← Back
Telephone utility
610 WEST 48 STREET
MANHATTAN · Hell's Kitchen · BIN 1087615
💬 Discuss this project
0Year Built
—Stories
U4Building Class
M2-4Zoning
0 sfGross Floor Area
0Units
2 Open Violations ▸
Telephone utility · Owner of record: NEW YORK TELEPHONE CO · 49,254 sf lot · 0 FAR built · Flood zone X500
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire Protection
Roof1p · 2 filings · 13 docs
Floor 322p · 3 filings · 20 docs
Floor 2
Floor 121p · 4 filings · 20 docs
Cellar21p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VERIZON2003/22/2026
VERIZON WIRELESS307/08/2026
NYNEX103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEMSCHICK SILVERMAN ARCHITECTS211/11/2024
ZARO ENGINEERING PC210/11/2024
WFC ARCHITECTS103/06/2024
SCHERER DESIGN GROUP106/30/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.1003/21/2026
CONSTRUCTION PERMIT SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUMMIT INTERIORS, INCGeneral Contractor403/21/2026
ALBA SERVICES INCGeneral Contractor203/21/2026
DENKO MECHANICAL INCFire Protection107/08/2026
E.T. VANDERBECK INCGeneral Contractor107/08/2026
S. TIEGER PLBG. CO., INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER544511/11/2024
SCHERER DESIGN GROUP7921106/30/2022
Building Lifecycle
All (114)Filed (6)Permit Issued (6)Signed Off (4)Violation (60)Inspection (4)Objection (22)Special Inspection (12)
04/28/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/21/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/06/2025
Signed off — Alteration
Filing for proposed mechanical work in the cellar, first & third floors of this building. No change to use, egress, or occupancy under this application.
M00971803-I1
03/28/2025
Signed off — Alteration
Filing for proposed interior work including, but not limited to, removal and addition of non-load bearing walls. No change to use, egress, or occupancy under this application.
M00939224-I1
01/22/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/23/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/17/2024
Permit issued — Mechanical Systems
M00971803-I1-MS
12/16/2024
Permit issued — Sprinklers
M01102837-I1-EW-SP
12/16/2024
Permit issued — Plumbing
M01102837-I1-PL
11/22/2024
Objection resolved — Addressed
11/14/2024
Special inspection requirement — Insulation placement and R values
EUGENE BIFULCO
11/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
11/14/2024
Special inspection requirement — Masonry
EUGENE BIFULCO
11/14/2024
Special inspection requirement — Final
EUGENE BIFULCO
11/14/2024
Special inspection requirement — Lighting controls
EUGENE BIFULCO
11/14/2024
Special inspection requirement — Interior lighting power
EUGENE BIFULCO
11/14/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
EUGENE BIFULCO
11/11/2024
Filed — Alteration
Filing for proposed interior work including, but not limited to, removal and addition of non-load bearing walls. No change to use, egress, or occupancy under this application.
M00939224-P1
11/11/2024
Objection resolved — Addressed
11/11/2024
Objection resolved — Addressed
11/04/2024
Objection resolved — Addressed
11/04/2024
Objection resolved — Addressed
11/04/2024
Objection resolved — Addressed
10/22/2024
Objection raised — Scope
10/22/2024
Objection raised — Other
10/22/2024
Objection raised — Inspections
10/22/2024
Objection raised — Scope
10/22/2024
Objection resolved — Addressed
10/22/2024
Objection raised — Scope
10/22/2024
Objection raised — Structural
10/22/2024
Objection raised — Structural
10/11/2024
Filed — Alteration
Filing for proposed mechanical work in the cellar, first & third floors of this building. No change to use, egress, or occupancy under this application.
M00971803-I1
10/11/2024
Filed — Alteration
Filing for proposed pluming work on the first floor, and sprinkler work in the cellar, first and third floors of this building. No change to use, egress, or occupancy under this application.
M01102837-I1
09/25/2024
Signed off — Alteration
Modification to existing VERIZON site. Replace 11 antennas and 10 RRH units, install 5 filters and 1 antenna, and install 2 cabinets on existing platform on the roof.
M00749753-I1
07/24/2024
Signed off — Alteration
Filing for the removal and construction of east exterior wall as shown on drawings herewith. No change in use, egress or occupancy.
