General warehouse
610 MORRIS PARK AVENUE
BRONX · BIN 2042906
💬 Discuss this project
1927Year Built
5Stories
E1Building Class
R5Zoning
10,625 sfGross Floor Area
1Units
Rent Stabilized2 Open Violations ▸
General warehouse · Owner of record: 610 MORRIS LLC · 2,375 sf lot · 4.47 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof30p · 2 filings · 20 docs
Floor 524p · 1 filing · 20 docs
Floor 423p · 1 filing · 20 docs
Floor 323p · 1 filing · 20 docs
Floor 223p · 1 filing · 20 docs
Floor 124p · 2 filings · 20 docs
Cellar28p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LEFKO CAPITAL GROUP2807/08/2026
OWNER'S REP1103/22/2026
MORRIS PARK ASSOCIATES1903/22/2026
INNOVATIVE CONSTRUCTION N103/22/2026
MORRIS PARK ASSOCIATION103/22/2026
BLUE SHINE BUILDERS INC DBA BLUE SK103/22/2026
610 MPA2803/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/01/2023$1.7M—610 MPA LLC → 610 MORRIS LLC$160/sf building
01/20/2017$920K—— → —$87/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADB ASSOCIATES708/08/2025
VASILIOS ARTEMIOU PE504/18/2024
ELEVATED ENGINEERING NYC402/01/2024
FL&M ENGINEERING DESIGN &INSPECTION111/13/2023
CROSS ARCHITECTURE303/14/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC2203/21/2026
NYC DESIGN FILE503/21/2026
THE GREEN STUDIO103/21/2026
MILLENNIUM DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INNOVATIVE CONSTR NYC LLCGeneral Contractor1607/08/2026
GWT ENTERPRISES INCGeneral Contractor603/21/2026
MANHATTAN D ENTERPRISESGeneral Contractor603/21/2026
STAR ELEC'L CONTRACTORS CElectrical103/22/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
A. M. PLUMBING COMPANYPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161508/08/2025
Building Lifecycle
All (206)Filed (20)Permit Issued (14)Signed Off (7)Violation (45)Inspection (10)Objection (80)Special Inspection (30)
04/30/2026
Violation issued (HPD, open)
A
04/30/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/22/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
08/22/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
08/22/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
08/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
08/22/2025
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
08/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
08/22/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
08/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
08/22/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
08/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
08/22/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
08/22/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
08/22/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
08/22/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
08/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
08/08/2025
Filed — Alteration CO
Existing 5-Story non-conforming commercial building, to be converted to a 24-Family residential building under Article 5 of ZR.
X08038596-A2
05/13/2025
Filed — Alteration CO
Existing 5-Story non-conforming commercial building, to be converted to a 24-Family residential building under Article 5 of ZR.
X08038596-A1
05/09/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
05/09/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
05/09/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
05/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
05/09/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
05/09/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
05/09/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
05/09/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
05/09/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
05/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
05/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
05/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/09/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
02/25/2025
Filed — Alteration CO
Existing 5-Story non-conforming commercial building, to be converted to a 24-Family residential building under Article 5 of ZR.
X08038596-P9
02/10/2025
Signed off — Alteration CO
Existing 5-Story non-conforming commercial building, to be converted to a 24-Family residential building under Article 5 of ZR.
X08038596-S2
02/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/21/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/09/2024
Signed off — Alteration CO
Existing 5-Story non-conforming commercial building, to be converted to a 24-Family residential building under Article 5 of ZR.
X08038596-S1
05/02/2024
Signed off — Alteration CO
Existing 5-Story non-conforming commercial building, to be converted to a 24-Family residential building under Article 5 of ZR.
X08038596-S3
04/18/2024
Filed — Alteration CO
Existing 5-Story non-conforming commercial building, to be converted to a 24-Family residential building under Article 5 of ZR.
X08038596-P8
04/04/2024
Signed off — Alteration CO
Existing 5-Story non-conforming commercial building, to be converted to a 24-Family residential building under Article 5 of ZR.
X08038596-S4
04/03/2024
Signed off — Alteration
X00958388-I1
04/02/2024
Signed off — Alteration CO
Existing 5-Story non-conforming commercial building, to be converted to a 24-Family residential building under Article 5 of ZR.
X08038596-S6
04/01/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/27/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/14/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/14/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/06/2024
Objection raised — Other
03/06/2024
Objection resolved — Addressed
02/29/2024
Violation issued (ECB, closed)
Unknown
02/28/2024
Objection resolved — Addressed
02/28/2024
Objection resolved — Addressed
02/27/2024
Filed — Alteration CO
Existing 5-Story non-conforming commercial building, to be converted to a 24-Family residential building under Article 5 of ZR.
