← Back
BuildNYC
Elevator cooperative
610 WEST END AVENUE
MANHATTAN · BIN 1033312
💬 Discuss this project
1910Year Built
12Stories
D4Building Class
R10AZoning
177,048 sfGross Floor Area
60Units
LL97 CoveredRent Stabilized0 Active Violations 1 old, status unconfirmed ▸FISP: SAFE
Elevator cooperative · Owner of record: 61 West End · 16,365 sf lot · 10.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofTudor Realty Services CORPUnder Construction5p · 3 filings · 20 docs
PenthouseUnit PH, Unit PHB11p · 2 filings · 20 docs
Floor 11Unit 11B, Unit 11E12p · 3 filings · 20 docs
Floor 10
Floor 9
Floor 8
Floor 7Unit 7CUnder Construction10p · 2 filings · 20 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2Unit 2D33p · 4 filings · 20 docs
Floor 1Unit 1D, Unit 2BUnder Construction38p · 5 filings · 20 docs
BasementReplacement of Interior Masonry Wall1p · 1 filing · 4 docs
Sub-BasementReplacement of Interior Masonry Wall2p · 1 filing · 4 docs
Site & exteriorTudor Realty Services CORP29p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
610 West End15703/22/2026
610 West End Corp Tudor Realty1803/21/2026
610 West End Avenuecorporation603/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Nyccode603/21/2026
SKY Management Group603/21/2026
Synergy Building Consultants203/21/2026
J A Expediting2003/21/2026
Municipal Building Consultants503/21/2026
WRG Engineering P C203/21/2026
Green Light Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Andamio ScaffoldingScaffold1407/08/2026
Darby Construction ServiceGeneral Contractor907/08/2026
Awr GroupGeneral Contractor507/08/2026
A.rodriguez ConsGeneral Contractor303/21/2026
Wojtas' Contracting CompanyGeneral Contractor303/21/2026
PMD DevelopmentGeneral Contractor303/21/2026
Integrate Comfort SystemGeneral Contractor303/21/2026
Triple Crown Plumbing & HeatingPlumbing307/08/2026
Integral Electrical PWR & CNTRElectrical203/21/2026
Midland Electrical CoElectrical203/21/2026
BLH Elect'l ContractorsElectrical203/21/2026
Silverman RobertElectrical203/21/2026
Ehh ServicesGeneral Contractor207/08/2026
Orbit Plumbing & HeatingPlumbing207/08/2026
Shaw MechanicalPlumbing207/08/2026
Niche Waterproofingspecialty_contractor104/09/2026
Litco ElectricElectrical103/21/2026
Taylor Fine FinishesGeneral Contractor108/16/2026
Borowide Elect'l ContractorsElectrical103/21/2026
Gabren ElectricElectrical103/21/2026
Construction Services Con NYScaffold107/08/2026
Forte Express P & HPlumbing107/08/2026
Antonio Ceriello ElectricElectrical103/22/2026
R.C.M. ElectricElectrical103/21/2026
Urban MechanicalPlumbing107/08/2026
Manda Electric CompanyElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
The New Black Architectur5899106/15/2026
IP Concrete Testing and I6252103/27/2026
WRG Engineering4403112/10/2025
CMSC6098110/01/2025
EP Inspections and Commis7079811/22/2024
PSI Agency254211/19/2024
AK Engineering678109/10/2024
KZ Engineering4665205/14/2024
Alan Margolin & Associates423104/13/2023
Richard H. Balser Engineering3028209/14/2022
Tectonic Engineering Cons106107/06/2022
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 10, sub-cycle B)
The filing window opened 02/21/2026. 1 Cycle 10 filing on record, latest 07/30/2026
10/21/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/09/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/14/2026
Permit issued — General Construction
M01415848-I1-GC
08/06/2026
Co-op apartment 6D sold for $3,015,000
300 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTaylor Fine Finishes08/14/2026
DOB NOWGeneral ConstructionPermit IssuedEhh Services06/22/2026
DOB NOWGeneral ConstructionPermit IssuedEhh Services06/18/2026
DOB NOWPlumbingSigned-offUrban Mechanical04/02/2026
DOB NOWStructuralSigned-offNiche Waterproofing02/10/2026
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding12/08/2025
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding12/08/2025
DOB NOWGeneral ConstructionPermit IssuedWojtas' Contracting Company11/12/2025
DOB NOWSuspended ScaffoldSigned-offAwr Group05/05/2025
DOB NOWGeneral ConstructionSigned-offDarby Construction Service04/17/2025
DOB NOWGeneral ConstructionSigned-offPMD Development10/16/2024
DOB NOWPlumbingSigned-offForte Express P & H10/15/2024
DOB NOWGeneral ConstructionSigned-offAwr Group08/07/2024
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding07/29/2024
DOB NOWSuspended ScaffoldPermit IssuedAwr Group05/24/2024
DOB NOWPlumbingSigned-offJames Cruz04/19/2024
DOB NOWSuspended ScaffoldSigned-offAwr Group03/29/2024
DOB NOWMechanical SystemsSigned-offDarby Construction Service03/22/2024
DOB NOWGeneral ConstructionSigned-offAwr Group09/18/2023
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding08/07/2023
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding08/01/2023