M01001781-I1
04/23/2024
Permit issued — General Construction
M00939224-I1-GC
03/11/2024
Permit issued — General Construction
M01001781-I1-GC
03/06/2024
Filed — Alteration
Filing for the removal and construction of east exterior wall as shown on drawings herewith. No change in use, egress or occupancy.
M01001781-I1
03/05/2024
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
03/05/2024
Special inspection requirement — Fire-Resistance Rated Construction
EUGENE BIFULCO
03/05/2024
Special inspection requirement — Insulation placement and R values
EUGENE BIFULCO
03/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
02/20/2024
Special inspection requirement — Final
EUGENE BIFULCO
11/03/2023
Filed — Alteration
Filing for proposed interior work including, but not limited to, removal and addition of non-load bearing walls. No change to use, egress, or occupancy under this application.
M00939224-I1
10/11/2022
Permit issued — Antenna
M00749753-I1-AN
07/13/2022
Objection raised — Zoning
07/13/2022
Objection resolved — Addressed
07/13/2022
Objection raised — Scope
07/13/2022
Objection resolved — Addressed
07/13/2022
Objection raised — Scope
07/13/2022
Objection resolved — Addressed
07/13/2022
Objection raised — Fire_Protection
07/13/2022
Objection resolved — Addressed
06/30/2022
Filed — Alteration
Modification to existing VERIZON site. Replace 11 antennas and 10 RRH units, install 5 filters and 1 antenna, and install 2 cabinets on existing platform on the roof.
M00749753-I1
12/10/2020
Violation issued (ECB, closed)
Elevators
12/10/2020
Violation issued (ECB, closed)
Elevators
07/31/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 114 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSUMMIT INTERIORS, INC12/17/2024
DOB NOWSprinklersPermit IssuedS. TIEGER PLBG. CO., INC12/16/2024
DOB NOWPlumbingSigned-offS. TIEGER PLBG. CO., INC12/16/2024
DOB NOWGeneral ConstructionSigned-offSUMMIT INTERIORS, INC04/23/2024
DOB NOWGeneral ConstructionSigned-offALBA SERVICES INC03/11/2024
DOB NOWAntennaSigned-offE.T. VANDERBECK INC10/11/2022
BISPLISSUEDAUTHENTIC PLBG CORP01/07/2015
BISMHISSUEDTELCOM ENGINEERING GP INC11/13/2014
BISOTISSUEDTELCOM ENGINEERING GP INC10/31/2014
BISCCISSUEDTISHMAN CONSTRUCTION CORP03/28/2008
BISCCISSUEDTISHMAN CONSTRUCTION CORP03/28/2008
BISCCISSUEDTISHMAN CONSTRUCTION CORP03/28/2008
BISCCISSUEDTISHMAN CONSTRUCTION CORP03/28/2008
BISCCISSUEDTISHMAN CONSTRUCTION CORP03/28/2008
BISBLISSUEDM & A PLUMBING HEATING CORP12/07/2006
BISEQISSUEDATLANTIC HEYDT CORP07/24/2006
BISEQISSUEDATLANTIC HEYDT CORP04/26/2006
BISEQISSUEDATLANTIC HEYDT CORP04/26/2006
BISSDISSUEDPREMIER FIRE SPRINKLER CO INC04/07/2006
BISPLISSUEDOLYMPIC PLBG & HTG SVC IN03/28/2006
BIS—ISSUEDTISHMAN CONSTRUCTION CORP01/12/2006
BISEQISSUEDTISHMAN CONSTRUCTION CORP01/06/2006
BISOTISSUEDFERRANDINO & SON INC12/19/2005
BIS—ISSUEDTISHMAN CONSTRUCTION CORP08/15/2005
BISEQISSUEDTISHMAN CONSTRUCTION CORP07/14/2005
BISEQISSUEDBREEZE NATIONAL INC06/14/2005
BIS—ISSUEDBREEZE NATIONAL INC06/06/2005
BISEQISSUEDB C BUILDERS04/27/2005
BISOTISSUEDBAYSIDE F.O. CORP01/09/1995
1 project · most recent 10/11/2024
FiledStatusContractorScope
10/11/2024Permit IssuedDENKO MECHANICAL INC—
1 project · most recent 10/11/2024
Water/Sanitary
FiledStatusContractorScope
10/11/2024Signed-offDENKO MECHANICAL INCWater/Sanitary
1 project · most recent 11/24/2021
General Wiring
FiledStatusContractorScope
11/24/2021CompleteALLAN/BRITE-WAY ELEC'L COGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/28/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/21/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
11/14/2024Insulation placement and R valuesEUGENE BIFULCOenergy_progress
11/14/2024Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
11/14/2024MasonryEUGENE BIFULCOspecial
11/14/2024FinalEUGENE BIFULCOprogress
11/14/2024Lighting controlsEUGENE BIFULCOenergy_progress
11/14/2024Interior lighting powerEUGENE BIFULCOenergy_progress
11/14/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)EUGENE BIFULCOspecial
