONS AND COMMIS70791307/30/2026
GARY H SILVER ARCHITECTS1382607/30/2026
MJE CONSULTING ENGINEERIN8522109/18/2023
CELIN MUNOZ CONSULTING EN1064207/28/2023
ASSURE PROFESSIONAL ENGIN6962112/13/2022
BANGASH ASSOCIATES INC8488111/12/2022
ARC-HI-TECH ASSOCIATES IN6963107/22/2022
Building Lifecycle
All (162)Filed (19)Permit Issued (25)Signed Off (8)Violation (42)Inspection (9)Objection (29)Special Inspection (30)
07/30/2026
Filed — Alteration
MECHANICAL MODIFICATIONS TO INCLUDE HVAC INSTALLATION ANDINSTALLATION OF ASSOCIATED DUCTWORK. NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01268431-P1
07/22/2026
Special inspection requirement — Air barrier - visual inspection
Gary Silver
07/22/2026
Special inspection requirement — Final
Gary Silver
07/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
Gary Silver
07/22/2026
Special inspection requirement — Lighting controls
Gary Silver
07/22/2026
Special inspection requirement — Fenestration areas
Gary Silver
07/22/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Gary Silver
07/22/2026
Special inspection requirement — Energy Code Compliance Inspections
Gary Silver
07/22/2026
Special inspection requirement — Fenestration air leakage
Gary Silver
07/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
MOLLY GLENN
07/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gary Silver
07/22/2026
Special inspection requirement — Exterior lighting power
Gary Silver
07/22/2026
Special inspection requirement — Interior lighting power
Gary Silver
07/16/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/06/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/30/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/30/2026
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
04/27/2026
Permit issued — General Construction
B01268431-I1-GC
04/23/2026
Permit issued — Mechanical Systems
B01268431-S1-MS
01/05/2026
Signed off — Alteration
MECHANICAL WORK ON PARTIAL CELLAR, PARTIAL 1ST FLOOR, UNIT 2 ON THE 2ND FLOOR AND UNIT 4 ON THE 4TH FLOOR ONLY. MECHCANICAL EQUIPEMENT ON ROOF; NO NEW PENETRATIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B08034089-I1
12/22/2025
Permit issued — Sprinklers
B01268431-S2-EW-SP
12/19/2025
Permit issued — Mechanical Systems
B01268431-S1-MS
12/02/2025
Permit issued — General Construction
B01268431-I1-GC
10/31/2025
Filed — Alteration
MECHANICAL MODIFICATIONS TO INCLUDE HVAC INSTALLATION ANDINSTALLATION OF ASSOCIATED DUCTWORK. NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01268431-S2
10/31/2025
Filed — Alteration
MECHANICAL MODIFICATIONS TO INCLUDE HVAC INSTALLATION ANDINSTALLATION OF ASSOCIATED DUCTWORK. NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01268431-S1
10/21/2025
Special inspection requirement — Energy Code Compliance Inspections
MOLLY GLENN
10/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
MOLLY GLENN
10/21/2025
Special inspection requirement — Sprinkler Systems
MOLLY GLENN
10/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOLLY GLENN
10/20/2025
Permit issued — General Construction
B00998837-I1-GC
09/04/2025
Objection raised — Energy
09/03/2025
Filed — Alteration
MECHANICAL MODIFICATIONS TO INCLUDE HVAC INSTALLATION ANDINSTALLATION OF ASSOCIATED DUCTWORK. NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01268431-I1
08/29/2025
Objection resolved — Addressed
08/22/2025
Special inspection requirement — Duct leakage testing, insulation and design
MOLLY GLENN
08/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
MOLLY GLENN
08/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOLLY GLENN
08/22/2025
Special inspection requirement — Energy Code Compliance Inspections
MOLLY GLENN
08/22/2025
Special inspection requirement — Shutoff dampers
MOLLY GLENN
08/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MOLLY GLENN
08/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
MOLLY GLENN
08/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
MOLLY GLENN
08/22/2025
Special inspection requirement — Maintenance information
MOLLY GLENN
08/21/2025
Special inspection requirement — Mechanical Systems
MOLLY GLENN
08/21/2025
Special inspection requirement — Final
MOLLY GLENN
08/20/2025
Objection raised — Scope
08/14/2025
Filed — Alteration CO
THIS ALT-CO APPLICATION IS FILED TO LEGALIZE EXISTING INTERIM MULTIPLE DWELLING (IMD #30156) AS PER MDL ARTICLE 7B & 7C - CHANGE IN USE FROM MANUFACTURING TO RESIDENTIAL. NO CHANGE IN EGRESS, FLOOR AREA, BULK & HEIGHT UNDER THIS APPLICATION.