DOB NOWSupported ScaffoldPermit IssuedConstruction Services Con NY07/18/2023
DOB NOWMechanical SystemsSigned-offIntegrate Comfort System05/01/2023
DOB NOWPlumbingSigned-offJames Cruz04/21/2023
DOB NOWMechanical SystemsSigned-offDarby Construction Service04/20/2023
DOB NOWStructuralSigned-offDarby Construction Service04/13/2023
DOB NOWGeneral ConstructionSigned-offDarby Construction Service04/13/2023
DOB NOWPlumbingSigned-offTriple Crown Plumbing & Heating02/03/2023
DOB NOWPlumbingSigned-offTriple Crown Plumbing & Heating12/29/2022
DOB NOWGeneral ConstructionSigned-offAwr Group09/16/2022
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding08/11/2022
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding08/09/2022
DOB NOWPlumbingSigned-offTriple Crown Plumbing & Heating06/28/2022
DOB NOWGeneral ConstructionPermit IssuedRodcon Group06/22/2022
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding09/07/2021
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating12/09/2020
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating10/15/2019
BISOTISSUEDBlondies Treehouse06/22/2020
BISOTISSUEDScordio Construction10/09/2019
BISOTISSUEDIntegrate Comfort System04/26/2019
+ 47 more permits on file
1 project · most recent 03/27/2026
Air Conditioning Systems
FiledStatusContractorScope
03/27/2026Permit IssuedEhh ServicesAir Conditioning Systems
3 projects · most recent 06/15/2026
Water/Sanitary Gas
FiledStatusContractorScope
06/15/2026——Gas, Water/Sanitary
03/27/2026Signed-offUrban MechanicalWater/Sanitary
09/23/2022Signed-offTriple Crown Plumbing & HeatingWater/Sanitary
12 projects · most recent 08/19/2026
General Wiring
FiledStatusContractorScope
08/19/2026CompleteAscuatech Electrical—
02/25/2026Permit IssuedNY City ElectricGeneral Wiring
01/02/2026CompleteBorowide Elect'l Contractors—
11/17/2025Permit IssuedNY City ElectricGeneral Wiring
04/14/2025CompleteA.C. Morgan ElectricGeneral Wiring
05/16/2024CompleteAntonio Ceriello ElectricGeneral Wiring
05/16/2024Permit IssuedSuper Charged ElectricGeneral Wiring
02/14/2024CompleteAccurate Electrical ContractorsGeneral Wiring
07/10/2023CompleteGT Electrical CompanyGeneral Wiring
04/19/2023Permit IssuedGT Electrical Company—
09/08/2021CompleteBorowide Elect'l Contractors—
02/16/2019Permit IssuedEis Electric Corp DbaGeneral Wiring
1 project · most recent 07/17/2023
Scaffold
FiledStatusContractorScope
07/17/2023Permit IssuedConstruction Services Con NYScaffold
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
10/21/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/09/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/22/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/31/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/17/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/16/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/30/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
06/11/2026Fire-Resistant Penetrations and JointsNeil Schwartzspecial
06/11/2026Lighting in dwelling unitsNeil Schwartzenergy_progress
06/11/2026FinalNeil Schwartzprogress
10/17/2025Fire-Resistant Penetrations and JointsEDUARD GRINFELDspecial
08/20/2025FinalMARCUS ZIEMKEprogress
12/03/2024Fire-Resistant Penetrations and JointsChristopher Burgessspecial
12/03/2024HVAC-R and service water heating equipmentChristopher Burgessenergy_progress
12/03/2024Duct leakage testing, insulation and designChristopher Burgessenergy_progress
12/03/2024HVAC-R and service water heating system controlsChristopher Burgessenergy_progress
12/03/2024HVAC-R and service water piping design and insulationChristopher Burgessenergy_progress
12/03/2024Energy Code Compliance InspectionsChristopher Burgessprogress
12/03/2024FinalChristopher Burgessprogress
12/03/2024Mechanical SystemsChristopher Burgessspecial
11/12/2024Structural Steel - High Strength Bolting—special
11/12/2024Structural Stability – Alterations of existing buildings—special
09/30/2024HVAC-R and service water heating equipmentChristopher Burgessenergy_progress
09/30/2024FinalChristopher Burgessprogress
09/30/2024Energy Code Compliance InspectionsChristopher Burgessprogress
09/30/2024HVAC-R and service water piping design and insulationChristopher Burgessenergy_progress
09/30/2024Duct leakage testing, insulation and designChristopher Burgessenergy_progress
09/30/2024Mechanical SystemsChristopher Burgessspecial
09/30/2024Fire-Resistant Penetrations and JointsChristopher Burgessspecial
09/30/2024HVAC-R and service water heating system controlsChristopher Burgessenergy_progress
09/17/2024Structural Steel - DetailsMAURICIO ANDRADEspecial
09/17/2024FinalMAURICIO ANDRADEprogress
Latest 25 of 60.
990 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account