03/05/2024Energy Code Compliance InspectionsEUGENE BIFULCOprogress
03/05/2024Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
03/05/2024Insulation placement and R valuesEUGENE BIFULCOenergy_progress
03/05/2024Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
02/20/2024FinalEUGENE BIFULCOprogress
▾Documents — 135 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026M01001781-I1Request digital key ↗
08/26/2026M00971803-I1Request digital key ↗
08/25/2026M00939224-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits22
▸BISPLAN / WORK APPROVAL APPLICATION14
02/13/2024103916540Open ↗
10/13/2023103916540Open ↗
10/13/2023103916540Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION8
01/14/2015122084797Open ↗
11/18/2014122084797Open ↗
11/06/2014122084984Open ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
02/16/2024103916540Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
02/16/2024103916540Open ↗
▸Seals & Professional Certifications42
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION19
08/07/2015122084984Open ↗
08/04/2015122084797Open ↗
08/01/2014122084797Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/02/2026M00749753-I1Open ↗
08/27/2026M01001781-I1Open ↗
08/26/2026M00971803-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
03/25/2008110212109Open ↗
03/25/2008110122493Open ↗
03/25/2008110122484Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
03/25/2008110212109Open ↗
03/25/2008110122493Open ↗
03/25/2008110122484Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026M01001781-I1Open ↗
08/25/2026M01001781-I1Open ↗
08/25/2026M00939224-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/25/2026M01001781-I1Open ↗
08/25/2026M00939224-I1Open ↗
08/25/2026M00939224-I1Open ↗
▸Trade Schedules & Equipment3
▸BISSELF-CERT PLUMBING NOTICE1
05/06/2015122084797Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
10/30/2014122084984Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/01/2014122084797Open ↗
▸Safety & Tenant Protection7
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist6
08/25/2026M00939224-I1Open ↗
08/15/2026M00749753-I1Open ↗
08/13/2026M00939224-P1Open ↗
Showing 3 of 6 on file for this type
▸BISANTI-HARASSMENT CHECKLIST: CLINTON1
10/30/2014122084984Open ↗
▸Environmental & Asbestos18
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
03/25/2008110212109Open ↗
03/25/2008110122493Open ↗
03/25/2008110122484Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWOER: Notice of Satisfaction4
08/15/2026M00749753-I1Open ↗
08/13/2026M00939224-I1Open ↗
08/13/2026M00971803-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice to Proceed4
08/15/2026M00749753-I1Open ↗
08/13/2026M01001781-I1Open ↗
08/13/2026M01102837-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
08/01/2014122084797Open ↗
08/01/2014122084984Open ↗
08/01/2014122084984Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
10/01/2014122084984Open ↗
10/01/2014122084797Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
08/07/2015122084984Open ↗
08/04/2015122084797Open ↗
08/01/2014122084797Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
08/07/2015122084984Open ↗
08/04/2015122084797Open ↗
▸Approvals, Objections & Sign-offs8
▸BISADMINISTRATIVE OBJECTIONS5
03/25/2008110212109Open ↗
03/25/2008110122493Open ↗
03/25/2008110122484Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
08/04/2015122084984Open ↗
08/04/2015122084797Open ↗
06/11/2008110122484Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT9
08/07/2015122084984Open ↗
08/04/2015122084797Open ↗
08/01/2014122084797Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms11
▸BISEFILING COVER SHEET7
08/01/2014122084797Open ↗
08/01/2014122084984Open ↗
03/25/2008110212109Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION4
02/16/2024103916540Open ↗
10/17/2023103916540Open ↗
04/13/2015122084797Open ↗
Showing 3 of 4 on file for this type
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
10/30/2014122084984Open ↗