B00998837-P1
07/31/2025
Signed off — Alteration
MECHANICAL MODIFICATIONS FOR UNIT 3 & UNIT 5 ON 3RD & 5TH FLOOR LEVELS TO INCLUDE INSTALLATIONS OF 2 NEW VRF SYSTEMS WITH DUCTLESS AIR HANDLERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B08021109-I1
07/31/2025
Signed off — Alteration
PLUMBING AND SPRINKLER WORK IN UNITS 2 - 5 ON 2ND-5TH FLOORS ONLY.
B08022329-I1
07/09/2025
Permit issued — General Construction
B00998837-I1-GC
06/03/2024
Signed off — Alteration
APPLICATION FILE TO EXTERIOR FACADE REPAIR AS BRICK POINTING, CORNICE REPAIR & PARAPET LEVEL MINOR FACE BRICK REPLACE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B08013079-I1
06/02/2024
Permit issued — General Construction
B08013079-I1-GC
05/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Burgess
05/16/2024
Special inspection requirement — Energy Code Compliance Inspections
Christopher Burgess
05/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Burgess
05/14/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/03/2024
Permit issued — General Construction
B08017840-I1-GC
04/30/2024
Filed — Alteration
MECHANICAL WORK ON PARTIAL CELLAR, PARTIAL 1ST FLOOR, UNIT 2 ON THE 2ND FLOOR AND UNIT 4 ON THE 4TH FLOOR ONLY. MECHCANICAL EQUIPEMENT ON ROOF; NO NEW PENETRATIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B08034089-P3
04/30/2024
Filed — Alteration
MECHANICAL MODIFICATIONS FOR UNIT 3 & UNIT 5 ON 3RD & 5TH FLOOR LEVELS TO INCLUDE INSTALLATIONS OF 2 NEW VRF SYSTEMS WITH DUCTLESS AIR HANDLERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B08021109-P3
04/19/2024
Signed off — Alteration
Interior demolition as per plan no change use egress and occupancy
B00779210-I1
04/19/2024
Permit issued — General Construction
B08017840-I1-GC
Latest 60 of 162 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedKM CONSTRUCTION GROUP INC04/27/2026
DOB NOWMechanical SystemsPermit IssuedKM CONSTRUCTION GROUP INC04/23/2026
DOB NOWSprinklersPermit IssuedDOUG'S PLBG & HTG SERV CO12/22/2025
DOB NOWMechanical SystemsPermit IssuedKM CONSTRUCTION GROUP12/19/2025
DOB NOWGeneral ConstructionPermit IssuedKM CONSTRUCTION GROUP12/02/2025
DOB NOWGeneral ConstructionPermit IssuedKM CONSTRUCTION GROUP10/20/2025
DOB NOWGeneral ConstructionPermit IssuedKM CONSTRUCTION GROUP07/09/2025
DOB NOWGeneral ConstructionSigned-offM.M CONSTRUCTION & BUILDE06/02/2024
DOB NOWGeneral ConstructionPermit IssuedKM CONSTRUCTION GROUP05/03/2024
DOB NOWGeneral ConstructionPermit IssuedKM CONSTRUCTION GROUP04/19/2024
DOB NOWSprinklersSigned-offGO PRO FIRE PROTECTION C03/07/2024
DOB NOWMechanical SystemsSigned-offKM CONSTRUCTION GROUP11/02/2023
DOB NOWGeneral ConstructionPermit IssuedKM CONSTRUCTION GROUP11/02/2023
DOB NOWMechanical SystemsSigned-offKM CONSTRUCTION GROUP11/02/2023
DOB NOWSidewalk ShedSigned-offUNITED KING CONSTRUCTION10/17/2023
DOB NOWSidewalk ShedSigned-offUNITED KING CONSTRUCTION10/17/2023
DOB NOWStructuralSigned-offKM CONSTRUCTION GROUP08/11/2023
DOB NOWMechanical SystemsSigned-offKM CONSTRUCTION GROUP07/26/2023
DOB NOWGeneral ConstructionPermit IssuedKM CONSTRUCTION GROUP07/12/2023