X08038596-P6
02/27/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/23/2024
Signed off — Alteration CO
Existing 5-Story non-conforming commercial building, to be converted to a 24-Family residential building under Article 5 of ZR.
X08038596-S5
02/23/2024
Objection raised — Other
02/23/2024
Objection resolved — Addressed
02/21/2024
Objection raised — Other
Latest 60 of 206 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offGWT ENTERPRISES INC01/09/2024
DOB NOWSupported ScaffoldSigned-offGWT ENTERPRISES INC01/09/2024
DOB NOWFoundationSigned-offINNOVATIVE CONSTR NYC LLC12/06/2023
DOB NOWMechanical SystemsSigned-offINNOVATIVE CONSTR NYC LLC12/01/2023
DOB NOWStructuralSigned-offINNOVATIVE CONSTR NYC LLC11/29/2023
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE CONSTR NYC LLC11/29/2023
DOB NOWConstruction FenceSigned-offINNOVATIVE CONSTR NYC LLC11/29/2023
DOB NOWSprinklersSigned-offA M B MECHANICAL INC11/15/2023
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES11/14/2023
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE CONSTR NYC LLC11/14/2023
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES11/14/2023
DOB NOWPlumbingSigned-offA. M. PLUMBING COMPANY11/13/2023
DOB NOWStructuralSigned-offINNOVATIVE CONSTR NYC LLC11/08/2023
DOB NOWConstruction FenceSigned-offINNOVATIVE CONSTR NYC LLC10/24/2023
BIS—ISSUEDMADHATTER REALTY,INC04/05/2022
BIS—ISSUEDMADHATTER REALTY INC04/02/2021
BIS—ISSUEDMADHATTER REALTY INC11/22/2019
BISOTISSUEDGERDES HOME IMPROVEMENTS12/05/2016
BISPLISSUEDMODERN CONCEPTS PLUMBING03/03/2016
BISPLISSUEDSCALE PLUMBING CORP08/21/2013
BISPLISSUEDSCALE PLUMBING CORP08/22/2012
BISMHISSUEDBCS CONSTRUCTION SERVICES08/21/2012
BISOTISSUEDBCS CONSTRUCTION SERVICES07/23/2012
BISOTISSUEDFULL LINE CONSTRUCTION INC.05/15/2008
1 project · most recent 08/08/2025
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/08/2025Signed-offINNOVATIVE CONSTR NYC LLCHeating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Amana PTH123G25 12,000 BTU · Ptac ×20
PTH153G25 14,200 BTU · Ptac ×10
PTH073G25 7,600 BTU · Ptac ×2
Daikin 2MXS18NMVJU 18,000 BTU · Heat Pump Outdoor ×1
CTXS07LVJU 7,000 BTU · Fan Coil Indoor ×1
FTXS09LVJU 9,000 BTU · Fan Coil Indoor ×1
Heating
Qmark MUH0381 300 CFM · Electric Heater ×3
LFK-151F 175 CFM ×2
Ventilation
Nutone AEN110 25 CFM · Exhaust Fan ×24
1 project · most recent 08/08/2025
Sprinkler System
FiledStatusContractorScope
08/08/2025Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 08/08/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/08/2025Signed-offA. M. PLUMBING COMPANYGas, Storm, Water/Sanitary
4 projects · most recent 12/12/2023
General Wiring
FiledStatusContractorScope
12/12/2023CompleteSTAR ELEC'L CONTRACTORS C—
11/14/2023CompleteSOLAS ELECTRICAL CORP—
10/26/2023CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
10/26/2023CompleteHIVOLTS ELECTRICAL INC—
1 project · most recent 08/08/2025
Steel Masonry
FiledStatusContractorScope
08/08/2025Signed-offINNOVATIVE CONSTR NYC LLCSteel, Masonry
1 project · most recent 08/08/2025
Fence
FiledStatusContractorScope
08/08/2025Signed-offINNOVATIVE CONSTR NYC LLCFence
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/30/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/21/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/01/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/27/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/14/2024Pass-Final PL - UndergroundPassView ↗
03/14/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/27/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/07/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/10/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 116
DateRequirementInspectorRole
08/22/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/22/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
08/22/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
08/22/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
08/22/2025Fenestration areasFAHAD FATEHenergy_progress
08/22/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
08/22/2025Maintenance informationFAHAD FATEHenergy_progress
08/22/2025Lighting in dwelling unitsFAHAD FATEHenergy_progress
08/22/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
08/22/2025Interior lighting powerFAHAD FATEHenergy_progress
08/22/2025Fenestration air leakageFAHAD FATEHenergy_progress
08/22/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
08/22/2025Lighting controlsFAHAD FATEHenergy_progress
08/22/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
08/22/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
08/22/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
05/09/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/09/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
05/09/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
05/09/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
05/09/2025Fenestration areasFAHAD FATEHenergy_progress
05/09/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
05/09/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
05/09/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
05/09/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
Latest 25 of 116.