DOB NOWSprinklersSigned-offSIGNORE & SONS PLBG CORP07/12/2023
DOB NOWMechanical SystemsSigned-offKM CONSTRUCTION GROUP07/07/2023
DOB NOWStructuralSigned-offM.M CONSTRUCTION & BUILDE03/21/2023
DOB NOWGeneral ConstructionSigned-offM.M CONSTRUCTION & BUILDE02/03/2023
DOB NOWGeneral ConstructionPermit IssuedKM CONSTRUCTION GROUP11/10/2022
DOB NOWGeneral ConstructionSigned-offKM CONSTRUCTION GROUP08/09/2022
BISBLISSUEDACE-ATLAS PLBG & HTG LLC01/15/2013
BISPLISSUEDALADDIN PLUMBING & HEATING12/23/1998
1 project · most recent 07/30/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/30/2026Permit IssuedKM CONSTRUCTION GROUP INCHeating and Air Conditioning Systems
Heat / Cool
Daikin FXA30AAVJU 30,000 BTU · Vrf Indoor ×1
FXSA36AAVJU 36,000 BTU · Vrf Indoor ×1
FXSA54AAVJU 54,000 BTU · Vrf Indoor ×1
RXTA60AAVJU 60,000 BTU · Vrf Outdoor ×1
Indeeco TFZU 7 kW · Ductwork ×1
8 projects · most recent 07/09/2026
General Wiring
FiledStatusContractorScope
07/09/2026Permit IssuedEMPIRE LIC ELECL CONTRSGeneral Wiring
05/11/2024CompleteEVS ELECTRIC CORPGeneral Wiring
12/14/2023CompleteCRESCO ELECTRICAL CORPGeneral Wiring
09/19/2023CompleteRICHARD NEU—
07/31/2023CompleteCRESCO ELECTRICAL CORPGeneral Wiring
07/31/2023CompleteCRESCO ELECTRICAL CORPGeneral Wiring
01/05/2023CompleteEVS ELECTRIC CORPGeneral Wiring
10/24/2022CompleteALLIANCE ELEVATOR COMPANY—
1 project · most recent 09/18/2023
Steel Concrete
FiledStatusContractorScope
09/18/2023Signed-offUNITED KING CONSTRUCTIONSteel, Concrete
1 project · most recent 09/18/2023
Scaffold Sidewalk Shed
FiledStatusContractorScope
09/18/2023Signed-offUNITED KING CONSTRUCTIONScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
07/16/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/06/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/30/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/30/2026Certified Sprinkler - SP - RoughingCertifiedView ↗
05/14/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/18/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/15/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/28/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 97
DateRequirementInspectorRole
07/22/2026Tenant Protection Plan ComplianceMOLLY GLENNspecial
07/22/2026Fire-Resistance Rated ConstructionGary Silverprogress
07/22/2026FinalGary Silverprogress
07/22/2026Energy Code Compliance InspectionsGary Silverprogress
07/22/2026Fire-Resistant Penetrations and JointsGary Silverspecial
07/22/2026Air barrier - visual inspectionGary Silverenergy_progress
07/22/2026Exterior lighting powerGary Silverenergy_progress
07/22/2026Lighting controlsGary Silverenergy_progress
07/22/2026Fenestration and door U-factor and product ratingsGary Silverenergy_progress
07/22/2026Interior lighting powerGary Silverenergy_progress
07/22/2026Fenestration air leakageGary Silverenergy_progress
07/22/2026Fenestration areasGary Silverenergy_progress
10/21/2025Energy Code Compliance InspectionsMOLLY GLENNprogress
10/21/2025Sprinkler SystemsMOLLY GLENNspecial
10/21/2025Tenant Protection Plan ComplianceMOLLY GLENNspecial