▾Documents — 283 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch17
08/22/2026X08038596-S5Request digital key ↗
08/22/2026X08038596-A2Request digital key ↗
08/22/2026X08038596-A1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/26/2026X00331641-I1Request digital key ↗
08/15/2026X00331641-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/26/2026X00332445-I1Request digital key ↗
▸Applications & Permits45
▸BISPLAN / WORK APPROVAL APPLICATION33
07/24/2024220555726Open ↗
07/22/2024220628024Open ↗
05/28/2024240284018Open ↗
Showing 3 of 33 on file for this type
▸BISWORK PERMIT APPLICATION12
04/05/2022220628024Open ↗
04/07/2021220628024Open ↗
11/25/2019220628024Open ↗
Showing 3 of 12 on file for this type
▸Zoning, Tax Lot & Property Records6
▸BISZONING EXHIBIT I: CERTIFICATION2
08/30/2019220628024Open ↗
01/08/2018220628024Open ↗
▸BISZONING DIAGRAM1
05/15/2019220628024Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
01/08/2018220628024Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
01/08/2018220628024Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X08038596-I1Open ↗
▸Seals & Professional Certifications81
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/26/2026X00332445-I1Open ↗
08/26/2026X00331641-I1Open ↗
08/26/2026X00331641-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/21/2026X08038596-P4Open ↗
09/01/2026X08038596-P8Open ↗
09/01/2026X08038596-P8Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
06/20/2018220628024Open ↗
10/20/2017220621192Open ↗
12/21/2016220555726Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/21/2026X08038596-P4Open ↗
09/01/2026X08038596-P8Open ↗
08/29/2026X08038596-S5Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
01/08/2018220628024Open ↗
10/20/2017220621192Open ↗
11/16/2016220555726Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
01/08/2018220628024Open ↗
10/20/2017220621192Open ↗
11/16/2016220555726Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
09/12/2013220198578Open ↗
07/23/2012220198578Open ↗
05/28/2008210051888Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
05/24/2017240184242Open ↗
05/19/2017240183396Open ↗
▸Trade Schedules & Equipment17
▸BISSELF-CERT PLUMBING NOTICE7
04/10/2013220198578Open ↗
04/09/2013220198578Open ↗
04/02/2013220198578Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING6
11/08/2019240184242Open ↗
05/24/2017240184242Open ↗
05/19/2017240183396Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
12/18/2014220331371Open ↗
10/29/2013220331371Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
12/18/2014220331371Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
10/20/2017220621192Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
11/05/2018220628024Open ↗
▸BISTenant Protection Plan and Notes1
10/20/2017220621192Open ↗
▸Environmental & Asbestos28
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
08/26/2026X00332445-I1Open ↗
08/26/2026X00331641-P1Open ↗
08/26/2026X00331641-I1Open ↗
Showing 3 of 18 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
01/08/2018220628024Open ↗
10/20/2017220621192Open ↗
10/20/2017220621192Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
05/28/2008210051888Open ↗
05/15/2008210050120Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
08/22/2012220198578Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
12/21/2016220555726Open ↗
11/16/2016220555726Open ↗
05/26/2016220198578Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
12/21/2016220555726Open ↗
05/26/2016220198578Open ↗
05/04/2016220198578Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/18/2020240184242Open ↗
05/24/2017240184242Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026X08038596-S2Open ↗
08/13/2026X08038596-S1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
01/18/2020240184242Open ↗
01/18/2020240184242Open ↗
06/26/2017240184242Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs25
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
01/03/2017220555726Open ↗
12/21/2016220555726Open ↗
06/10/2016220198578Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
10/28/2019220628024Open ↗
01/08/2018220628024Open ↗
01/08/2018220628024Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
10/28/2019220628024Open ↗
01/17/2019220628024Open ↗
06/20/2018220628024Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
07/23/2012220198578Open ↗
05/28/2008210051888Open ↗
05/15/2008210050120Open ↗
▸BISSUPERSEDING LETTER1
03/04/2016220198578Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT14
02/23/2018220636471Open ↗
01/08/2018220628024Open ↗
10/20/2017220621192Open ↗
Showing 3 of 14 on file for this type
▸Filing & Intake Forms17
▸BISEFILING COVER SHEET8
02/23/2018220636471Open ↗
01/08/2018220628024Open ↗
10/20/2017220621192Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION7
03/17/2021220628024Open ↗
10/21/2020240184242Open ↗
10/28/2019220628024Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
05/24/2017240184242Open ↗
05/19/2017240183396Open ↗
▸Other Documents7
▸DOB NOWProperty Ownership Certification6
08/13/2026X08038596-P3Open ↗
08/13/2026X08038596-A1Open ↗
08/13/2026X08038596-A2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWFinal Survey1
08/13/2026X08038596-I1Open ↗