10/21/2025Fire-Resistant Penetrations and JointsMOLLY GLENNspecial
08/22/2025Duct leakage testing, insulation and designMOLLY GLENNenergy_progress
08/22/2025Fire-Resistant Penetrations and JointsMOLLY GLENNspecial
08/22/2025Tenant Protection Plan ComplianceMOLLY GLENNspecial
08/22/2025Energy Code Compliance InspectionsMOLLY GLENNprogress
08/22/2025HVAC-R and service water piping design and insulationMOLLY GLENNenergy_progress
08/22/2025HVAC-R and service water heating system controlsMOLLY GLENNenergy_progress
08/22/2025HVAC-R and service water heating equipmentMOLLY GLENNenergy_progress
08/22/2025Shutoff dampersMOLLY GLENNenergy_progress
08/22/2025Maintenance informationMOLLY GLENNenergy_progress
Latest 25 of 97.
▾Documents — 158 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/29/2026B00779210-I1Request digital key ↗
08/28/2026B08017840-P2Request digital key ↗
08/28/2026B08017840-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
05/22/2024301125020Open ↗
01/14/2013320701148Open ↗
▸BISWORK PERMIT APPLICATION2
01/16/2013320701148Open ↗
01/16/2013320701148Open ↗
▸Seals & Professional Certifications88
▸DOB NOWProgress Inspector Seal & Signature34
09/23/2026B08022329-I1Open ↗
09/23/2026B08022329-I1Open ↗
09/01/2026B08034089-I1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature29
09/23/2026B08022329-I1Open ↗
09/01/2026B08034089-I1Open ↗
09/01/2026B08034089-P3Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/28/2026B08017840-P2Open ↗
08/28/2026B08021109-I1Open ↗
08/28/2026B08022329-I1Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
10/09/2013320701148Open ↗
01/23/2013320701148Open ↗
01/14/2013320701148Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/14/2013320701148Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
01/14/2013320701148Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026B00998837-I1Open ↗
08/13/2026B00796026-I1Open ↗
08/13/2026B00998837-P1Open ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/28/2026B08017840-P2Open ↗
08/28/2026B08021109-I1Open ↗
08/28/2026B08022329-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/28/2026B08013079-I1Open ↗
08/21/2026B00998837-I1Open ↗
08/13/2026B00796026-S2Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/14/2013320701148Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
10/09/2013320701148Open ↗
01/14/2013320701148Open ↗
01/14/2013320701148Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/09/2013320701148Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B08034089-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST2
10/09/2013320701148Open ↗
10/09/2013320701148Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
01/14/2013320701148Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
01/11/2013320701148Open ↗
▸Other Documents16
▸DOB NOWLoft Board Certificate14
08/28/2026B08021109-I1Open ↗
08/20/2026B01268431-P1Open ↗
08/13/2026B08034089-P3Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProperty Ownership Certification2
08/21/2026B00998837-I1Open ↗
08/13/2026B00796026-I1Open ↗